ML20134C912

From kanterella
Jump to navigation Jump to search
Notification of 961114 Meeting W/Util in Rockville,Md to Discuss Results of Self Assessment of Accuracy of Info in FSAR for Each Plant Site
ML20134C912
Person / Time
Site: Grand Gulf, Arkansas Nuclear, River Bend, Waterford  Entergy icon.png
Issue date: 10/08/1996
From: Donohew J
NRC (Affiliation Not Assigned)
To: Beckner W
NRC (Affiliation Not Assigned)
References
NUDOCS 9610110056
Download: ML20134C912 (7)


Text

---.

8

~

MEMORANDUM FOR:

Willian D. B:ckner, Project Director October 8, 1996 Project Directorate IV-1 Division of Reactor Projects III/IV 4

i Office of Nuclear Reactor Regulation FROM:

Jack N. Donohew, Project Manager ORIGINAL SIGNED BY:

Project Directorate IV-1 Division of Reactor Project III/IV Office of Nuclear Reactor Regulation

SUBJECT:

PRESENTATION OF THE ACCURACY REVIEW CONDUCTED BY ENTERGY OPERATIONS, INC. ON THE FINAL SAFETY ANALYSIS REPORTS FOR ARKANSAS NUCLEAR ONE, GRAND GULF NUCLEAR STATION, RIVER BEND STATION, AND WATERFORD STATION UNIT 3 DATE & TIME:

Thursday, November 14, 1996 1:00 to 3:00 pm a

LOCATION:

Two White Flint North 11555 Rockville Pike Rockville, Maryland l

Room T-6Al PURPOSE:

Entergy Operations, Inc. (E0I) will discuss the results of its self assessment of the accuracy of the information in the Final Safety Analysis Report (FSAR) for each of its four nuclear plant sites. The method used by E01 to review the FSARs is the same method proposed by NEI for a licensee's self assessment.

  • PARTICIPANTS:

NRC Utility F. Miraglia J. Yelverton A. Thadani M. Meisner, et. al.

R. Zimmerman J. Donohew, et. al.

Docket Nos.

50-313, 50-368, 50-382, 50-416, and 50-458 cc:

See next page CONTACT: Jack Donohew 301-415-1307

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on

)

Staff Meetings Open to the Public" 59 Federal Reaister 48340, 9/20/94.

\\

Document Name: AR961114961114MTG DISTRIBUTION:

See next page

'D 0FC PM:PD4rl h

JDonohtM 100082 NAME MC FE CMB W PY N0 OFFICIAL RECORD COPY 9610110056 961008 PDR ADOCK 05000313 P

PDR i

p*nouq j

ee t

UNITED STATES g

,g NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20666 4001

/

October 8, 1996 MEMORANDUM FOR:

William D. Beckner, Project Director Project Directorate IV-1 i

Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation

\\

FROM:

Jack N. Donohew, Project Manager l}I L

Project Directorate IV-1 Division of Reactor Projects III/I Office of Nuclear Reactor Regulation i

SUBJECT:

PRESENTATION OF THE ACCURACY REVIEW CONDUCTED BY ENTERGY OPERATIONS, INC. ON THE FINAL SAFETY ANALYSIS REPORTS FOR ARKANSAS NUCLEAR ONE, GRAND GULF NUCLEAR STATION, RIVER BEND STATION, AND WATERFORD STATION i

UNIT 3 DATE & TIME:

Thursday, November 14, 1996 1:00 am to 3:00 pm LOCATION:

Two White Flint North I

11555 Rockville Pike Rockville, Maryland Room T-6Al PURPOSE:

Entergy Operations, Inc. (E01) will discuss the results of its self assessment of the accuracy of the information in the Final Safety Analysis Report (FSAR) for each of its four nuclear plant sites. The method used by E01 to review the FSARs is the same method proposed by NEI for a licensee's self assessment.

  • PARTICIPANTS:

HRL Utility F. Miraglia J. Yelverton A. Thadani M. Meisner, et. al.

R. Zimmerman J. Donohew, et. al.

Docket Nos.

50-313, 50-368, 50-382, 50-416, and 50-458 ct.

See next page CONTACT: Jack Donohew 301-415-1307

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Reaister 48340, 9/20/94.

. __., = _ _

l Entergy Operations, Inc.

Arkansas Nuclear One, Units 1 & 2 CC:

Executive Vice President Vice President, Operations Support

& Chief Operating Officer Entergy Operations, Inc.

Entergy Operations, Inc.

P. O. Box 31995 P. O. Box 31995 Jackson, MS 39286-1995 Jackson, MS 39286-1995 Director, Division of Radiation Wise, Carter, Child & Caraway q

Control and Emergency Management P. O. Box 651 Arkansas Department of Health Jackson, MS 39205 4815 West Markham Street, Slot 30 Little Rock, AR 72205-3867 Vice President Operations, ANO 1448 S. R. 333 Winston & Strawn Russellville, AR 72801 1400 L Street, N.W.

Washington, DC 20005-3502 Manager, Rockville Nuclear Licensing Framatone Technologies 1700 Rockville Pike, Suite 525 Rockville, MD 20852 Senior Resident Inspector i

U.S. Nuclear Regulatory Commission P. O. Box 310 l

London, AR 72847 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 l

Arlington, TX 76011-8064 County Judge of Pope County Pope County Courthouse l

Russellville, AR 72801 i

r 1

Entergy Operations, Ir.c.

Grand Gulf Nuclear Station cc:

Executive Vice President General Manager, GGNS

& Chief Operating Officer Entergy Operations, Inc.

Entergy Operations, Inc.

P. O. Box 756 P. O. Box 31995 Port Gibson, MS 39150 Jackson, MS 39286-1995 Attorney General Wise, Carter, Child & Caraway Department of Justice P. O. Box 651 State of Louisiana Jackson, MS 39205 P. O. Box 94005 Baton Rouge, LA 70804-9005 Winston & Strawn 1400 L Street, N.W. - 12th Floor State Health Officer Washington, DC 20005-3502 State Board of Health P. O. Box 1700 Director Jackson, MS 39205 Division of Solid Waste Management Mississippi Department of Natural Office of the Governor Resources State of Mississippi P. O. Box 10385 Jackson, MS 39201 Jackson, MS 39209 Attorney General President, Asst. Attorney General Claiborne County Board of Supervisors State of Mississippi Port Gibson, MS 39150 P. O. Box 22947 Jackson, MS 39225 Regional Administrator, R,

a IV U.S. Nuclear Regulatory 0 -scssion Vice President, Operations Support 611 Ryan Plaza Drive, Suite 1000 Entergy Operations, Inc.

Arlington, TX 76011 P.O. Box 31995 Jackson, MS 39286-1995 Senior Resident Inspector U. S. Nuclear Regulatory Commission Director, Nuclear Safety Route 2, Box 399 and Regulatory Affairs Port Gibson, MS 39150 Entergy Operations, Inc.

P.O. Box 756 Nuclear Operating Plant Services Port Gibson, MS 39150 Bechtel Power Corporation 9801 Washington Boulevard Gaithersburg, MD 20878 Vice President, Operations GGNS Entergy Operations, Inc.

P. O. Box 756 Port Gibson, MS 39150

Entergy Operations, Inc.

River Bend Station cc:

I Winston & Strawn Executive Vice President and 1400 L Street, N.W.

Chief Operating Officer Washington, DC 20005-3502 Entergy Operations, Inc.

P. O. Box 31995 Manager - Licensing Jackson, MS 39286 Entergy Operations, Inc.

River Bend Station General Manager - Plant Operations P. O. Box 220 Entergy Operations, Inc.

St. Francisville, LA 70775 River Bend Station P. O. Box 220 Director St. Francisville, '.A 70775 Joint Operations Cajun 10719 Airline Highway Director - Nuclear Safety P. O. Box 15540 Entergy Operations, Inc.

Baton Rouge, LA 70895 River Bend Station P. 0. Box 220 Senior Resident Inspector St. Francisville, LA 70775 P. O. Box 1050 St. Francisville, LA 70775 Vice President - Operations Support Entergy Operations, Inc.

President of West Feliciana P. O. Box 31995 Police Jury Jackson, MS 39286-1995 P. O. Box 1921 St. Francisville, LA 70775 Attorney General State of Louisiana Regional Administrator, Region IV P. O. Box 94095 U.S. Nuclear Regulatory Commission Baton Rouge, LA 70804-9095 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 Wise, Carter, Child & Caraway P. O. Box 651 Ms. H. Anne P1ettinger Jackson, MS 39205 3456 Villa Rose Drive Baton Rouge, LA 70806 Vice President & Controller Cajun Electric Power Cooperative Administrator 10719 Airline Highway Louisiana Radiation Protection Division P.O. Box 15540 P. O. Box 82135 Baton Rouge, LA 70895 Baton Rouge, LA 70884-2135 Vice President - Operations Entergy Operations, Inc.

River Bend Station P.O. Box 220 St. Francisville, LA 70775 l

Entergy Operations, Inc.

Waterford 3 cc:

Administrator Regional Administrator, Region IV Louisiana Radiation Protection Division U.S. Nuclear Regulatory Commission Post Office Box 82135 611 Ryan Plaza Drive, Suite 1000 Baton Rouge, LA 70884-2135 Arlington, TX 76011 Vice President, Operations Resident Inspector /Waterford NPS Support Post Office Box 822 Entergy Operations, Inc.

Killona, LA 70066 P. O. Box 31995 Jackson, MS 39286 Parish President Council St. Charles Parish Director P. O. Box 302 Nuclear Safety Hahnville, LA 70057 Entergy Operations, Inc.

P. O. Box B Executive Vice-President Killona, LA 70066 and Chief Operating Officer Entergy Operations, Inc.

Wise, Carter, Child & Caraway P. O. Box 31995 l

P. O. Box 651 Jackson, MS 39286-1995 Jackson, MS 39205 Chairman General Manager Plant Operations Louisiana Public Service Ccamission Entergy Operations, Inc.

One American Place, Suite 1630 P. O. Box B Baton Rouge, LA 70825-1697 Killona, LA 70066 Vice President Operations 1

Licensing Manager Entergy Operations, Inc.

Entergy Operations, Inc.

P. O. Box B P. O. Box B Killona, LA 70066 Killona, LA 70066 Winston & Strawn 1400 L Street, N.W.

Washington, DC 20005-3502

i DISTRIBUTION Meetina Notice November 14. 1996:

Hard Cooy (Docket File PUBLIC PD4-1 r/f OGC (0-15818)

ACRS JDonohew Receptionist, TWFN E-Mail R. Zimmerman (RPZ)

J. Roe (JWR)

E. Adensam (EGAl)

W. Beckner (WDB)

P. Tressler (PJN)

E. Jordan (e-mail to JKR)

OPA F. Miraglia (FJM)

A. Thadani (ACT)

S. Varga (SAV)

G. Holahan (GMH)

)

B. Sheron (BWS)

B. Boger (BAB2)

R. Jones (RCJ)

T. Collins (TEC)

C. Berlinger (CHB)

L. B. Marsh (LBM)

J. Wermeil (JSWl)

G. Bagchi (GXB1)

J. Calvo (JAC7)

J. Strosnider (JRS2)

R. Wessman (RHW)

C. Patel (CPP)

D. Wiggington (DLW)

T. Alexion (TWA)

J. Mitchell, (JAM)

B. Henderson (BWH)

J. Dyer, RIV (JE02)

- -.