ML20236C404
| ML20236C404 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 01/30/1985 |
| From: | NRC OFFICE OF INVESTIGATIONS (OI) |
| To: | |
| Shared Package | |
| ML20236C386 | List: |
| References | |
| FOIA-85-312, FOIA-87-A-18 NUDOCS 8707300051 | |
| Download: ML20236C404 (2) | |
Text
,
P
/
w
.,.o January 30, 1985 COMANCHE PEAK r
[
LISTING OF OPEN CASES AND INQUIRIES IN OI:RIV - DECEMBER 31, 1984 f
l 4-84-013 Comanche Peak Opened.
Alleged Falsification of Data Cards and Intimidation of Pipe 02/24/84 Fitters (Allegation made duriig an interview conducted in regards to 4-84-006)
Investigator:
E. B. Griffin ECD:
Unknown 4-84-025 Comanche Peak Opened Alleged Improprieties in the Brown & Root DCC 02/07/84 Investigator:
E. B. Griffin ECD: Unknown 4-84-030 Comanche. Peak, Glen Rose, TX Opened.
Alleged Improper Upgrading of Material at CPSES 06/07/84 Investigator:
E. B. Griffin ECD: Unknown 7
4-84-039 Comanche Peak Opened Alleged Intimidation of Quality Control Inspector 09/11/84 Investigator:
E. B. Griffin ECD:
Unknown 4-84-040 Comanche Peak Opened Alleged Falsification of Startup Doctrination Form
-09/12/84 Investigator:
E. B. Griffin ECD: Unknown 4-84-047 Comanche Peak A
Opened..
Alleged Falsification of Test Results
/'
10/09/84 Investigator:
E. B. Griffin ECD:
Unknown Q4-84-041 Comanche Peak Opened Alleged Falsification of Fab Shop Papermark 09/13/84 Q4-84-045 Comanche Peak Steam Electric Station Opened Alleged Falsification of Coatings Quality Control Training 10/04/84 Records Investigator:
E. B. Griffin ECD: Unknown 1
04-84-050 Comanche Peak Steam Electric Station Opened Alleged Intimidation of TUGC0 QA Auditors by TUGC0 QC 11/28/84 Management Investigator:
E. B. Griffin ECD: Unknown 8707300051 870724 5
-18 PDR_
//7 -Q C_
Lk t. A 6 L GUL ATO AY C0vIU :
- a r = e 3M.
U.S %'
.. o;.
'l INVESTIGATION STATUS RECORD f
I~.~[,[,c.w.er...tci,,e.s,i,o...,,,,,,ii.,v.o,i.n...i,.s.iocc,s
,,ir.., i o, u w o,., i,, n...., w e.. i. n e e.. 8,,,,, on.,,,, _ e <., ; ie,. i 3'; de,,,:n 1,,.s p,i.ed. md.cate "No C*isape" ee the stau tis ck Keer the o.s *ie' = >tm the me ' = ea: wad one cor, ie He,mene,s o
0".c, of la.en.pai.oris C a tg Gom y 058 et
.a
'., ws t 4
. moiuov < uciuU-~
01 FIELD OFFICE o.o,..,.c,..eto.
4-34-047 O.
CostimuC TIO%
....,, t s., vit RE610f4 IV v
c. at acto U~oia V VIN 004 m.OTMim I. '~l~'I t t o i
ssesset
- l GRIFFIN COMANCHE PEAK STEAM ELECTRIC STATION:
I m,os. ~,,,.
,,a.w w w riCATios or Ttsi assis-On 'Octcber 9,1984, the 01 Field Office Region IV received a occument from the NRC IJR Technical Review Team (TRT) that alleged wrongdoing.
This document is from the
.j.
'.m..ers to varicus questions, one of which addresses falsification..The document e Tiairs that on September 21, 1984,'the CPSEC ASLB received testirony during an
- j r cip
- ra hearing from a for::ier Texas Utilities Generating Cor.pany Start-up Testing d
u se r.
This engineer stated that he had falsified start-up test results ar.d had
" G-T TtTittyTUTittoi in:peccur in w s ign ing a QC inspe.L;on r eport indice 6 irig
'.at a f ttrt-up test had been ccrpleted'successfully, when in fact the test had not f
- cr ccr. ducted.
ECD:
Unkncwn M '.
h 4' t' j
.hr.-
A >"
f,,
'TI:
":cc.ber 30, 1984 - Dee to other higher-priority inv.estigc-lons, anticipate
{
3-ve.ctiation to begin dt: ring the Spring 1985 time f rame.
ECD:
l'nkn own I
i l
1
. t. :
Date-Ser 31, 1984_-
Due to other higher-priority investigations, anticipate l.-
irc.etigation to begin during the Spring 1985 time frame.
ECD:
l'aknern I
/
l t.
6 u
4 l
J
- - ~, ~... -
l-q
$6 m hh-46.
o
'N eq
/
l p4 1
(.M @4-
@ M D.D h
mAh_--
--