ML20236C404

From kanterella
Jump to navigation Jump to search
List of Open Cases & Inquires in Region IV Ofc of Investigations Through Dec 1984 Re Facility & Partially Withheld Investigation Record Re Allegations of Falsifying start-up Test Results
ML20236C404
Person / Time
Site: Comanche Peak  
Issue date: 01/30/1985
From:
NRC OFFICE OF INVESTIGATIONS (OI)
To:
Shared Package
ML20236C386 List:
References
FOIA-85-312, FOIA-87-A-18 NUDOCS 8707300051
Download: ML20236C404 (2)


Text

,

P

/

w

.,.o January 30, 1985 COMANCHE PEAK r

[

LISTING OF OPEN CASES AND INQUIRIES IN OI:RIV - DECEMBER 31, 1984 f

l 4-84-013 Comanche Peak Opened.

Alleged Falsification of Data Cards and Intimidation of Pipe 02/24/84 Fitters (Allegation made duriig an interview conducted in regards to 4-84-006)

Investigator:

E. B. Griffin ECD:

Unknown 4-84-025 Comanche Peak Opened Alleged Improprieties in the Brown & Root DCC 02/07/84 Investigator:

E. B. Griffin ECD: Unknown 4-84-030 Comanche. Peak, Glen Rose, TX Opened.

Alleged Improper Upgrading of Material at CPSES 06/07/84 Investigator:

E. B. Griffin ECD: Unknown 7

4-84-039 Comanche Peak Opened Alleged Intimidation of Quality Control Inspector 09/11/84 Investigator:

E. B. Griffin ECD:

Unknown 4-84-040 Comanche Peak Opened Alleged Falsification of Startup Doctrination Form

-09/12/84 Investigator:

E. B. Griffin ECD: Unknown 4-84-047 Comanche Peak A

Opened..

Alleged Falsification of Test Results

/'

10/09/84 Investigator:

E. B. Griffin ECD:

Unknown Q4-84-041 Comanche Peak Opened Alleged Falsification of Fab Shop Papermark 09/13/84 Q4-84-045 Comanche Peak Steam Electric Station Opened Alleged Falsification of Coatings Quality Control Training 10/04/84 Records Investigator:

E. B. Griffin ECD: Unknown 1

04-84-050 Comanche Peak Steam Electric Station Opened Alleged Intimidation of TUGC0 QA Auditors by TUGC0 QC 11/28/84 Management Investigator:

E. B. Griffin ECD: Unknown 8707300051 870724 5

NDE f 0 / M " IO '3 I2'

-18 PDR_

//7 -Q C_

Lk t. A 6 L GUL ATO AY C0vIU :

  • a r = e 3M.

U.S %'

.. o;.

'l INVESTIGATION STATUS RECORD f

I~.~[,[,c.w.er...tci,,e.s,i,o...,,,,,,ii.,v.o,i.n...i,.s.iocc,s

,,ir.., i o, u w o,., i,, n...., w e.. i. n e e.. 8,,,,, on.,,,, _ e <., ; ie,. i 3'; de,,,:n 1,,.s p,i.ed. md.cate "No C*isape" ee the stau tis ck Keer the o.s *ie' = >tm the me ' = ea: wad one cor, ie He,mene,s o

0".c, of la.en.pai.oris C a tg Gom y 058 et

.a

'., ws t 4

. moiuov < uciuU-~

01 FIELD OFFICE o.o,..,.c,..eto.

4-34-047 O.

CostimuC TIO%

....,, t s., vit RE610f4 IV v

c. at acto U~oia V VIN 004 m.OTMim I. '~l~'I t t o i

ssesset

l GRIFFIN COMANCHE PEAK STEAM ELECTRIC STATION:

I m,os. ~,,,.

,,a.w w w riCATios or Ttsi assis-On 'Octcber 9,1984, the 01 Field Office Region IV received a occument from the NRC IJR Technical Review Team (TRT) that alleged wrongdoing.

This document is from the

.j.

Crinche Peak Steam Electric Station (CPSES) ASLB to the applicant requesting u

'.m..ers to varicus questions, one of which addresses falsification..The document e Tiairs that on September 21, 1984,'the CPSEC ASLB received testirony during an

j r cip
ra hearing from a for::ier Texas Utilities Generating Cor.pany Start-up Testing d

u se r.

This engineer stated that he had falsified start-up test results ar.d had

" G-T TtTittyTUTittoi in:peccur in w s ign ing a QC inspe.L;on r eport indice 6 irig

'.at a f ttrt-up test had been ccrpleted'successfully, when in fact the test had not f

cr ccr. ducted.

ECD:

Unkncwn M '.

h 4' t' j

.hr.-

A >"

f,,

'TI:

":cc.ber 30, 1984 - Dee to other higher-priority inv.estigc-lons, anticipate

{

3-ve.ctiation to begin dt: ring the Spring 1985 time f rame.

ECD:

l'nkn own I

i l

1

. t. :

Date-Ser 31, 1984_-

Due to other higher-priority investigations, anticipate l.-

irc.etigation to begin during the Spring 1985 time frame.

ECD:

l'aknern I

/

l t.

6 u

4 l

J

- - ~, ~... -

l-q

$6 m hh-46.

o

'N eq

/

l p4 1

(.M @4-

@ M D.D h

mAh_--

--