Discusses Eighth Millstone Assessment Panel 920113 Meeting
ML20203G598
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 02/09/1993
From: Wiggins J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC
Shared Package
ML20203G108 List:
References
FOIA-97-469 NUDOCS 9803030022
Download: ML20203G598 (4)


Text

l MAP Agenda 2 l

i 1 .

Distributions.

J. Wiggins

-J. Stolz Ngd R. Bloug$

J.-Durr - -

W. Pasclak-R. Barkley D. Jaffe P. Swetland V. McCree

~ t

. ' ;.3 ,: . ,.. e. .. v.. ..j.... y., y . pp,. . ; s., .. .. .. ... , y ., , . ..... c. . .. 2 j 7 . . . . . . . y f 4

s. ., : .... .

...s..,,y.....,.4,,,4,...

.f 4

. = = = = = == = - == -==

g30g2990226 ,

O'MEALI97-469 PDR m w

\' I . b ,

ONntD stAtts (8[,-..,b

/'

I NUCLEAR HEGULATORY COMMISSION H[GION 1 o 47s AltlNDAtt ROAD y

[ AING of PitVS$1A, PENNSYLVANIA 194(6 1416 IEI' f 9 (

MEMORANDUM FOR: Millstone Assessment Panel Members FROM: James T. Wiggins, MAP Chairman y

SUIMECT: EIGirrH MAP MEETING IIELD ON JANUARY 13,199k The eighth Millstone Assessment Panel (MAP) meeting was held at the Millstone site resident office from 8:45 a.m. 10:15 a.m. The attendees at the meeting were:

l Panel Members:

Randolph Blough, Chief, DRP Branch 4 lawrence Doerflein, Chief, DRP Section 4A Wr't Pasciak, Chief, Facilities Radiaion Protection Section, DRSS Paul Swetland, Senior Resident Inspector, Millstone James Wiggins, Deputy Director, DRP -

Other Attend tsg:

Richard Barkley, Project Engineer, DRP Section 4A 15 ant Status:

The meeting started with a discussion bypaul Swetland of the status of each of the Millstone Units. Currently, Unit 1 is operating at 100% power. NU is pursuing with the NRC a TS change and temporary waiver to bypass the signal from the main steam line radiation monitors for two hours to avoid the potential of a reactor trip and MSIV isolation while putting a condensate demineralizer in service. In the past, this evolution resulted in the admission of a slug of air into the reactor that resulted in radioactive Nitrogen 16 actuating the main steam line radiation monitors, causing the closure of the main steam isolation valves and a reactor trip. On December 29,1992, spikes were also observed on the MSLRM while placing a condennte demineralizer in service, although no trip setpoints were reached in this case. Unit 2 is operating at 20% power after restarting from the Cycle 11/12 reh.eling and steam generator L replacement outage. An NRC Operational Safety Team inspection (OSTI) has been observing tha restart preparations since December 28,1992; the Gndings of the team are discussed later in l

tLac minutes. Unit 3 is at 100% power after returning a motor driven feedwater pump to service that had previously lir x! power operations. T inadvertent over611ing of the oil lubrication reservoir on the , ,, caused its failure in late December.

i n u,u - -

MAP Minutes #8 2 }

Unk 2 p==8 ant Imaeston Status and Findines:

Rich Barkley p~.sented the MAP with the preliminary findings of the Operational Safety Team Inspection (OSTI) conducted during the period from December 28,1992 - January 14, 1993.

The charter of the team inspection as well as the checklist of restart activities that the MAP requested that the team review is provided as Enclosure 1. Overall, the team found that NNECO ,

satisfactorily completed the refteling and steam generator outage and retumed Unit 2 to se.rvice in a safe and conservative manner. All equipment out of service for maintenance and repairs was returned to service prior to the time required by the Technical Specifications.

The team did note that NNECO did not complete a number of the procedural updates required in light of the plant design changes completed during the outage prior to changing plant modes.

Reviews by the team and discussions with NNECO indicated that the procedure changes that remained to be completM were, for the most paro not very safety significant or were known to  ;

the operators via other means (e.g. training on design changes, night orders) and the procedure .

changes were in the process of being made. Nevertheless, the delays in implementing these.

procedures were inconsistent with administrative procedural requirements, indicative of poor planning and were not consistent with NNECO management's stated goal of enforcing strict procedure compliance, in addition, the team has several concerns with NNECO engineering -

regarding the approval process for design changes and field change requests to modification packages. ,

.)

The team is currently completing their activities, will meet among themselves next week to finalire their findings and will brief NRC management of their conclusions late next week. The final team exit will be conducted with Unit 2 managemen; either by phone or in peron during the week of January 25,1903.

(Action: Complete OSTI draft report, brief NRC management and conduct an exit meeting with NNECO (Barkley - 1/29/93)}

Act!=s Taken in Rw+= to C ==t= RKdved at the Nov=d+r 5.1992 Public Meeting mLthe PEP:

The MAP accepted the recommended NRC actions in response to the comments received at the November 5,1992, public meeting on the PEP. All of the recommended actions were referred to the appropriate parties; the completion of these actions is expected in the near future.

{ Action: Walt Pasclak agived to pursue with his management the completion of the action asigned to his division when he returned to Region 1. (Walt Pasciak - 2/9/93)}

-)

+

y. .

t MAP Minutes #8 3 MAP Meettne with NU on Ja-rv 13. 1993:

Pollowing the MAP meeting, the MAP held a public meeting with Northeast Utilities senior management regarding their progress on the PEP. De results of that meeting will be provided by letter to NU in the near future and sent to those on distribution for these meeting miautes.

l Preparations and Schedule for the Fehmary 9.1993. C--- *- *- Mee'ine: O

\

ne MAP discussed the preparations for the meeting with NU and the Commission tentatively scheduled for February 9,1993. John Stolz drafted a tentative series of slides for the NRC staff to talk from after discussions with DRP. John will coordinate the NRC staffs presentation with NU's presentation to ensure that the two do not overlap.

/

t

{Actiont John Stolz to complete Commission slides, confirm the date of the Commission d

meeting (if it is rescheduled as antielrated) and coordinate the NRC's prtsentation with NU 1,

(Stolz - 2/1/93)}

Note: After the MAP meeting but before issuance of the minutes, the date for the Commission meeting was deferred. John Stolz has action for reschedule, t

Comments on the PEP Review Team Renort/ Status of the SER o i the PEP; The draft report of the PtiP Review Teani was provided to the MAP members for their review and comment at the last meeting. That report will largely form the basis for the draft SER.

The MAP will begin drafting the Safety Evaluation Report on the PEP in the near future. The SER should be in a draft stage at the time of the Commissien meeting and completed shortly thereafter provided no significant concerns with the PEP ve ification and validation program remain (this portion of the PEP is in its infancy and underwent significant revisions in the last several months).

{ Action: Rich Barkley to issue a revised version of the PEP stylew report as well as draft the SER along the format of the SER outline originally provided by NRR (Barkley -

2/1/93)}

{ Action: All MAP members provide detailed review comments on draft PEP review report noted above. (All - Two weeks after distribution.)

Other Millstane Performance issues /Uncominn items of Interest:

The M AP reviewed the status of the MAP Action item List that was approved at the last M AP meeting. Several MAP Action items appea. to be ready for closure, specifically those items dealing with NU's responsiveness to safety concerns and their evaluation of why their self-

'a MAP Minutes #8 4 assessment activities failed to identify and correct their performance problems at Millstone in h'

the 1990-1991 tir:.e period. The responsible M AP members were requested to pursue completion of these items in the near future.

{ Action: Review the MAP Action item list and close those hems that art completed (Doerflein, Barkley - 2/8/93)}

.4hadule for Next MAP Meetinn:

Mr. Wiggins wants the next, MAP meeting to be conducted in Region I on Tuesday, February 23,1993, from 1:30 p.m. - 3:00 p.m. The agenda for the meeting will be provided at a later time. .

- ='fb James T. Wiggins

Enclosure:

Inspection Coverage During Millstone Unit 2 Restart cc w/ enclosure: }

T. Murley, NRP T. Martin, ' < .

W. Kane, DRA W. Russell, NRR J. Partlow, NRR .

J. Calvo, NRR G. Zech, NRR M. Davis, NRR B. Ibger, NRR S. Varga, NRR W. Hodges, DRS R. Cooper, DRSS C. Hehl, DRP V. McCree, DEDR MAP Members

)