ML20211K717

From kanterella
Jump to navigation Jump to search

Forwards Ineel Technical Ltr Rept, Evaluation of Fuel Pin Failure Timing in Boiling Water Reactors Dated 990730.Rept Used for Review of BWROG Rept on Revised Source Term Accident Analysis
ML20211K717
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 09/02/1999
From: Sekerak S
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
Shared Package
ML20211K719 List:
References
TAC-M98744, NUDOCS 9909080056
Download: ML20211K717 (1)


Text

,.....

A3Effo p

t UNITED STATES '

g j

NUCLEAR REGULATORY COMMISSION t'

WASHINGTON, D.C. 2006t. 0001 4

o 9.....g September 2,1999 NOTE FOR:

Docket File L,

5 FROM:

S. Patrick Sekerak, Project Manager, Section 1 Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation

SUBJECT:

GRAND GULF NUCLEAR STATION UNIT 1 - -

FILING OF IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) TECHNICAL LETTER REPORT " EVALUATION OF FUEL PIN FAILURE TIMING IN BOILING WATER REACTORS,"

DATED JULY 30,1999 USED FOR REVIEW OF BWROG REPORT ON REVISED SOURCE TERM ACCIDENT ANALYSIS (TAC NO. M98744)

The attached INEEL technical letter ieport is provided for filing in the Public Document Room.

This report was prepared at NRC request to document a confirmatory analysis performed by INEEL in support of the staff review of the BWROG Report " Prediction of the Onset of Fission Gas Release From Fuelin Generic BWR." The staff review was in response to the Entergy Operations, Inc. request by letter dated May 6,1997 (Ref. accession no. 9705140163).

The INEEL technical letter report should be made available for public reference in both the NRC

- Public Document Room and in the local public document room.

Docket No.

50-416 I

+

y.

i cc w/o att:

R. Gramm i

ges pfo 1

9909090056 990902 PDR ADOCK 05000416 p

PDR

_ _ _ _ _ _ _ _ _ _