ML20215A354

From kanterella
Jump to navigation Jump to search
Forwards 10CFR50.55(e) & Part 21 Telephone Rept Re Adequacy of Racks.Followup on Generic Aspects of Problem Requested
ML20215A354
Person / Time
Site: Catawba, 05000000
Issue date: 08/06/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20215A161 List:
References
FOIA-86-656, REF-PT21-80 NUDOCS 8612110257
Download: ML20215A354 (3)


Text

7 %,

. f. een.

)

e UNITED 5TATES fj,N 7'

~

NUCLEAR REGULATORY COMMISSION

.I REClON!!

's 101 MAnit1 T A ST., NM. !UITC 3100 ATLANrA.GtOHCIA 30303 August 6, 1980 MEMORANDUH FOR: Chief, Vendor Inspection Branch, Region IV FROM:

Charles E. Hurphy, Chief, Reactor Construction and Engineering Support Branch, Regfon 1I SUBJ ECT:

CONSTRtT.11oN DEFICIENCY REPORT - CO::FIPJ1A110N OF TELECON (AITS NO.F02500198

)

Attached 13 a 10 CFI 50.5S M /10 crit 21 report retelved from Duke Power Company This appears to be a generic probler.

'n'nuld you please follovup on the :;eneric aspects of the proble:r.

with the AE/ Vendor. Should you have additional c;uestices, v.

will be glad to discuss them with you.

]

CharIcs E. Mt ' thy, Chi (f l

Re:ictor Construction und Enginterfur Support Branch cc:

Principal Staff. RIl RC&ES Branch Chief s, R1, III, IV, V G., Wayne Reinmuth, IE CONTACT:

J. K. Rausch (242-5575 )

8612110257 861209 PDR FOIA ELLIS86-656 PDR fM

..... + - -

su-m 1.

g

~

~ f g'.r4 3,,;

~.9 Ainuat i., 1?MO.-

.,4.;j.-

c.; :

7:,

.,,e

t...,,

s.

3, Cm av;.. ! :. 2 T el...mn

. CW: _1 !'f e ae 1 P.it tt',ry ka**!:n }irt seismien11y Oualified,jtevel' fe ll.ntupj Pe '.;

IM 's: 50-41J F/ 5/M

,1.

'the s 6jer-t def ici. r:cy wat: f und. by t.he Ilcensee f te r.

'K: ~ '.12, Rer,ie.n l 2'

  • !>-: g *.

,an *. C. !r met t ir prc=pt.?rl 'an. 8nvestigation by egueationing; IV:E.rffled; the ad.osaef - o f 'the r.tci.s. :. ~4 ho, t.ty.ks.1 o rn isjaedj Vel a*.*a l '.

w:re :: un.r.ictured !.: 'the :;t fl C.r.pany.

The 'liccusee vill rer/1;ve t her racks.

!!o other Nka.'#iants are affected.

ii.- 2.' Jec, ut.h r u'. U i t ies sly be siI f ected.

Report due

.%ga;+cr'*, l',20.

Y',

y, @' M; s,,

a

.O.

1 s,.

i%,..-

t n

TELEPHONF. REPORT I'ACILITY-Catawba.1 & 2 DOCK!;T NO. 50-413, 414 N'I6'*

IATE 8/5/80 TIME Lic. Occ. No.

1 CDR - Diesel Battery Racks Not Seismically Qualified, i.evel I.-

.J g,; p,c7 : -

r

'iESCRIPit0N of OCCI.?RRENCC: The subject ~ deficiency was_

nd by the 11,censee af,ter

,an NRC insgector, prompted an _ investigation by questioning the _ adequacy of the,,,,,

racks.

The racks furnished by Velaval were manufactured by the Nifi Company.

P The licensee will replace the racks. No other Duke. Plants are affected. However, other utilities may be affected. Report due Septeraber 4,1980.

. - =

o J. K. Rau'sch STCNATURE

_ __