MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20196D7021999-06-25025 June 1999 Informs That Reactor Sys Branch Prepared Suppl 1 to GL 83-11 Re Licensee Qualification for Performing Safety Analyses, Which Was Issued on 990624.Matl Related to Subj GL Should Be Placed in PDR & Made Available to Public DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action1999-04-20020 April 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action ML20205J2811999-04-0606 April 1999 Notification of 990422 Meeting for Dockets 7200026 & 7200027 with PG&E in Rockville,Md to Dicuss PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon ML20205B2301999-03-25025 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990125-28 IR 05000275/19993011999-03-25025 March 1999 Forwards NRC Operator Licensing Exam Repts 50-275/99-301 & 50-323/99-301 for Tests Administered on 990125-28 ML20207M3401999-03-0202 March 1999 Notification of Canceled Meeting Scheduled for 990309 Re 7200026 & 7200027 for PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon ML20155H9051998-11-0303 November 1998 Notification of 981117 Meeting for Dockets 7200026 & 7200027 with Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage ML20248K4451998-06-0202 June 1998 Notification of 980617 Meeting W/Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage.Meeting Agenda Encl ML20247G9081998-04-0707 April 1998 Discusses Experts Needed for Plant Life Extension Cases,Per 980403 Discussion ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20134P2231997-02-20020 February 1997 Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122 NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20134B5061994-04-13013 April 1994 Submits Plants Which Will Be Discussed in Categories Indicated Re Results of Screening Meetings for June 1994. Partially Deleted ML20057A9941993-09-14014 September 1993 Forwards NRC Proposed Transcript Corrections ML20056E5141993-08-12012 August 1993 Submits SALP Schedule for FY94 Per Mgt Directive 8.6 ML20127P4161993-01-19019 January 1993 Provides Summary of 930113 Operators Reactors Events Briefing.List of Attendees & Viewgraphs of Elements Discussed Encl ML20126F0201992-12-16016 December 1992 Discusses Discrepancies in Svcs Rendered for 3rd & 4th Quarters of 1991 & 1st,2nd & 3rd Quarters of 1992.TLD Program for Humbolt Bay Site Did Not Strictly Follow Ltr of Contract ML20127D4321992-09-0101 September 1992 Forwards 920818 Petition Submitted by N Culver on Behalf of San Luis Obispo Mothers for Peace,Filed in Response to NRC Notice of Issuance of Amend to Licenses for Plant,Extending Expiration Date from 080423 to 210922 ML20058P5021990-08-15015 August 1990 Forwards Three Analyses of Shutdown Events Evaluated by Accident Sequence Precursor Program ML20247M1881989-05-26026 May 1989 Notification of 890613,14 & 15 Meetings W/Util in San Francisco,Ca to Discuss PRA Topics Re NRC Questions on long-term Seismic Program ML20154E5121988-05-0909 May 1988 Requests That Zip Code for Judge Es Bowers Address Be Changed as Stated,Per Iw Smith Request.Related Correspondence ML20153E3031988-05-0303 May 1988 Forwards NRR Input to Status of Regulatory Activities at Plants,In Response to J Curtis Request for Info ML20153E3381988-04-21021 April 1988 Requests Input on Status of Regulatory Activities for Listed Plants,Status of EPRI Research for RES & Status of California Low Level Waste Program.Response Requested by 880505 ML20151D4271988-03-24024 March 1988 Submits Summary of Actions Discussed at ACRS 335th Meeting on 880310-12 in Washington,Dc,Including ACRS Repts/ Recommendations,Other Actions,Agreements,Assignments & Requests & Future Agenda ML20148G2281988-03-22022 March 1988 Advises That Time for Commission to Review Naslap Decision (ALAB-880) Expired.Commission Declined Review.Decision Became Final Agency Action on 880318.Served on 880323 ML20148D9491988-03-15015 March 1988 Discusses 880315 Operating Reactors Events Meeting 88-11. List of Attendees,Events Discussed & Tabulation of long-term Followup Assignments Detailed in Encls ML20236R7551987-11-20020 November 1987 Informs That Time Provided by NRC Regulations within Which Commission May Act to Review ALAB-877 Expired.Commission Declined Review.Decision Became Final Agency Action on 871117.Served on 871120 ML20236N8421987-11-12012 November 1987 Documents Reconstitution of Aslab for OL Amend Proceeding to Consist of as Rosenthal,Cn Kohl & Ha Wilber.Related Correspondence ML20236H2821987-10-30030 October 1987 Informs That Time Provided within Which Commission May Act to Review ALAB-873 Expired.Commission Declined Review. Decision Became Final Agency Action on 871028.Served on 871102 ML20235H6291987-09-25025 September 1987 Informs of Reconstitution of Aslab Consisting of Author as Chairman & TS Moore & Ha Wilber as Members ML20234F3831987-09-14014 September 1987 Documents Results of Exam of Bolted Connections of Raceway Supports at Plant.Exam Conducted Due to Allegations Received Re Adequacy of Anchor Bolts Securing Raceway Supports to Concrete ML20238A6481987-08-17017 August 1987 Forwards Page 7 of 870813 Pleading Entitled, Response of NRC Staff to Licensing Board Order of 870732 (Directing Parties to File Comments on Applicability of Appeal Boards Decision...), Which Was Inadvertently Omitted ML20195F8261987-08-0707 August 1987 Forwards Listed Data Tables for Use in Preparing Performance Analyses for Plant,Per DF Kirsch 870728 Memo.Salp Performance Analyses Should Be Submitted to J Burdoin by 870825 ML20235M1861987-07-13013 July 1987 Forwards Complete Footnote 5 as Appearing on Pages 8 & 9 of 870710 Answer to Sierra Club Motion to Admit Contention Re Generic Issue 82 & to Direct Preparation of Eis. Due to Quirk in Programming,Not All of Footnote 5 Printed ML20235G5441987-07-0808 July 1987 Forwards NRC Staff Proposed Findings of Fact & Conclusions of Law in Form of Initial Decision Re Licensee Amend Request to Expand Spent Fuel Pools at Plant ML20234F5101987-07-0606 July 1987 Informs of Large Number of Limited Appearance Statements Filed in Proceeding.Documents Will Not Be Served,Per Board Chairman Discussions.Documents Will Be Made Part of Official Record & Will Be Available for Insp.Served on 870706 ML20216D0931987-06-22022 June 1987 Forwards Transcript Pages 65-68 of J Mcdermott Limited Appearance Statement on 870615 Re Defective Weld at Plant Approved by QC Inspector for Appropriate Action.Served on 870624 ML20214T2031987-06-0505 June 1987 Forwards NRC Staff Disk in Ascii Form,Containing Staff Testimony & Draft Proposed Findings of Fact & Conclusions of Law,Per ASLB 870522 Memorandum & Order.Requests Database Compiled by ASLB Be Provided on Encl Blank Disks ML20214W5681987-06-0505 June 1987 Forwards List of Exhibits Intended to Be Offered by Sierra Club in Upcoming Hearing in Proceeding Re Spent Fuel Pool. List Received Too Late for Inclusion in to ASLB ML20214T1581987-06-0404 June 1987 Forwards NRC Staff Testimony of Hg Ashar,Hm Fishman,G Degrassi,Wl Brooks & a Singn on Sierra Club Contentions I(A)3 & 4;I(B)2,8 & 9;II(A)1-9 & II(B)1-9 & Dp Cleary on Sierra Club Contention I(B)7,per ASLB 870128 & 0409 Orders ML20214T2251987-06-0303 June 1987 Confirms 870602 Telcon Informing ASLB of Staff Intention to Offer Listed Documents as Staff Exhibits in Upcoming Hearing on Spent Fuel Pool ML20195G2301987-06-0202 June 1987 Discusses Plans for Response to Lessons Learned from Plant 870410 Loss of RHR Event.Crgr Review of 50.54(f) Ltr Providing Addl Info Requested at Earliest Opportunity ML20149M6491987-05-29029 May 1987 Forwards Proposed 10CFR50.54(f) Ltr Currently Being Reviewed for Transmittal to CRGR on 870602.Comments,if Necessary, Requested by 870601 ML20214L5831987-05-21021 May 1987 Summarizes 870519 Operating Reactors Events Meeting 87-15 to Brief Senior Managers from Nrr,Res,Aeod & Regional Ofcs on Events Which Occurred Since 870512 Meeting.Events Discussed & Significant Elements of Events Encl ML20245B1911987-05-18018 May 1987 Presents Composite Set of NRC & Industry Recommended Remedial Actions Based on 1985 AEOD Case Study Rept C503 Re DHR Problems for PWR Operation.Table 1 Presenting Chronology of 37 events,cost-benefit Analysis & Related Info Encl IA-87-714, Presents Composite Set of NRC & Industry Recommended Remedial Actions Based on 1985 AEOD Case Study Rept C503 Re DHR Problems for PWR Operation.Table 1 Presenting Chronology of 37 events,cost-benefit Analysis & Related Info Encl1987-05-18018 May 1987 Presents Composite Set of NRC & Industry Recommended Remedial Actions Based on 1985 AEOD Case Study Rept C503 Re DHR Problems for PWR Operation.Table 1 Presenting Chronology of 37 events,cost-benefit Analysis & Related Info Encl ML20214A5501987-05-14014 May 1987 Partially Deleted Memo Re Recommendation for Diablo Canyon Board Notification Concerning 831019 Allegations ML20214A0311987-05-12012 May 1987 Notifies of 870514 Briefing on Licensing & Operational Status of Plants Assigned to Project Directorate V,Including Diablo Canyon,Palo Verde,Rancho Seco,San Onfore,Trojan & WPPSS 2 ML20215H9221987-05-0707 May 1987 Submits Results of Lll Exam of Facility Raceway Support Bolted Connections.Exams Conducted Due to Allegations Re Adequacy of Anchor Bolts & Feedback from Lll That Adequacy of Bolting Might Be Safety Issue 1999-08-27
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20196D7021999-06-25025 June 1999 Informs That Reactor Sys Branch Prepared Suppl 1 to GL 83-11 Re Licensee Qualification for Performing Safety Analyses, Which Was Issued on 990624.Matl Related to Subj GL Should Be Placed in PDR & Made Available to Public DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action1999-04-20020 April 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action ML20205J2811999-04-0606 April 1999 Notification of 990422 Meeting for Dockets 7200026 & 7200027 with PG&E in Rockville,Md to Dicuss PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon IR 05000275/19993011999-03-25025 March 1999 Forwards NRC Operator Licensing Exam Repts 50-275/99-301 & 50-323/99-301 for Tests Administered on 990125-28 ML20205B2301999-03-25025 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990125-28 ML20207M3401999-03-0202 March 1999 Notification of Canceled Meeting Scheduled for 990309 Re 7200026 & 7200027 for PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon ML20155H9051998-11-0303 November 1998 Notification of 981117 Meeting for Dockets 7200026 & 7200027 with Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage ML20248K4451998-06-0202 June 1998 Notification of 980617 Meeting W/Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage.Meeting Agenda Encl ML20247G9081998-04-0707 April 1998 Discusses Experts Needed for Plant Life Extension Cases,Per 980403 Discussion ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20134P2231997-02-20020 February 1997 Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122 NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20134B5061994-04-13013 April 1994 Submits Plants Which Will Be Discussed in Categories Indicated Re Results of Screening Meetings for June 1994. Partially Deleted ML20057A9941993-09-14014 September 1993 Forwards NRC Proposed Transcript Corrections ML20056E5141993-08-12012 August 1993 Submits SALP Schedule for FY94 Per Mgt Directive 8.6 ML20127P4161993-01-19019 January 1993 Provides Summary of 930113 Operators Reactors Events Briefing.List of Attendees & Viewgraphs of Elements Discussed Encl ML20126F0201992-12-16016 December 1992 Discusses Discrepancies in Svcs Rendered for 3rd & 4th Quarters of 1991 & 1st,2nd & 3rd Quarters of 1992.TLD Program for Humbolt Bay Site Did Not Strictly Follow Ltr of Contract ML20127D4321992-09-0101 September 1992 Forwards 920818 Petition Submitted by N Culver on Behalf of San Luis Obispo Mothers for Peace,Filed in Response to NRC Notice of Issuance of Amend to Licenses for Plant,Extending Expiration Date from 080423 to 210922 ML20058P5021990-08-15015 August 1990 Forwards Three Analyses of Shutdown Events Evaluated by Accident Sequence Precursor Program ML20247M1881989-05-26026 May 1989 Notification of 890613,14 & 15 Meetings W/Util in San Francisco,Ca to Discuss PRA Topics Re NRC Questions on long-term Seismic Program NUREG-1353, Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-13531989-05-0202 May 1989 Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-1353 NUREG/CR-5176, Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants1989-02-14014 February 1989 Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants ML20154E5121988-05-0909 May 1988 Requests That Zip Code for Judge Es Bowers Address Be Changed as Stated,Per Iw Smith Request.Related Correspondence ML20153E3031988-05-0303 May 1988 Forwards NRR Input to Status of Regulatory Activities at Plants,In Response to J Curtis Request for Info ML20153E3381988-04-21021 April 1988 Requests Input on Status of Regulatory Activities for Listed Plants,Status of EPRI Research for RES & Status of California Low Level Waste Program.Response Requested by 880505 ML20151D4271988-03-24024 March 1988 Submits Summary of Actions Discussed at ACRS 335th Meeting on 880310-12 in Washington,Dc,Including ACRS Repts/ Recommendations,Other Actions,Agreements,Assignments & Requests & Future Agenda ML20148G2281988-03-22022 March 1988 Advises That Time for Commission to Review Naslap Decision (ALAB-880) Expired.Commission Declined Review.Decision Became Final Agency Action on 880318.Served on 880323 ML20148D9491988-03-15015 March 1988 Discusses 880315 Operating Reactors Events Meeting 88-11. List of Attendees,Events Discussed & Tabulation of long-term Followup Assignments Detailed in Encls ML20236Y1501987-12-0707 December 1987 Staff Requirements Memo Re 871125 Affirmation/Discussion & Vote.Commission Approved Order Directing Aslab to Issue Decision by 880131 Re Installation of high-density Spent Fuel Racks & Order Vacating Stay for Low Power Operations ML20236R7551987-11-20020 November 1987 Informs That Time Provided by NRC Regulations within Which Commission May Act to Review ALAB-877 Expired.Commission Declined Review.Decision Became Final Agency Action on 871117.Served on 871120 ML20236N8421987-11-12012 November 1987 Documents Reconstitution of Aslab for OL Amend Proceeding to Consist of as Rosenthal,Cn Kohl & Ha Wilber.Related Correspondence ML20236H2821987-10-30030 October 1987 Informs That Time Provided within Which Commission May Act to Review ALAB-873 Expired.Commission Declined Review. Decision Became Final Agency Action on 871028.Served on 871102 ML20235H6291987-09-25025 September 1987 Informs of Reconstitution of Aslab Consisting of Author as Chairman & TS Moore & Ha Wilber as Members ML20234F3831987-09-14014 September 1987 Documents Results of Exam of Bolted Connections of Raceway Supports at Plant.Exam Conducted Due to Allegations Received Re Adequacy of Anchor Bolts Securing Raceway Supports to Concrete ML20238A6481987-08-17017 August 1987 Forwards Page 7 of 870813 Pleading Entitled, Response of NRC Staff to Licensing Board Order of 870732 (Directing Parties to File Comments on Applicability of Appeal Boards Decision...), Which Was Inadvertently Omitted ML20195F8261987-08-0707 August 1987 Forwards Listed Data Tables for Use in Preparing Performance Analyses for Plant,Per DF Kirsch 870728 Memo.Salp Performance Analyses Should Be Submitted to J Burdoin by 870825 ML20235M1861987-07-13013 July 1987 Forwards Complete Footnote 5 as Appearing on Pages 8 & 9 of 870710 Answer to Sierra Club Motion to Admit Contention Re Generic Issue 82 & to Direct Preparation of Eis. Due to Quirk in Programming,Not All of Footnote 5 Printed ML20235G5441987-07-0808 July 1987 Forwards NRC Staff Proposed Findings of Fact & Conclusions of Law in Form of Initial Decision Re Licensee Amend Request to Expand Spent Fuel Pools at Plant ML20234F5101987-07-0606 July 1987 Informs of Large Number of Limited Appearance Statements Filed in Proceeding.Documents Will Not Be Served,Per Board Chairman Discussions.Documents Will Be Made Part of Official Record & Will Be Available for Insp.Served on 870706 ML20216D0931987-06-22022 June 1987 Forwards Transcript Pages 65-68 of J Mcdermott Limited Appearance Statement on 870615 Re Defective Weld at Plant Approved by QC Inspector for Appropriate Action.Served on 870624 ML20214W5681987-06-0505 June 1987 Forwards List of Exhibits Intended to Be Offered by Sierra Club in Upcoming Hearing in Proceeding Re Spent Fuel Pool. List Received Too Late for Inclusion in to ASLB ML20214T2031987-06-0505 June 1987 Forwards NRC Staff Disk in Ascii Form,Containing Staff Testimony & Draft Proposed Findings of Fact & Conclusions of Law,Per ASLB 870522 Memorandum & Order.Requests Database Compiled by ASLB Be Provided on Encl Blank Disks ML20214T1581987-06-0404 June 1987 Forwards NRC Staff Testimony of Hg Ashar,Hm Fishman,G Degrassi,Wl Brooks & a Singn on Sierra Club Contentions I(A)3 & 4;I(B)2,8 & 9;II(A)1-9 & II(B)1-9 & Dp Cleary on Sierra Club Contention I(B)7,per ASLB 870128 & 0409 Orders ML20214T2251987-06-0303 June 1987 Confirms 870602 Telcon Informing ASLB of Staff Intention to Offer Listed Documents as Staff Exhibits in Upcoming Hearing on Spent Fuel Pool ML20195G2301987-06-0202 June 1987 Discusses Plans for Response to Lessons Learned from Plant 870410 Loss of RHR Event.Crgr Review of 50.54(f) Ltr Providing Addl Info Requested at Earliest Opportunity ML20149M6491987-05-29029 May 1987 Forwards Proposed 10CFR50.54(f) Ltr Currently Being Reviewed for Transmittal to CRGR on 870602.Comments,if Necessary, Requested by 870601 ML20214L5831987-05-21021 May 1987 Summarizes 870519 Operating Reactors Events Meeting 87-15 to Brief Senior Managers from Nrr,Res,Aeod & Regional Ofcs on Events Which Occurred Since 870512 Meeting.Events Discussed & Significant Elements of Events Encl ML20245B1911987-05-18018 May 1987 Presents Composite Set of NRC & Industry Recommended Remedial Actions Based on 1985 AEOD Case Study Rept C503 Re DHR Problems for PWR Operation.Table 1 Presenting Chronology of 37 events,cost-benefit Analysis & Related Info Encl IA-87-714, Presents Composite Set of NRC & Industry Recommended Remedial Actions Based on 1985 AEOD Case Study Rept C503 Re DHR Problems for PWR Operation.Table 1 Presenting Chronology of 37 events,cost-benefit Analysis & Related Info Encl1987-05-18018 May 1987 Presents Composite Set of NRC & Industry Recommended Remedial Actions Based on 1985 AEOD Case Study Rept C503 Re DHR Problems for PWR Operation.Table 1 Presenting Chronology of 37 events,cost-benefit Analysis & Related Info Encl 1999-08-27
[Table view] |
Text
v .
/ o, UNITED STATES
)[' f NUCLEAR REGULATORY COMMISSION C *('fL
-g .p WASHING TON, D. C. 20555 '
N ,/ / '
FEB 2 71984
....+
MEMORANDUM FOR: Walter R. Butler, Chief Containment Systems Branch Division of Systems Integration Brian Sheron, Chief Reactor Systems Branch Division of Systems Integration FROM: Victor Benaroya, Chief Chemical Engineering Branch Division of Engineering
SUBJECT:
ESTIMATE OF GAS AND SOLID DEBRIS FORMATION FROM ZINC, ALUMINUM, AND ORGANIC MATERIALS INSIDE CONTAINMENT UNDER DBA CONDITIONS FOR DIABLO CANYON, UNITS 1 AND 2 -
We have evaluated the Diablo Canyon Allegation 100, Diablo Canyon Painters Have No Quality Control Program, from the hydrogen generation and debris formation point of view.
We consider that inside containment, unqualified paints which do not meet the provisions of Regulatory Guide 1.54, Quality Assurance Requirements for Protective Coatings Applied to Water-Cooled Nuclear Power Plants (June 1973), and ANSI N 101.2, Protective Coatings (Paints) for Light Water Nuclear Reactor Containment Facilities (1972), can be a source of hydrogen generation and debris formation. This is a conservative assumption because all unqualified paints would not be affected.
In Table I, we listed the amount of hydrogen expected to be generated from the corrosion of zinc paints, galvanized steel, and aluminum. Table II lists the calculated volume of debris that could be formed.
In our evaluation, the calculation of combustible gas generation rates is consistent with the guidelines of NUREG-0588, with adjustments, to take into account the plant-specific parameters and the effects of post-accident recirculation of sump water inside the containment. We assumed that the cable insulation materials and unqualified paints (paints that do not meet the acceptance criteria of SRP Section 6.1.2) contribute to combustible gas generation,-whereas qualified organic paints (paints that meet the acceptance criteria of SRP .Section 6.1.2) and other organic materials (charcoal and oil) contribute negligible amounts of combustible gases.
For solid debris formation, we assumed that only unqualified paints form debris under DBA conditions, whereas the qualified paints, charcoal, oil, and cable insulation materials are not expected to form solid debris that can potentially reach the sumps under DBA conditions. With regards to the rate of formation and size distribution of the debris, we are unable to provide quantitative information due to uncertainty in the chemical composition and in the quality control of the application of the unqualified paints.
I.
WG) dab
, DIA
s FEB 2 71984 Discussions with Carboline, one of the principal suppliers of containment protective coatings, indicated that debris from a failed unqualified coating is likely to be small in particle size. Inorganic and organic zinc coatings are predominately zinc particles and any debris released would be in the form of a white powder. Organic coatings will fail by blistering forming a flaky debris. The particle size of these flakes may range from one millimeter to 6 millimeters, and rarely up to 12 millimeters. The possibility of peeling or delamination of large sheets of protective coating is unlikely. Application of a protective coating on an oily surface could lead to delamination or peeling.
The amount of debris which can be generated from unqualified paint may total 6400 pounds with a volume of 34 cubic feet. Paint which has been qualified for suitability under design basis accident conditions (meets ANSI 101.2) is not expected to blister. Approximately 330,000 square feet of partially qualified paint has been applied inside containment without Regulatory Guide 1.54 quality control requirements. This paint may to some extent delaminate and separate from the containment surface.
The licensee provided information on the amount of qualified and unqualified protective coatings, but no information was provided on the amount of cable insulation. We used the estimated generation rates of hydrogen for the Grand Gulf plant, since Grand Gulf possesses the largest quantity of organic material that can produce gases under DBA conditions.
(
Victor Be Chemical Engineerirg Branch .
Division of Engineering
Enclosures:
As stated
Contact:
F. Witt x28360 cc: R. Vollmer W. Johnston L. Rubenstein J. Shapaker C. *1cCracken T 48TerJ1pgl8 G. Knighton A. Serkiz J. Pulsipher F. Witt E. Sullivan S. Pawlicki .
5
. Table I --
Estimated Combustible Gas Generation Rates Inside Containment Time ft.3(STP)/ min. Hydrogen Generation Radiolysis Corrosion Cable Unqualified Zinc Galvanized Aluminum Total Insulation Paints Paints Steel 1 hr 12.82 1.27 3.73 2.75 1.24 19.06 12 hr 2.65 0.56 0.62 0.46 0.21 4.50 1 day 1.52 0.40 0.37 0.27 0.13 2.69 4 day 0.58 0.20 0.23 0.16 0.08 1.25 10 day 0.32 0.13 0.23 0.16 0.08 0.92 30 day 0.10 0.07 0.23 0.16 0.08 0.64 Assumptions: (1) Source term of NUREG-0588 adjusted for plant-specific parameters and effects of post-accident recirculation of sump water.
(2) Cable insulation materials and unqualified paints received 100% airborne and plate-out gamma and 50% airborne and plate'out beta radiation.
(3) G value for cable insulation materials = 3.1 molecules /
100 e.v. absorbed. G value for unqualified paints
= 5.0 molecules /100 e.v. absorbed.
(4) All gases generated are combustible.
4
' 4
, . .... Table II -
Debris Formation from Unqualified Paint 9 film thickness 1-6 mils E
debris density 1.2 - 2.1 gms/cc debris volume 34 cu. ft. Protective coatings which do not meet ANSI 101.2, Protective Coatings (Paints) for Light Water Nuclear Reactor Containment-Facilities and Reg. Guide 1.54. Quality Assurance Requirements for Protective Coatings Applied to Water - Cooled Nuclear Power Plants.
Assumptions: (1) Source term of NUREG-0588 adjusted for plant-specific parameters and effects of post-accident recirculation of sump water.
(2) Ratio of debris volume to original volume of unqualified paints = 2. i (3) :olid debris formation completed.when 90% of radiation
. energy is released.
5 .
i
\
4 t
b
.b ;
I
% W
+
, -- - - , - - - - - . - - - - . - , - , - , . - . . - - . - . - - - - -. , - , . - a , - - - - , . -