Text
_
.o '
~
'mL 113
~
~~
01:RIV OPEN CASES De l
I I
I i
i 4-84-030 Comanche Peak, Glen Rose TX '
~
Opened 06/07/84 Investigator:
E. B. Griffin ECD:
07/85(Notbeingworkeddue
)
to higher priority cases)
DN# 50-445/446 1
8606270363 860623 PDR F 11 A I
GARDE 86-A-18 PDR
\\
A 11 W 01:RIV OPEN CASES (continued) 4 l
w i
t i
I l
4 i
l 4-84-039 Comanche Peak
~
l Opened 09/11/84 Investigator:
E. 8. Griffin ECD: 07/85 DN# 50-445/456 l
i JtR.11 3 e
01:RIV OPEN CASES (continued) 4-84-047 Comanche Peak Opened 10/09/84 Investigator:
E. B. Griffin ECD: 09/85 (Not being worked due to higher priority cases)
DN# 50-445/446 4-84-050 Comanche Peak Steam Electric Station ~
Opened 11/28/84 Investigator:
B. Griffin ECD: 07/85 DN# 50-445/446 i'
p 9
b I
R 15 W CI:RIV OPEN INQUIRIES 1
i 1
04-84-041 Comanche Peak 1
Opened 09/13/84 Investigator:
E. G. Griffin i
ECD: 08/85 (Not being worked due to higher priority cases)
DNi 50-445/446 a
Q4-84-045 Comanche Peak Steam Electric Station Opened 10/04/84 Investigator:
B. Griffin higer priority cases) g worked due to ECD: 08/85 (Notbein i
DN# 50-445/446 i
+
04-85-003 Comanche Peak Opened 03/06/85 Investigator:
- 3. Griffin ECD:
08/85 DNA 50-445/446 l
1 i
N DI:RIV CLOSED CASES (Active)
(Cases that have been closed 3 months or longer and still in an active mode)
CLOSED W
4-83-006 Comanche Peak SES Opened Alleged Falsification of 07/11/84 3/17/F3 Civil QC Records,,")
4-83-011 Comanche Peak Opened Suspected Falsified QC Records 07/24/84 6/29/83 4-83-016 Comanche Peak Opened Discrimination against QC Inspector 08/31/83 DN# 50-445/446 07/26/84
v.r 11 BOL DI:RIVCLOSEDCASES(Active)
(Cases that have been closed 3 months or longer and still in an active mode)
Ci.0 SED 4-84-013 Comanche Peak Opened Alleged Falsifacation of Data Cards 02/24/84 and Intimidation of Pipe Fitters (Allegation made during an interview conducted l
in regards to 4-84-006)
(Downgraded to Q4-84-013 on 06/07/85)
Investigator:
E. B. Griffin 06/07/85 DN# 50-445/446 l
i t
e
--n...--.
JUL 11555 OI:RIV CLOSED CASES (Active)
(Cases that have been closed 3 months or longer and still in an active mode)
CLOSED er f
4-84-025 Comanche Peak l
Cpened A11eded Improprieties in the 02/07/84 Brown & Root DCC Investigator:
E. 8. Griffin DN# 50-445/446 05/17/85 4-84-029 Comanche Peak, Glen Rose. TX Opened Alleged Use of Nonconforming Materials 06/07/84 (Downgraded to Q4-84-029 9/12/84 and closed as Inquiry on 10/04/84) 10/04/84 DN# 50-445/446 4-84-040.
Comanche Peak Opened Alleged Falsification of Startup 09/12/84 Doctrination Form Investigator:
E. B. Griffin DN# 50-445/446 03/13/85
JUL 11 g,
l 01:RIVCLOSEDCASES(InactiveCases) l (Cases that have been closed for 3 months or longer)
CLOSED l
i i
l l
l i
l i
I 1
1 li 1
l l
1 1
f.
4-82-012 Comanche Peak Opened Alleged Electrical Deficiencies 11/23/82 l
\\
s.
I
_.-__-.__________________-_,_________.,.________.______i
J Ui. 1 1 g 01:RIV CLOSED CASES (Inactive-Continued)
CLOSED
~
4-83-001 Comanche Peak Opened Intimidation of QC Personnel 1/7/83 in Brown & Root Coatings QC group 08/24/83 l
JUL 11585 i
OI:RIV CLOSED CASES (Inactive-continued)
CLOSED 1
L
~
l 1
l 1
i I
4-83-013 Comanche Peak Opened Potential Intimidation of QC Inspectors 7/13/83 ECD 4/84 01/25/84 Comanche Peak 4-83-016 Opened Discrimination Against QC Inspector 8/31/83 EC0 3/84 07/26/84 i
1 i
l l
i Comanche Peak 4-84-006 i
Opened Alleged Intimidation of QC Personnel 01/26/84 (This investigation was originally opened under Case No. 4-83-013 which was administratively closed 1/26/84.
03/07/84
)
4-84-008 Comanche Peak Steam Electric Station i
Opened Alleged Intimidation / Harassment j
02/01 (Continuationof 4-84-006) 07/09/84 4-84-012 Comanche Peak Steam Electric. Station Opened Alleged Intimidation of Brown & Root, Inc.,
i 02/24/84 Structural Welding Crews ECD: Unknown 08/14/84 f
JUL 11 ge
\\
OI:RIV CLOSED INQUIRIES (Active)
CLOSED _
Comanche Peak Q4-84-013 Alleged Falsifacation of Data Cards Opened and Intimidation of Pipe F1tters (Allegation made durin4-84-006)g 4.n interview conducted 06/07/84
, in regards to (0pened as Case 4-84-013 on 02/24/84 -
l Downgraded to Q4-84-013 r,n 06/07/85)
Investigator:
E. B. Griffin 06/12/85 DN# 50-445/446-N e
k 1-A t
L-e,
h e
_, J,,
, x m
3 t
5 A.g 3 e
b
\\
k b
h i
,g
- +
s
'N M
V g
.a m
+-
g
-g i
,8 e
4 s
+
..--+%
'\\
{'-i
~"
.i.)
5 '\\ t y
w6111965 01:RIV CLOSED INQUIRIES p-CLOSED Q4-82-005 CPSES Opened Alleged Improper Weld Practices 08/02/82 06/10/82 04-82-011 CPSES Opened Alleged B&R Temination in Violation of 06/25/82 Section 210. Energy Reorganization Act 08/02/82 9
-w wa n-.
e,
,n,,
,------g--
..c 11 gg3 01:RIV CLOSED INQUIRIES (continued)
CLOSED e.
1' 4-82-025 Comanche Peak Opened Alleged Irregularities in CP 9/29/82 Radiographic Operations 11/05/82 e
y.--,,
JUL 11 WE 01:RIV CLOSED INQUIRIES (continued)
, CLOSED
\\
1 Q4-83-009 Comanche Peak SES Opened Alleged Inadequacies in "As Built" QC 04/06/83, Inspection Program 04/8/83 Q4-83-011 Comanche Peak Opened Alleged Poor Construction Practices 05/23/83 05/20/83 l
l l
JUL II 585 01:RIV CLOSED INQUIRIES (continued)
CLOSED Q4-83-021 Comanche Peak Steam Electric Company Opened Alleged Intimidation of Electrical 08/25/83 Craft Personnel 08/29/83 Q4-83-022 Comanche Peak Steam Electric Station Opened Alleged Improper Implemenation of Technical 10/14/83 procedures Referred to RIV Management for Review 11/02/83 Q4-83-023 Comanche Peak Steam Electric Station Opened Alleged Poor Management Practices 09/20/83 09/16/83 Q4-83-025 Comanche Peak. Glen Rose TX h
Opened Receipt of Information Regarding i
09/16/83 CPSES Discouraging Use of NCR's ECD 02/84 02/10/84 i
J"; 11565 l
DI:RIV CLOSED INQUIRIES (continued)
CLOSED Q4-83-026 Comanche Peak Steam Electric Stati6n Opened Receipt of Information Concerning 09/12/83 Deficiencies in CPSES Coatings Program 10/18/83 Supplemental Report of Inquiry 02/07/84 Q4-84-001 Brown & Root, Inc., Comanche Peak Steam Electric Opened Station 08/23/83 Alleged Improper Construction Practices 01/09/84 Q4-84-007 Comanche Peak Steam Electric Station Opened Alleged Procedural Violations of 01/16/84 Construction Practices 02/09/84
<-u 11 M65 f
OI:RIV CLOSED INQUIRIES (continued)
CLOSED Q4-84-011 Comanche Peak Steam Electric Station Opened Alleged Intimidation of Quality Control 02/24/84 Inspector 03/13/84 ECD Unknown Q4-84-014 Comanche Peak Steam Electric Station Opened Alleged Prenotification of Audit 02/10/84 by Licensee Consultant 03/08/84 ECD March 1984 Q4-84-016 Comanche Peak Steam Electric Station Opened Alleged Improper Construction Practices 02/28/84 ECD March 1984 04/11/84 i
Q4-84-027 Comanche Peak Steam Electric Station Opened Alleged Discriminatory Action 05/12/84 by Texas Utilitites Generating Company
& Brown & Root. Inc.
05/14/84
DI:RIV CLOSED INQUIRIES (continued)
CLOSED Q4-84-029 Comanche Peak, Glen Rose IX Opened Alleged Use of Nonconformance Materials 06/07/84 ECD: Unknown 10/04/84 (Downgradedfrom 4-84-029 on 9/12/84)
Q4-84-037 Comanche Peak Opened Alleged Threat of Industry 08/84
" Blackballing" Falsification 09/07/84 Q4-84-035' '
Comanche Peak Opened Alleged Intimidation 08/28/84 ECD: Unknown 09/12/84 Q4-84-046 Comanche Peak Steam Electric Station Opened Alleged Harassment of a QC Inspector 09/23/84 by QC Supervisors 10/22/84 j
l l
Q4-84-050 Comanche Peak Steam Electric Station j.
Opened Alleged Intimidation of TUGC0 QA Auditors
- l by TUGC0 QC Management Inquiry upgraded to Case 4-84-050 4/30/85 Investigator:
- 8. Griffin 04/30/85
.b
':'? 119%
01:RIV CLOSED INQUIRIES (continued)
CLOSED 1
Q4-85-002 Comanche Peak Steam Electric Station Opened Potential Intimidation of QA Auditor 02/22/85 Investigator:
- 8. Griffin ECD:
Unknown 02/28/85
JUL 111985 DI:RIV CLOSED ASSISTANCE TO INSPECTION REPORTS I
CLOSED A4-83-001 Comanche Peak Alleged Defective Pipe Hangers e
0 e
i
Junaell, 1986) i
- g,..
01: AIV CLOSED!CAS_ES- (Continued),
t CLOSED {
I '" ~ t f * -
to
't i
i i
4-84-039 Comanche Peak i Opened -
Alle'ged Intimidation of Qualisty 09/1:1/84-1 Control;Inspectori Inves tigator:*.
E. B. Griffin DN# 50-445/456 (Cons)
R0liCLOSED 1:
08/21/85 5 ROD ISSUED I 08/28/85 Synopsis of.ROI' Released.to j
POR 1 04/03/86
,.l 444-040 Comanche Peak Opened Alleged, Fdisification of Startup 09/12/84 i Doctrination: Form i Investigator:r E. B. Gritffin i
DN# 50-445/446 03/13/85 4-84-050 i
Comanche Peak Steam Electric Station '
Alleged. Intimidation of TUGC0r QA Additors Opened 11/28/84 i by TUGC0 QC Management
- Investigator::
B. Griffin DN# 50-445/446 (Cons)
ROIF CLOSED i 10/15/85 P.,0D ISSUED 1 10/15/85 l
Synopsis of ROI.Releated to POR 04/03/86 l
Referred to DOJ '<
4 t
l
f dun 2 14, 19dbf OI:RIV CLOSED, CASES: (Continued)
CLOSED ',
4-84-025!
Comanche Peak Opened A11eded: Improprieties;in the,
02/.07/84 Brown & Root DCC Investigator:.
E. B. Griffin r DN#: 50-445/44&
05/17/85
~4-84-029:
Comanche Peak, Glen Rose, TX Opened i
Alleged:Use of Nonconforming Materials Status of case !
06/07/84 (Downgraded to 04-84-029 9/12/84' changed to inquiry and closedias Inquiryson 10/04/84).
10/04/84, DNK 50-445/446' h
I e
4 9
i
==.m
.Jun? 1f1, 1986 3
~
OI:RIV CLOSED CASES!(Continuedh CLOSE0,
4-84-013:
Comanche Peak Opened Alleged:Falsifacations of DatatCardst 02/24/84 and Intimidation of Pipe Fitt6rs:
(Allegatjan inadelduring an interviiew Status of case, conducted;.in regardsrto 4-84-006)f changed:from (Downgraded to Q4-84-013 on 06/07/85)-
case to inquiry 06/07/85 !
Investigator:.' E. B. Griffin DNp 50-445/446 f
t t
t h
i o-_--.
.-f---
.-Juna ill. - 1986)
OhRIV CLOSEDsCASES CLOSEDi
- - ~~~
l Comanche Peak SESt 4-83-006 :
Opened t Alleged Falsification of i 07/11/84) 3/17/83 Civil QC.Recoros 8
i S
i i
4-83-011,
Comanche: Peak <
Opened 9 Suspected Falselfied QC Records' 07/24/84/
6/29/83 !
1 l
i l
i 4-83-016
- Comanche Peaki Openet Discrimination against QC 16spector -
~08/31/83 ON050-445/4461 07/26/84.
- Referred to DOJ:
j 9
i a
..,{.
- -. L-
Jun2-11.?19861.
OI:RIV _0 PEN CASES (continued)
+
4-84-047-Comanche Peak opened i
10/09/84 !
Investigator::
E. B Griffin ECO:' 04/86 s ROI in HQ ffor. Review :
DN# 50-445/446 (Cons) -
Resources Available -.Yes 2
i r
t I
h I
I i
l I
i
._p
Juna 11,1986 01:RIV: CLOSED IM0t)IRIE5? (Continued)
CLOSED 5 04-85-003:
Comanche Peak,
Opened Alleged Intimidation of 03/06/85 Pipe Crek i
Investigator: rB. Griffinf 11/22/85 -
DN#150-445/4'46-
-~
E 4
l LJ
June ', '.,: 1986 f i
_01:RIV CLOSED! INQUIRIES CLOSED 04-84-041?
Comanche: Peak 7 Openedi Alleged Falsif:1 cation of c.
09/13/84s Fab' ShopiPaper7 nark -
Investigator:
E. G. Griffinf ECD 08/85';(Not being worked'due.
to higher. priority cases):
DN# 50-445/4:46 4 '
07/G5/85 I
Q4-84-045, Comanche; Peak Steam-Electric Station Opened >
Alleged falsification of coatingst
.10/04/84, Quality Control Trianing Recordse Investigator: rB. Griffinf DN#150-445/446; (con) 12/03/85' 1
'Y"
- b'
- ,ee-
l Jun2 151, 1986 !
01:RIV CLOSED INQUIRIES CLOSED 04-84-013 Comanche Peak-Opened A11eged t Falsifacationi of Data Cards 06/07/84 and Intimidation' of Pipe Fitters '
(Allegation made.during an interview conducted in regards to 4-84-006):
(0pened as-Case 4-84-013:on 02/24/84.--
Downgraded,to 04-84-013 on 06/07/85)-
Investigator:i E. B. Griffir.
DN( 50-445/446 06/12/85/
Q4-84-030 Comanche Peak, Glen Rose, TX '
Opened Alleged Improper Upgr.adingiof Material 06/07/84 at CPSES Investigator:
E. B. Griffin ECO: 07/85 (Not being worked due to higher priori.ty cases!)
(Downgraded to Qr84-030 7/12/85)
DN# 50-445/446 07/15/85
.. -,