ML20203G102
| ML20203G102 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 02/26/1998 |
| From: | Racquel Powell NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Omealia M AFFILIATION NOT ASSIGNED |
| Shared Package | |
| ML20203G108 | List:
|
| References | |
| FOIA-97-469 NUDOCS 9803020196 | |
| Download: ML20203G102 (5) | |
Text
U,b. fwu%L AH HEuuSAIORY COMMEsaute 9,,c,giA etgut3t guy,gsiw Q
FOlA 469 e
}
A RESPONSE TYPE RESPONSE T3 FREEDOM OF l Nat I)(4 P^ati^t 2nc INFORMATION ACT (FO;A) REQUEST
^"
fE8 2 61993
(=cee.
DOCKE 1 NUYBt RIS) 'It appI<able)
HE QUt51E R Michael K. O'Mealia PART l.-AGENCY RECORDS RELE ASED OR NOT LOCATED (See checArdbones/
ND agency records subject to the request have been located.
No additional agency recoids subject to the request have been located.
Requested records are avsilable through another public distribution program. See Comments section.
Agen<.y records subject to the request that are identified in Appendixles) are already avilable for public inspection and copying et the NRC Public Docume. t Room,2120 L Street, N.W., Washington. DC.
Agency records subsect to the request that are identified in Appendantes)
I' are being mads available for public inspection and copying yy ct the NRC Pubhc Docsment Room,2120 L Street, N W., Washington, DC,in a folder under this FOIA number.
The nonpropoetary vervon of the proposaits) that you agreed to accept in a telephone conversation with a member of my stalf is now being made available for public inspection and copying at the NRC Public Document Room. 2120 L Street, N.W., Washington, DC, in a folder under this F OI A number.
Agency records subject to the request that are identified in Appendix (es) may be inspected and copied at the NRC Local Pubhc Docment Room identified in the Comments s>:ction.
Enclosed is information )n how you may obtain access to and the charges for copying records located at the NRC Public Document Room,2120 L Street, N W. Washington. DC.
Agency records subsect to the request are enclosed.
R rcords subject to the request have been referred to another Federal agencybes) for review and direct response to you.
Fees You will be billed ? # the NRC for fees totahng $
You will receive a refund from the NRC in the arnount of $
In view of NRC's response to this request, no further action is being taken on appeal letter dated
, No.
PART 11. A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE C:rtaic. Mformation in the requested racords is being withheld from public disclosure pursuant to the exemptions described in and for the reasons stated in Pa611, B C, and D. Any released portions of the documents for wmch only part of the record is being withheld are being made available for public inspection and copying in the NRC Fublic Document Room,2120 L Street, N.W., Washington, DC in a fold $r under this FOI A number, COMME NTS
/
I W, f
- ?
si(NAN NO pFl ORYATION AND PUBLICATIONS SERVICES
(. y ~ DIRECTOp ' :&yELDO/
I.l!lllll
!I ll
... c 9803020196 900226 PDR FOIA 0'MEALI97-469 PDR sJT FOEM-."* ** art il (191)
\\.
RE: FOlA 97 469 APPENDIX C RECORDS BEING RELEASED IN THEIR ENTIRETY (If copyrighted identify with *)
' RQ, DATE DESCRIPTION /fPAGE COUNT) 1 4/29/92 Memo from Edwsrd Wenzinger to Multiple Addressees, Subject.
Millstone Assessment Panel Initial Meeting (1 page) 2 5/15/92
_ Memo from Jtmes Wiggins to Multiple Addressees,
Subject:
Initial Map Meeting Held on May 6,1992 (2 pages) 3 5/20/92 US. Nuclear Regulatory Commission RI notice of Significant Licensee Meeting (2 pages) 4 5/20/92 Memo from D. Jaffo to Multiple Addressees,
Subject:
Millstone Assessment Panel (1 page) 5 5/27'02 Memo from Thomas Maitin to James Wiggins,
Subject:
Millstone Assessment Panel Charter (2 pages) 6 6/9/92 Memo from Lawrence Doerflein to Millstone Assessment Panel Members,
Subject:
6/11/92 MAP Meeting Agenda (16 pages) 7 6/19/92 Memo from James Wiggins to Multiple Addressees,
Subject:
Second Map Meeting Held on June 11,1992 (3 pages) 8 6/22/92 Lettter from Charles Hehl to John Opeka,
Subject:
6/11/92, Meeting concerning tha Northeast Utilities Performance Enhancement Program (PEP), Docket Nos. 50-245. 50-336 and 50-423, Meeting No. 92 83,(56 pages) 9 7/8/92 Performance Enhancement Program (55 pages) 10 7/14/92 Memo from Richard Barkley to MAP Membership,
Subject:
MAP issue List (5 pages) 11 7/16/91 Memo from D. Jaffe to John Stolz,
Subject:
Outline for MAP Safety Evaluation Millstone Nuclear Power Station, Unit 1,2, and 3, Docket Nos. 50-245,50-336 and 50-423 (5 pages) 12 9/17/92 Letter from James Wiggins to John Opeka,
Subject:
Summary of NRC Millstone Assessment Panel Meeting w/ Northeast Utilities on 7/20/92, Docket Nos. 50-245, 50-336, and 50-423 (8 pages) 4
t
(
13 8/25/92 Memo from David Jaffe to John Stolz,
Subject:
Assignments for the Millstone Assessment Panel (MAP) Safety Evaluation, Docket Nos.
50-245,50-336, and 50-423 (2 pages) 14 8/27/92 Memo from Lt.wrence Doerflein to MAP Members,
Subject:
9/1/92 MAP Meeting (38 pages) 15 8/27/92 Memo from James Wiggins to Multiple Addressees,
Subject:
3rd MAP Meet:ng Held on 7/20/92 (3 pages) 16 8/28/92 Memo from Richard Barkley thru A Blough to James Wiggins,
Subject:
Plan for Reviewing Nort' ast Utilities' Performance Enhancement Program (PEP) (i.ges) 17 10/2/92 Memo from James Wiggins to Multiple Addressees,
Subject:
4th MAP Meeting Held on 9/1/92 (7 pages) 18 11/18/92 Memo from D. Jaffe to John Stolz,
Subject:
Input for Millstone Assessment Panel (MAP) Safety Evaluation (16 pages) 19 12/3/92 Memo from A. Blough to James Wiggins,
Subject:
Recommended Action with Comme-Received from the 11/5/92, Public Meeting on NU's Performance I:nhancement Program (3 pages) 20 12/10/92 Memo from sames Wiggins to MAP Members,
Subject:
6th MAP Meeting Held on 11/5/92 with handwritten annotations, (5 pages) 21 12/18/92 Memo from James Wiggins to MAP Members,
Subject:
7th MAP Meeting Held on 12/14/92 (6 pages) 22 12/21/92 Millstone fax (9 pages) 23 12/23/92 Memo from Lawrence Doerflein to MAP Members,
Subject:
1/13/93 MAP Meeting Agenda (? pages) 24 2/9/93 Memo from James Wiggins to MAP Members,
Subject:
8th MAP Meeting Held on 1/13/92 (4 pages) 25 2/8/93 Letter from James Wiggins to John Opeka,
Subject:
1/13/93, Northeast Utilities Meeting w/ Millstone Assessment Panel Regarding the Performance Enhancement Program (PEP) (59 pages) l 26 2/9/93 MAP Commission Briefing Outline (6 pages) 27 4/5/93 Memo from James Wiggins to MAP Members,
Subject:
9th MAP Meeting Held on 3/2/93 (4 pages) 4 28 7/8/93 Memo from James Wiggins to MAP Members,
Subject:
11th MAP i
Meeting Held on 6/21/93 (5 pages)
.-t 9.
29 4/13/94 Memo from Lawrence Doerflein to MAP Members,
Subject:
4/20/94 MAP Meeting Agenda (2 pages) 30 No date MAP Meeting Minutes (2 pages).
i 31 5/12/94 Memo from R. Kacich, NU, to J. Opeka, NU,
Subject:
Millstone Aassessment Panet Meeting with NU - 4/20/94 (7 pages) 32 5/25/94 MAP Meeting Minutes (6 pages) i p
33 6/?8/94 MAP Meeting Minu'es (2 pages) i-l 34 11/2/94 MAP Meeting Minutes (2 pages)
J 35_
1/5/95 MAP Agenda, with handwritten notes (1 page) 36 1/5/95 MAP Agenda, with handwritten notes. (6 pages) 37 1/5/95 MAP Meeting Minutes (4 pages) 38 1/10/95 Memo from James Andersen to File,
Subject:
Closecut of TAC Nos.
l M83309 and M85997 (1 pages) 39 1/26/95 MAP Meeting Minutes (8 pages) 40 2/16/95 Memo from Thomas Martin to J. Durr and P. Mckee,
Subject:
Millstone Unit 2 Restart Panel (2 pages)
I 41 2/21/95 Handwritten Meeting Notes (2 pages) y
?
42 3/17/45 Letter from Jacque Durr to John Opeka,
Subject:
Millstone Assessment Panel Meeting (24 pages)
L 43 3/17/95 MAP Agenda, with hu + /rittens notes. (4 pages)
I 44 5/3/95 E Mail from Jacque Durr to Multiple Addressees,
Subject:
MAP i
Agenda (3 pages) 45 5/4/95 Millstone Assessment Panel Meeting Minutes (4 pages) 46 6/8 & 6/9/95 Millsone Assessment Panel Meeting Minutes, with handwritten annotaticns. (6 pW 4)-
i 47' 6/13/95 Millsone Assessme ; ?anel Meeting Minutes, with handwritten notes (4 pages) 48L 6/22/95 Millsone Assessment Panel Meeting Minutes (1 page) 4 l
i
.s.
,i
)
. 49 9/12/95 E-Mail from Larry Nicholson to Multiple Addressees,
Subject:
l 1
Inspection Plan (3 pages) 50 9/20/95 Millstone Assessmerit Panel Meeting Minutes (1 page) 51 1/13/96 Letter from Wayne Lanning to Bruce Kenyon, (43 pages) l 52 No date Millstone Oversight Team Meeting (1 page) 53-6/92 Northeast Utilities Performance Enhancement Program Phase il
}
Completion Report (503 pages) 54 5/93 Northeast Utilities Measures of Performance - Nuclear; May 1993.
(95 pages) 55.
2/25/94 Memo from R Laudenat, NU, to Multiple Addressees,
Subject:
PEP December 1993 Progress Report -(109 pages) 56 2/94 Northeast Utilities System Measures of Performance - Nuclear, February 1994 (89 pages) 57 4/20/94 Slides - Millstone Nuclear Power Station MAP Presentation (62 pages) 58 7/5/94 PEP May 1994 Progress Report - Performance Enhanced Program Action Pbn Monthly Progress Rpt. (81 pages) 59-11/94 Northeast Utilities System Measures of Performance - Nuclear, November 1994 (99 pages) 60 6/14/95 Slides of Millstone Nuclear Pwer Station MAP, with handwritten notes. (28 pages) 61 2/21/95 Slides of Millstone Assessment Panel NU Presentation (39 pages) 62 11/30/95 Slides of Millstone Nuclear Power Station MAP Presentation by NU (51 pages) 63 12/95 Northeast Utilities System Measures of Performance - Nuclear.
December 1995. (89 pages) l
December 1,1997 Mr. Carlton C. Kammerer, Director DANNM Division of Freedom ofInformation CaseNct
_97-4/9 t
and Publication Services Date Roott h;t-V-p7 -
/
Office of Administration Men OH-0.S. Nuclear Regulatory Comnu..ssion
-w pgg***
~ /ashington, D.C. 20555 Re: Freedom ofInformation Act Reauest
Dear Mr. Kammerer:
Pursuant to the Freedom of Information Act (5 U.S.C. I 552) and the U.S.
Nuclear Regulatory Commission's (NRC) regulations (10 C.F.R. Part 9, Subpart A), I request all docu:r antation reganling the NRC Millstone Assessment Panel (MAP) from its inception to the present time. 'Ihis information should include, but not be limited to:
- 1. all reconis related to the development of MAP;
- 2. all written records of r.ll meetings held by MAP;
- 3. all formal, infonnal and personal notes taken by panel members and meeting participants at all MAP meetings;
- 4. a'l material prepared for presentation at all MAP meetings, whether actually presented or not;
- 5. allintemal NRC correspondence p,. ped as a result of, or in conjuncuon with, all MAP activities; and
- 6. all records of telephone conversations and teleconferences concerning MAP.
I would appreciate your )rompt response within ten (10) working days of the receipt of this request, as provic ed by 10 C.F.R. Part 9 and the NRC's policies. If you requim additional information, please contact me at M (in r y, i
Michael K. O'Mealia F
Eg,