Summary of 870205 Meeting W/V Stello & J Taylor Re Implementation of Approved Ofc of Special Projects
ML20235P989
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/12/1987
From: James Keppler
NRC OFFICE OF SPECIAL PROJECTS
To: Ebneter S, Charemagne Grimes
NRC OFFICE OF SPECIAL PROJECTS
Shared Package
ML20235P904 List:
References
FOIA-87-562 NUDOCS 8710070455
Download: ML20235P989 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ - - _ _ - - - _ _ - - - _ - - - - - _ - . - - - _ . - - _ - - - . _ . - - - . - _ - -

t g

  • l u UNITED STATE!>

,/ p. as s 'o, NUCLEAR REGULATORY cOMMisslON gDC

? . e (-' * $ REC 10N Ill i h7' j 789 moostvtLT moAD pf) O e,,4' 6[f corn ettyn, ottinois soin ,, ,,

i

\ . . ;,'. . '

February 12, 1987 h jr ,

NM J

MEMORANDUM FOR: Stewart D. Ebneter, Director, TVA Projects Division.

Office of Special Projects Christopher I. Grimes, Director, Comanche Peak Projects Division, Office of Special Projects FROM: James G. Keppler, Director, Office of Special Projects

SUBJECT:

MEETING MINUTES - IMPLEMENTATION OF OFFICE OF SPECIAL PROJECTS On February 5,1987, I met with Victor Stello, Jr. and James M. Taylor to l discuss a number of key considerations associated with the implementation of I the newly approved Of fice of Special Projects. Items discussed and decisions  !

reached are summarized in the enclosure to this memorandum. l l

It is not my normal practice to document meeting minutes. However, I wanted l you to have a record of the key agreements we reached during the meeting.

Please inform your staffs regarding this meeting.

I Q= /

James G. Keppler, Director W l Office of Special Projects

Enclosure:

As stated ge w/ enclosure:

v'V. Stello, Jr., EDO J. M. Taylor, IE H. R. Denton, NRR T. E. Murley, RI J. N. Grace, RII R. D. Martin, RIV FeT A-s-)- 4,2.

kDjoO7 5 871005 Tmt.o{g,_5,2

%hi p

~

^^

A'..

2.

ie Meeting Minutes Meeting on 2/5/87 re C ffice of. Special Projects The following items were discussed and agreed upon during the meeting:

.- OSP will be implemented promptly (next week) and will be fully ,

operational by 3/1/87. Existing systems of. connunication/ notification will remain in effect until changed fonnally. The TVA Senior Management Team will'be dissolved effective 3/1/87.

. With the exception of Hugh Thompson, individuals presently detailed to TVA and Comanche Peak work will continue in their- roles until relieved by the Director, OSP. Every effort will be made to free up those.

Individuals designated for supervisory positions in the reorganization as early as possible --- but' not later than 4/15/87. The Director, OSP, will work out with other Office Directors / Regional Administrators exchanges of individuals presently assigned to TVA and Comanche Peak work, if needed.

Additional people, over that presently authorized, will be assigned on an as-needed basis. _

. While it will be appropriate and acceptable to task certain work ~ to the Program Offices / Regional Offices (e.g., Operator Licensing exams), that approach should be the exception rather than the rule. OSP will be held re:;ponsible by the EDO for the quality of work NRC performs in connection j with TVA and Comanche Peak and, therefore, OSP should arrange to have  ;

individuals detailed from other offices when needed in most instances. 1

. OSP personnel will be assigned to the reactor sites as needed. Keppler will have office space at field locations, HQ, and Region III. Ebneter J and Grimes will have office space at field locations and HQ. All OSP HQ  :

staff will be consolidated into one location.

. The purpose of establishing OSP, along with the office's goals and objectives, need to be carefully articulated. OGC should be consulted in this effort.

. An OGC attorney will not be assigned to OSP. The attorneys assigned to the Comanche Peak hearing will work closely with OSP.

. OSP will be dissolved when the problems associated with TVA and Comanche Peak have been resolved or there is a well conceived plan for implementation.

Individuals assigned to OSP at the time will be guaranteed a comparable position in the agency.