ML20215A502

From kanterella
Jump to navigation Jump to search
Forwards 10CFR50.55(e) & Part 21 Telephone Rept Re Diesel Generator Turbocharger Thrust Bearings Defect.Followup on Generic Aspects of Problem Requested
ML20215A502
Person / Time
Site: Bellefonte, 05000000
Issue date: 01/28/1981
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20215A161 List:
References
FOIA-86-656, REF-PT21-81 NUDOCS 8612110305
Download: ML20215A502 (3)


Text

I 3

L j

j ' ' ' h's y,z

[ ,.,. -

-(

' NUCLE AR REGUL ATORY COMMISSION RE GION il D,

g 101 M Af 0f f i A 71 N W, SOf f t'3100 U

4 o

AT L ANT A. GEO9 CIA 30303 January 28, 1981 MEMORANDUti FOR:

Chief, Vendor Insoection Branch,-Reaion IV FROM:

Charles E. Plurphy, Chief, Reactor Construction and-Engineering Support Branch, Region II

SUBJECT:

CONSTRUCTION DEFICIENCY REPORT - CONFIRMATION OF TELECON

-(AITS N0. F02500314) 4 Attached is a 10 CFR 50.55(e)/10 CFR 21 report received from Tennessee Valley Authority This appears to be a generic oroblem. Would you please fcllowup on the generic aspects of the problem with the AE/ Vendor.

Should you have additional questions, we will be glad to discuss them with you.

,./ /

. s j --

Charles E. fiurohy cc:

Princinal Staff, RII RCAES Branch Chiefs, RI, III, IV, V G. Navne Reinmuth, IE CONTACT:

R. W. Wright (242 5578) 8612110305 e61209 PDR FOIA ELLIE96-656 PDR

-=%.

f/7

=

)

A R FO W 56 U.S. NUCLEAR REGULATORY COMMISSION ACTION ITEM CONTROL FORM A. INITIATING OFFICE ASSIGNED TR ACKING NUMBE R 03.

04.All

05. DATE OF REPORT 01 SENDING 02 SEQUENCE NUMBER PRIORITY TYPE
06. DATE OF TRANSACTION OFFICE MONTH DAY YEAR MONTH DAY YEAR F O c2 5 0 0 3 1 4 Al L1 0

/

2 8 8 1

08. REQUESTED 07 F ACILITY
09. REQUESTE R MONTH DAY YEAR 64 L L f 'F 0 A! 7 E C

E h v gf M cf

10. DESCRIPTION Lh R

b 1 1 3 1 L G s A S E R T d1'A r x)G L

To R B o e-H m R. G E L 7

H L u.s 1 3 2 R A

B. ACTION OFFICE

01. RECEIVING OF FICE ICheck avoropraste o!'.ce codel
02. PERSON ASSIGNED ESTABLISHED COMPLETION DA1
  • 03 o.

., t TR ANSF E R IN FORMATION 05 TR ANSFER ACTION

06. TRANSFER CODE MO H

D Y YEAR C LOSEOUT INFORMATION 08 CLOSEOUT ACTION

09. M AN-10. C LOSE. 11. CLOSEOUT OATE
12. RE QUEST HOURS OUT CODE woNm 0**

'E*"

ACKNOWLEDGEO

D411.- r.tpnpr_pr/:0N !!

January 28, 1981 ITFM FACillTV t;nt r; CAT;qq

q n pq g, REACTOR CONSTRUCTION Bellef6nte' 1, _2 Telecon 1/27 CDR - Diesel Generator Turbocharger Thrust inspect per MC 2512 DNS

50-438 Bearinos. A notential defect exists in the Region IV notified.

50-439 lubricating oil system that supplies oil to the turbocharger bearings. The defect crevents oil flow to the bearings when t.he engine.is in the standby mode. The turbo-charger thrust bearings may experience rapid wear because of the unique operations of nuclear standby engines. Transamerican -

DeLavel, Inc., reported this as a Part 21 by letter to 0IE dated 12/16/80. The diesel turbocharger was manufactured by Elliot Co.,

of Jeannette, Pennsylvania.. A written report is due 2/27/81.

J GENERAL

.