Recommends Scheduling Insp of Tdi Oakland,Ca Facility Based on Welding Deficiencies of Diesel Generator Piping Identified by Util & Noted During 800429-0502 Insp of Plant
ML20215A292
Person / Time
Site: 05000000, Washington Public Power Supply System
Issue date: 07/15/1980
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Reinmuth G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20215A161 List:
References
FOIA-86-656 NUDOCS 8612110237
Download: ML20215A292 (2)


Text

- -

F

~ ' .

h*;; gc[.N'h ./* UNITED STATES . -

7 7 ' ." c ' NUCLEAR REGULATORY COMMISSION i3 's REGION V -

'.* 2-1990 N. CALIFORNIA BOULEVARD ,

o ~

, . SulTE 202, WALNUT CREEK PLAZA o,,,, . WALNUT CREEK, CALIFORNIA 94596 JUL 151980

' Docket Nos.{50-460 50-513 ualcT MEMORANDUM FOR':' G. W. Reinmuth, Assistant Director, Division of Reactor Construction Inspection, IE:HQ NorASC-FROM: G. S. Spencer, Chief, Reactor Construction and Engineering Support Branch, IE:RV-

SUBJECT:

IMPROPER WELDING BY TRANSAMERICA DELAVAL INCORPORATED ON ASME PIPING SUPPLIED TO ,

WPPSS: WNP-1/4 (AITS N0. F05030010) (

During an inspectio' n conducted at the WNP-1/4. facility during the period of April 29-May 2,1980 the inspector noted that the licensee had identified a number of welding deficiencies with the diesel generator piping early in 1979 and had shipped most of the piping back to the manufacturer. (Delaval) .for repair. This piping is now onsite and the

, contractor is' reinstalling it. These welding deficiencies included:

arc strikes, undercut, lack of penetration, and undersize socket welds.

The apparent equipment deficiency was'not reported by the licensee and i

subsequently the generic implications were never evaluated by the NRC.

The piping subassemblies were fabricated by the Delaval facilities located in Oakland, California. A review of the piping record packages indicated that both the fabricator's representative and the Authorized i

Inspector had signed the Code Data Reports as confonning to ASME require-ments.

3 Discussions of the findings were held with Mr. Potapovs on uly 9, 1980 by telephone. Mr. Potapovs indicated that an AITS completion aate or October 9, 1980 was acceptable.

l

~

8612110237 861209 l PDR FOIA ELLISS6-656 PDR l

~

f/5

p m.,.

p. ,.

y: .,: :, . .,_

-g G.-W. Reinmuth' - ' It-is recommended that VIB schedule and perfonn at leastone inspection

.at the Transamerica Delaval 0akland,' California facility.

W G..S. )encer,- Chief Reactor Construction and:

Engineering Support Branch cc: RC&ES Branch Chiefs