ML20215A588

From kanterella
Revision as of 01:09, 6 August 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards 10CFR50.55(e) & Part 21 Telephone Rept Re Tdi Standby Diesel Generator.Followup on Generic Aspects of Problem Requested
ML20215A588
Person / Time
Site: Grand Gulf, 05000000
Issue date: 11/12/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20215A161 List:
References
FOIA-86-656, REF-PT21-81 NUDOCS 8612110328
Download: ML20215A588 (2)


Text

- o,

[y' ,a c ace ,,,,

%*, UNITED STATES

!" n NUCLEAR REGULATORY COMMISSION

  • N

$ RE0lON11 of 101 MARIETTA ST., N.W. SUITE 3100 fg * *w .* ,e"[ ATLANTA, GEORGIA 30303 November' 12, 1981-

/

~1/ MEMORANDUM FOR: Chief, Vendor Inspection Branch, Region IV FROM: R. C. Lewis, Director, Division of . Resident and Reactor Project Inspection

SUBJECT:

CONSTRUCTION DEFICIENCY PEPORT - CONFIRMATION OF TELECON (AITS NO. F02700167 )

Attached is a 10'CFR'50.55(e)/10 CFR 21 report received from Mississippi Power and Licht Company - . This appears to be a generic prob'nm. Would you please followup on the generic aspects of the problem with the AE/ Vendor?

Should you have additional questions, we will be glad to discuss them with you.

E.c R. C. ewis cc: ' Principal Staff, RII-Acting Director, RPI, RI Director, RPI, RIII Acting Director, RRP&VI, RIV Director, RRP&E, RV Wayne Reinmuth, IE i

i l

l L

l l

l CONTACT: P. A. Taylor

, (242-5587 ) N l N_

~

l 8612110328 861209 PDR FOIA ELLIS86-656 PDR f

f///

.o J

~

k!51DElli AND kl AL10R PROJECT'INSPECTI0ft -

DAILY REPORT.. REG 10f4.Il_. .-w t ,

4 DATE 11/12/81-E . FACILITY HOTIFICATI0tt ITEM OR EVENT t REGIONAL' ACTION-Grand Gulf I r, 2 Licensee 11/10 a e t e _ Transamericay Delaval Standby _ Diesel Generator.

_ Followup per DNS:50-416 '

An inspection of. the diesel's no. 2 cylinder following 50-417 MC 25)(/).

operational testing showed that one steld and three Region -IV ' noti fid washers were cracked. The-stud-three-washers-werr cW. The stud and washers are used to secure the piston head to the piston skirt and were purchased by Delaval from WestETool and Supply Company, Oakland, Calif.

Part 21 is applicable.

GENERAL: RRPIkectionan resident inspectors are attending the ACRS meeting pertaining to _an opera, ting license for St. Lucie 2.

1 i

e t

e