Forwards Rev 29 to Physical Security Plan,Per 10CFR50.54(p). Rev Withheld,Per 10CFR73.21
ML20209H247
Person / Time
Site: Callaway Ameren icon.png
Issue date: 07/07/1999
From: Randolph G
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-4062, NUDOCS 9907200174
Download: ML20209H247 (2)


Text

,_ _ _ _ - _ _

l ,

  • Union Electric PO Box 620

,CallawayPlant Fulton, MO 65251

$73.676.6NS GarryL Randolph 5736764056 fax Vice President and Chief Nuclear Offwer P 867 526 061 July 7,1999 ULNRC-4062 U. S. Nuclear Regulatory Commissia Attn: Document Control Dedc Mail Stop PI-137 Washington, DC 20555-0001 Gentlemen:

, DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT I k UNION ELECTRIC CO.

FACILITY OPERATING LICENSE NPF-30 PHYSICALEECURITY PLAN, REVISION 29 Pursuant to the requirements of 10 CFR 50.54(p), the Union Electric Company furnishes four copies of Revision 29 of the Callaway Plant Physical Security Plan.

Distribution of these documents is outlined on the attachment.

Revision 29, increases the minimum of armed response personnel to those levels demonstrated during the August 1998 OSRE, and in accordance with wording agreed to in ULNRC letter 3984. This revision also incorporates the changes required due to the new '

security computer system becoming operational. This revision also rescinds Revision 28A, which was a temporary addendum to the Security Plan, which covered security operations during the computer change over period. Lastly, this revision reflects a change in the Training and Qualification Plan in which required tasks and elements were consolidated into like categories. This reduced the overall size of the T&Q Plan while retaining all the task and element material and requirements.

Changes incorporated into this revision are consistent with 10CFR50.54 (p) and do not decrease the effectiveness of the security plan.

If you have any questions regarding these documents, please contact M. R. Faulkner at (573) 676-8833.

Very truly yours, y

Garry L. Randolph GLR /ssm Enclosure

{

(1 original and 3 copies) -

Y The enclosed document contains k i 200028 sorego rds inrrrm tion.itnin tae scope of 10 CFR '13.21. Removal of enclosures declassifies this dricument.

I 9907200174 990707 t

c;

' i

. I

. - . \

l l ULNRC-4062  !

,- . .luly 7,1999 Page 2 l cc: U. S. Nuclear ReguStory Commission (Original and 3 copies)

Attn: Document Control Desk Mail Stop PI-137 Washington, DC 20555-0001 l

Mr. Ellis W. Merschoff w/ attachment (2 copies) 1 Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 w/o attachment Senior Resident inspector Callaway Resident Office U.S. Nuclear Regulatory Commission  ;

8201 NRC Road 1 Steedman,MO 65077 Mr. Melvin K. Gray w/o attachment (2 copies)  ;

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 13E16 Washington, DC 20555-2"/38 w/o attachment  !

Manager, Electric Department Missouri Public Service Commission i PO Box 360 Jefferson City, MO 65102 Superintendent, Licensing Wolf Creek Nuclear Operating Corporation PO Box 411 Burlington,KS 66839