List of Open Cases & Inquires in Region IV Ofc of Investigations Through Dec 1984 Re Facility & Partially Withheld Investigation Record Re Allegations of Falsifying start-up Test ResultsML20236C404 |
Person / Time |
---|
Site: |
Comanche Peak |
---|
Issue date: |
01/30/1985 |
---|
From: |
NRC OFFICE OF INVESTIGATIONS (OI) |
---|
To: |
|
---|
Shared Package |
---|
ML20236C386 |
List: |
---|
References |
---|
FOIA-85-312, FOIA-87-A-18 NUDOCS 8707300051 |
Download: ML20236C404 (2) |
|
|
---|
Category:ARCHIVE RECORDS
MONTHYEARML20116A0341996-07-17017 July 1996 Rev 0 to Temp Vs Distance Profile for 10 RHR Line Containing Stagnant Water ML20058Q4061993-08-30030 August 1993 Package Consisting of Employee Concerns Programs ML20128G9491993-01-22022 January 1993 Calculation of Weights Due to Fire Protection Matl ML20128G9551992-12-29029 December 1992 Design Validation of Conduits W/Thermolag ML20128G9861992-10-0202 October 1992 Ampacity of Power Cable Wrapped W/330-660 Installed as Free Air Drop ML20105A7981992-08-14014 August 1992 Rev 0 to Calculation of Thermal Response for Sprinkler & Raceway Supports ML20101G0471992-06-17017 June 1992 Rev 3 to Calculation 2-FP-0085 Raceway & Firezone R Cable Supports Analysis ML20115B6851992-03-0202 March 1992 Rev 0 to 2-NP-GENX-544, Reconciliation of Local Stress Evaluation Using ME215 Analysis ML20104B4001992-02-13013 February 1992 Rev 1 to Calculation RXE-TA-CP1/0-027, Undervoltage/ Underfrequency Reactor Trip Setpoints ML20127H2091991-11-12012 November 1991 Calculation 2-NP-GENX-551, Evaluation of NUREG-0797 Suppl 1A (Sser 14) App a Sections 12.1 & 12.2 ML20082U5851991-05-0808 May 1991 Liner Attachment Welds Serviceability ML20055E2881990-03-12012 March 1990 Package Consisting of Event Notification Worksheet Re 900312 Inadvertent Safety Injection from Single Train.No Equipment Malfunction/Failure Noted ML20072A8471990-01-23023 January 1990 Rev 2 to Calculation 071, Review Statement for Safety Related Calculations ML20042D3711989-09-28028 September 1989 Audit Rept ATP-89-146S, Scaling Calculations, on 890821-0928 ML20247G4111989-03-31031 March 1989 Transit Time Flow Meter Calculations ML20151T3841988-08-0101 August 1988 Protocol Between OSP & NRR for Technical Review of Comanche Peak Fsar ML20151K5841988-04-18018 April 1988 Page from Draft Rept on Plant Safeteam Activity & Ofc of Investigations Review IR 05000445/19820141988-03-11011 March 1988 Draft of Insp Rept 50-445/82-14 Originally Withheld from FOIA-84-210 Response & Typing Cover Sheets or Transmittal Pages of Documents Withheld from FOIA-86-181 Response ML20148F8201988-01-21021 January 1988 Rev 0 to Investigation of SIF for Weld Shrinkage ML20148F8631988-01-21021 January 1988 Rev 1 to Parallel Snubbers ML20148F2151987-11-19019 November 1987 Rev 0 to Potential Binding of Lugs in Axial Supports ML20237K9771987-08-19019 August 1987 Press Release 87-115 Informing of NRC Release of Documents Re Investigation of NRC Actions Involving Plant Under Const. Portions of Documents Deleted for Personal Privacy Reasons or Prospective Personnel Matters ML20151M9601987-07-20020 July 1987 Package of NRC Administered Requalification Exam Results Summary ML20148F2521987-05-22022 May 1987 Rev 0 to Evaluation of Fluid Transient Cutoff Forces & Development of Screening Criteria for Piping Sys ML20237K0381987-05-14014 May 1987 Record of 870514 Telcon W/S&W & Util Re Insp Requirements for Pipe Supports (Ref Item 4,SWEC NA-1140 Rept) ML20237K0201987-05-13013 May 1987 Record of 870513 Telcon W/S&W & Util Re Insp Requirements for Pipe Supports for Plant.S&W Does Not Consider Insp of Designs to Be Warranted ML20236M4011987-04-17017 April 1987 Package Consisting of 870417 Request for Premium Cost Mail Svc & Unsigned & Undated Ltr to Util Forwarding Draft Insp Repts 50-445/87-02 & 50-446/87-02 & Notice of Deviation ML20128G9681987-02-24024 February 1987 Cable Ampacity Derating Factors for Conduits Boxed in W/ Thermolag (TSI Product) ML20236L9091987-02-19019 February 1987 Rev 1 to CT-1-137-701-S25R, Pipe Support Calculation ML20236N4981987-02-0202 February 1987 Package Consisting of Comanche Peak Steam Electric Station Design Change Authorizations & Evaluation Summaries ML20207D7231986-12-23023 December 1986 Pipe Support Calculation:General Calculation for Richmond Insert/Tube Steel Connections Design Mods ML20207D7481986-12-23023 December 1986 Generic Calculation:Evaluation of Npsi Rear Brackets, Dimension for Design Calculation IA-86-386, Package Consisting of Potential Violations Not Included in Proposed Enforcement Package & Violations of Little Safety Significance Not Included in Proposed Enforcement Package1986-12-16016 December 1986 Package Consisting of Potential Violations Not Included in Proposed Enforcement Package & Violations of Little Safety Significance Not Included in Proposed Enforcement Package ML20211P4701986-12-16016 December 1986 Package Consisting of Potential Violations Not Included in Proposed Enforcement Package & Violations of Little Safety Significance Not Included in Proposed Enforcement Package IA-85-799, Partially Withheld Package of Info Re Plant Investigation, Including Draft NRC Ltr to Aslb,Partial Transcript & Handwritten Notes1986-12-0101 December 1986 Partially Withheld Package of Info Re Plant Investigation, Including Draft NRC Ltr to Aslb,Partial Transcript & Handwritten Notes ML20214R3351986-12-0101 December 1986 Partially Withheld Package of Info Re Plant Investigation, Including Draft NRC Ltr to Aslb,Partial Transcript & Handwritten Notes ML20235S1101986-11-15015 November 1986 Package of Documents Re Nomination & Authorization for Cash Awards to NRC Personnel Involved W/Insp Efforts Re Implementation of Util Comanche Peak Response Team Program IA-87-528, Package of Documents Re Nomination & Authorization for Cash Awards to NRC Personnel Involved W/Insp Efforts Re Implementation of Util Comanche Peak Response Team Program1986-11-15015 November 1986 Package of Documents Re Nomination & Authorization for Cash Awards to NRC Personnel Involved W/Insp Efforts Re Implementation of Util Comanche Peak Response Team Program ML20210E5991986-11-0707 November 1986 Rev 2 to Calculation 020-040-M19, Clip Stiffness Production Value ML20210E6811986-10-31031 October 1986 Rev 4 to Calculation M-03, Cable Tray Properties ML20236L8891986-10-31031 October 1986 Rev 1 to CT-1-137-702-S25R, Pipe Support Calculation. Supporting Documentation Encl ML20210E5221986-10-15015 October 1986 Rev 2 to Calculation M-10, Cable Tray - Clip Angle Stiffness ML20210E5751986-10-10010 October 1986 Rev 2 to Calculation M-12, Qualification Procedures for Cable Tray Support Evaluation ML20148F4591986-09-16016 September 1986 Rev 0 to Fatigue Cycle Determination for Pipe Supports ML20148F4921986-09-10010 September 1986 Rev 2 to Documentation of Use of Low Strength A563 Grade a Double Nuts on High Strength SA 193 Grade B-7th D Rod for Richmond Insert Bolt Connection ML20210E6261986-08-31031 August 1986 Rev 0 to Calculation M-28, Justification of Clip Modeling Procedure ML20148F3351986-08-28028 August 1986 Rev 2 to Development of Method for Evaluating Local Stress in Pipe Support Members ML20210E4611986-08-25025 August 1986 Rev 3 to Calculation M-25, Base Plate Prying Action Factors ML20236L9371986-07-31031 July 1986 Rev 1 to Calculation CT-1-032, Texas Util Generating Co Comanche Peak Steam Electric Station Containment Spray Sys 15454-NP(H) ML20211K2971986-06-11011 June 1986 Partially Withheld Package of 850711 & 860611 Lists of Allegations on Comanche Peak 1996-07-17
[Table view] Category:PACKAGE OF NONCODED MATERIAL
MONTHYEARML20058Q4061993-08-30030 August 1993 Package Consisting of Employee Concerns Programs ML20055E2881990-03-12012 March 1990 Package Consisting of Event Notification Worksheet Re 900312 Inadvertent Safety Injection from Single Train.No Equipment Malfunction/Failure Noted ML20151T3841988-08-0101 August 1988 Protocol Between OSP & NRR for Technical Review of Comanche Peak Fsar ML20151K5841988-04-18018 April 1988 Page from Draft Rept on Plant Safeteam Activity & Ofc of Investigations Review IR 05000445/19820141988-03-11011 March 1988 Draft of Insp Rept 50-445/82-14 Originally Withheld from FOIA-84-210 Response & Typing Cover Sheets or Transmittal Pages of Documents Withheld from FOIA-86-181 Response ML20151M9601987-07-20020 July 1987 Package of NRC Administered Requalification Exam Results Summary ML20236M4011987-04-17017 April 1987 Package Consisting of 870417 Request for Premium Cost Mail Svc & Unsigned & Undated Ltr to Util Forwarding Draft Insp Repts 50-445/87-02 & 50-446/87-02 & Notice of Deviation ML20236N4981987-02-0202 February 1987 Package Consisting of Comanche Peak Steam Electric Station Design Change Authorizations & Evaluation Summaries ML20211P4701986-12-16016 December 1986 Package Consisting of Potential Violations Not Included in Proposed Enforcement Package & Violations of Little Safety Significance Not Included in Proposed Enforcement Package IA-86-386, Package Consisting of Potential Violations Not Included in Proposed Enforcement Package & Violations of Little Safety Significance Not Included in Proposed Enforcement Package1986-12-16016 December 1986 Package Consisting of Potential Violations Not Included in Proposed Enforcement Package & Violations of Little Safety Significance Not Included in Proposed Enforcement Package IA-85-799, Partially Withheld Package of Info Re Plant Investigation, Including Draft NRC Ltr to Aslb,Partial Transcript & Handwritten Notes1986-12-0101 December 1986 Partially Withheld Package of Info Re Plant Investigation, Including Draft NRC Ltr to Aslb,Partial Transcript & Handwritten Notes ML20214R3351986-12-0101 December 1986 Partially Withheld Package of Info Re Plant Investigation, Including Draft NRC Ltr to Aslb,Partial Transcript & Handwritten Notes ML20235S1101986-11-15015 November 1986 Package of Documents Re Nomination & Authorization for Cash Awards to NRC Personnel Involved W/Insp Efforts Re Implementation of Util Comanche Peak Response Team Program IA-87-528, Package of Documents Re Nomination & Authorization for Cash Awards to NRC Personnel Involved W/Insp Efforts Re Implementation of Util Comanche Peak Response Team Program1986-11-15015 November 1986 Package of Documents Re Nomination & Authorization for Cash Awards to NRC Personnel Involved W/Insp Efforts Re Implementation of Util Comanche Peak Response Team Program ML20211K2971986-06-11011 June 1986 Partially Withheld Package of 850711 & 860611 Lists of Allegations on Comanche Peak IA-85-299, Partially Withheld Package of 850711 & 860611 Lists of Allegations on Comanche Peak1986-06-11011 June 1986 Partially Withheld Package of 850711 & 860611 Lists of Allegations on Comanche Peak ML20212M6231986-05-23023 May 1986 Package of News Articles Re Case Opposition to U Removal from & Delivery to Plant ML20198H7221986-05-13013 May 1986 Partially Withheld & marked-up Package of B Caffell Comments on Miscellaneous Category Ssers ML20205D9251986-05-0707 May 1986 Morning Rept Re Five Cables Found Cut in Proximeter Reactor Coolant Pump Violation Monitor Box.Util Investigating ML20205Q5171986-04-17017 April 1986 Partially Withheld Package of marked-up Documents Re Revs to Draft Qa/Qc Sser,Including marked-up Rev 3 to Sser AQ-50, Comanche Peak Sser 11,App O,Sser 11,App P & Sser 11 TC ML20210P9251986-04-17017 April 1986 Partially Withheld Package of Documents Re Allegations Concerning Facility & Comanche Peak Task Force ML20198C6241986-04-11011 April 1986 Package of Records Re Potential Sabotage at Facility ML20203H4051986-04-0404 April 1986 Package of Documents Re Insp Repts 50-445/85-13 & 50-446/85-09 ML20202F9701986-02-28028 February 1986 Allegation Data Input Forms 86-A-023 & 86-A-047 & Allegation Reviews 4-86-A-023 & 4-86-A-047 Re Drug Sales Among Employees ML20207G0461985-12-16016 December 1985 Partially Withheld Package of marked-up Documents Re Insp Repts 50-445/85-18 & 50-446/85-15 ML20154H6431985-12-16016 December 1985 Package of Insp Repts & Related Info Re Const of Plant IA-86-387, Package of Insp Repts & Related Info Re Const of Plant1985-12-16016 December 1985 Package of Insp Repts & Related Info Re Const of Plant ML20205S7591985-12-0606 December 1985 Package Consisting of FSAR Change Request Forms & marked-up FSAR Pages Re Changing Commitment to Reg Guide 1.144,per NRC 850930 Request for Addl Info ML20215H8741985-11-22022 November 1985 Package of Documentation Including Vendor 851105-07 QA Audit,Cable Tray Design,Computer Program Errors & Vendor Audit Response Evaluation for Cable Tray Hanger & Conduit Supports Engineering QA Audit File for Plant ML20206M2351985-07-18018 July 1985 Package of Documents Re Insp Repts 50-445/85-16 & 50-446/85-13 IA-85-312, List of Open Cases & Inquires in Region IV Ofc of Investigations Through Dec 1984 Re Facility & Partially Withheld Investigation Record Re Allegations of Falsifying start-up Test Results1985-01-30030 January 1985 List of Open Cases & Inquires in Region IV Ofc of Investigations Through Dec 1984 Re Facility & Partially Withheld Investigation Record Re Allegations of Falsifying start-up Test Results ML20236C4041985-01-30030 January 1985 List of Open Cases & Inquires in Region IV Ofc of Investigations Through Dec 1984 Re Facility & Partially Withheld Investigation Record Re Allegations of Falsifying start-up Test Results ML20212C5291984-11-13013 November 1984 Partially Withheld Allegation Review of Case 4-85-A-18 Re Drug Investigation ML20205Q6491984-05-18018 May 1984 Rev 1 to 840518 Design Change Authorization 12,212 Re Maintaining 8-inch Separation Requirements & Meeting Seismic Support Criteria Requirements.Voids & Supercedes Rev 0 to Design Change Authorization 12,212 ML20205Q6271984-02-0707 February 1984 Documents Re Facility,Including List & Calendar of Hanger Numbers,Summary of 7,914 Support Insps,Changes in Allowable Angular Error of QI-QAP-11-1-28 & Hanger Package DD-1-012-026-733R.W/one Oversize Drawing ML20210T7431983-12-0909 December 1983 Partially Withheld Documents Re Terminated Employee in Millwright/Boilermaker Dept,Vendor Mgt Investigation in Response to 820806 Complaints & Related Info Encl ML20213A7001983-08-0202 August 1983 Partially Deleted Package of Plant QA Instructors Qualifications,Qa Insps Certifications & QC Recertifications Info,Including Test Questions,Answers & Scores & Training Outlines ML20205Q6351983-07-0606 July 1983 Documents Re Facility,Including 830706 Design Change Authorization,Rev 15 to 840217 Design Change Authorization 3462,Insp Repts MH-1-0010402 & ME-1-0022582,TRT Summary Sheet & 821130 Const Operation Traveler 90650 ML20203H2151982-05-0505 May 1982 Package of Documents,Including Design Change Authorizations, Comanche Peak Review Team Checklists,Comanche Peak Response Team ERC Deviation Repts & Records of Other Insps ML20085M6091981-09-30030 September 1981 Response to NUMARC Questions Re Final Environ Statements from June 1984 & Sept 1981 ML20205Q6571980-03-0707 March 1980 Documents Re Facility,Including Rev 5 to 800307 Design Change Authorization 6905,830321 Rev 6 to 830321 Design Change Authorization 16,614 & 810529 Final Rept IR-I-1755. W/One Oversize Drawing ML20205Q6431979-08-21021 August 1979 Documents Re Facility,Including 790821 Seismic Tubing Support Package 2323-I-001,800307 Design Change authorization,800317 & 811116 Component Mod Cards & 820115 Insp Rept IR-I-2779 1993-08-30
[Table view] |
Text
,
P / '
- w
-- . , .o January 30, 1985 COMANCHE PEAK r [
LISTING OF OPEN CASES AND INQUIRIES IN OI:RIV - DECEMBER 31, 1984 f l 4-84-013 Comanche Peak .
Opened. Alleged Falsification of Data Cards and Intimidation of Pipe 02/24/84 Fitters (Allegation made duriig an interview conducted in regards to 4-84-006)
Investigator: E. B. Griffin ECD: Unknown 4-84-025 Comanche Peak Opened Alleged Improprieties in the Brown & Root DCC 02/07/84 Investigator: E. B. Griffin ECD: Unknown 4-84-030 Comanche. Peak, Glen Rose, TX Opened . Alleged Improper Upgrading of Material at CPSES 06/07/84 Investigator: E. B. Griffin ECD: Unknown 7
4-84-039 Comanche Peak Opened Alleged Intimidation of Quality Control Inspector 09/11/84 Investigator: E. B. Griffin ECD: Unknown 4-84-040 Comanche Peak Opened Alleged Falsification of Startup Doctrination Form
-09/12/84 Investigator: E. B. Griffin ECD: Unknown 4-84-047 Opened. .
Comanche Peak Alleged Falsification of Test Results A
/'
10/09/84 Investigator: E. B. Griffin -
- ECD: Unknown Q4-84-041 Comanche Peak Opened Alleged Falsification of Fab Shop Papermark 09/13/84 Q4-84-045 Comanche Peak Steam Electric Station Opened Alleged Falsification of Coatings Quality Control Training 10/04/84 Records Investigator: E. B. Griffin ECD: Unknown 1
04-84-050 Comanche Peak Steam Electric Station Opened Alleged Intimidation of TUGC0 QA Auditors by TUGC0 QC 11/28/84 Management Investigator: E. B. Griffin ECD: Unknown 8707300051 870724 5 NDE -18 PDR_ f 0 / M " IO '3 I2'
//7 -Q &
C_ - . - - _ _ - - !
- a r = e 3M . U.S %' Lk t. A 6 L GUL ATO AY C0vIU :
.. o; . .
'l INVESTIGATION STATUS RECORD I~.~[,[,c.w.er...tci,,e.s,i,o...,,,,,,ii.,v.o,i.n...i,.s.iocc,s f
,,ir . ., i o , u w o, ., i,, n . .. . , w e . . i. n e e. . 8, ,,,, on.,,,, _ e < ., ; ie, . i 3'; de, ,,:n 1,,.s p,i.ed. md.cate "No C*isape" ee the stau tiso ck Keer the o .s *ie' = >tm the me ' = ea: wad one cor, ie He,mene,s 0".c, of la.en.pai.oris
.a '., ws t 4 -
C a tg Gom y 058 et o .o, ..,.c,. .eto. . . moiuov < uciuU-~ 01 FIELD OFFICE 4-34-047 v c . at acto U~oia
,, . . . . ,, t s ., vit RE610f4 IV O. CostimuC TIO% _
V VIN 004 m .OTMim i I. '~l~'I t t o ssesset ,
- l GRIFFIN COMANCHE PEAK STEAM ELECTRIC STATION: I m ,os . ~ ,,,. ,,a.w w w riCATios or Ttsi assis-On 'Octcber 9,1984, the 01 Field Office Region IV received a occument from the NRC IJR Technical Review Team (TRT) that alleged wrongdoing. This document is from the u
.j. ;Crinche Peak Steam Electric Station (CPSES) ASLB to the applicant requesting
'.m..ers to varicus questions, one of which addresses falsification. .The document
, e Tiairs that on September 21, 1984,'the CPSEC ASLB received testirony during an d
- j '
rucip:ra hearing from a for::ier Texas Utilities Generating Cor.pany Start-up Testing se r. This engineer stated that he had falsified start-up test results ar.d had
" G-T TtTittyTUTittoi in:peccur in w s ign ing a QC inspe.L;on r eport indice 6 irig
'.at a f ttrt-up test had been ccrpleted'successfully, when in fact the test had not f
- cr ccr. ducted. ECD
- Unkncwn M '.
4' t' h
j f ,, .hr.- A >"
'TI: ":cc.ber 30, 1984 - Dee to other higher-priority inv.estigc-lons, anticipate {'
3- ve.ctiation to begin dt: ring the Spring 1985 time f rame. ECD: l'nkn own i
I l
. t. : Date-Ser 31, 1984_-
1 Due to other higher-priority investigations, anticipate !
l .- irc.etigation to begin during the Spring 1985 time frame. ECD: l'aknern I
/ l-t.
6 u l 4
- - - ~ , ~ . . . -
l-q l
$6 m hh- 46. o eq
'N
/ l ,
p4 .
1
(.M @4- @ M D.D h mAh_-- --