Partially Withheld Package of 850711 & 860611 Lists of Allegations on Comanche Peak
ML20211K297
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/11/1986
From:
NRC OFFICE OF INVESTIGATIONS (OI)
To:
Shared Package
ML20211K253 List:
References
FOIA-85-299, FOIA-85-59, FOIA-86-A-18 NUDOCS 8606270363
Download: ML20211K297 (28)


Text

_

.o '

~

'mL 113

~

~~

01:RIV OPEN CASES De l

I I

I i

i 4-84-030 Comanche Peak, Glen Rose TX '

~

Opened 06/07/84 Investigator:

E. B. Griffin ECD:

07/85(Notbeingworkeddue

)

to higher priority cases)

DN# 50-445/446 1

8606270363 860623 PDR F 11 A I

GARDE 86-A-18 PDR

\\

A 11 W 01:RIV OPEN CASES (continued) 4 l

w i

t i

I l

4 i

l 4-84-039 Comanche Peak

~

l Opened 09/11/84 Investigator:

E. 8. Griffin ECD: 07/85 DN# 50-445/456 l

i JtR.11 3 e

01:RIV OPEN CASES (continued) 4-84-047 Comanche Peak Opened 10/09/84 Investigator:

E. B. Griffin ECD: 09/85 (Not being worked due to higher priority cases)

DN# 50-445/446 4-84-050 Comanche Peak Steam Electric Station ~

Opened 11/28/84 Investigator:

B. Griffin ECD: 07/85 DN# 50-445/446 i'

p 9

b I

R 15 W CI:RIV OPEN INQUIRIES 1

i 1

04-84-041 Comanche Peak 1

Opened 09/13/84 Investigator:

E. G. Griffin i

ECD: 08/85 (Not being worked due to higher priority cases)

DNi 50-445/446 a

Q4-84-045 Comanche Peak Steam Electric Station Opened 10/04/84 Investigator:

B. Griffin higer priority cases) g worked due to ECD: 08/85 (Notbein i

DN# 50-445/446 i

+

04-85-003 Comanche Peak Opened 03/06/85 Investigator:

3. Griffin ECD:

08/85 DNA 50-445/446 l

1 i

N DI:RIV CLOSED CASES (Active)

(Cases that have been closed 3 months or longer and still in an active mode)

CLOSED W

4-83-006 Comanche Peak SES Opened Alleged Falsification of 07/11/84 3/17/F3 Civil QC Records,,")

4-83-011 Comanche Peak Opened Suspected Falsified QC Records 07/24/84 6/29/83 4-83-016 Comanche Peak Opened Discrimination against QC Inspector 08/31/83 DN# 50-445/446 07/26/84

v.r 11 BOL DI:RIVCLOSEDCASES(Active)

(Cases that have been closed 3 months or longer and still in an active mode)

Ci.0 SED 4-84-013 Comanche Peak Opened Alleged Falsifacation of Data Cards 02/24/84 and Intimidation of Pipe Fitters (Allegation made during an interview conducted l

in regards to 4-84-006)

(Downgraded to Q4-84-013 on 06/07/85)

Investigator:

E. B. Griffin 06/07/85 DN# 50-445/446 l

i t

e

--n...--.

JUL 11555 OI:RIV CLOSED CASES (Active)

(Cases that have been closed 3 months or longer and still in an active mode)

CLOSED er f

4-84-025 Comanche Peak l

Cpened A11eded Improprieties in the 02/07/84 Brown & Root DCC Investigator:

E. 8. Griffin DN# 50-445/446 05/17/85 4-84-029 Comanche Peak, Glen Rose. TX Opened Alleged Use of Nonconforming Materials 06/07/84 (Downgraded to Q4-84-029 9/12/84 and closed as Inquiry on 10/04/84) 10/04/84 DN# 50-445/446 4-84-040.

Comanche Peak Opened Alleged Falsification of Startup 09/12/84 Doctrination Form Investigator:

E. B. Griffin DN# 50-445/446 03/13/85

JUL 11 g,

l 01:RIVCLOSEDCASES(InactiveCases) l (Cases that have been closed for 3 months or longer)

CLOSED l

i i

l l

l i

l i

I 1

1 li 1

l l

1 1

f.

4-82-012 Comanche Peak Opened Alleged Electrical Deficiencies 11/23/82 l

\\

s.

I

_.-__-.__________________-_,_________.,.________.______i

J Ui. 1 1 g 01:RIV CLOSED CASES (Inactive-Continued)

CLOSED

~

4-83-001 Comanche Peak Opened Intimidation of QC Personnel 1/7/83 in Brown & Root Coatings QC group 08/24/83 l

JUL 11585 i

OI:RIV CLOSED CASES (Inactive-continued)

CLOSED 1

L

~

l 1

l 1

i I

4-83-013 Comanche Peak Opened Potential Intimidation of QC Inspectors 7/13/83 ECD 4/84 01/25/84 Comanche Peak 4-83-016 Opened Discrimination Against QC Inspector 8/31/83 EC0 3/84 07/26/84 i

1 i

l l

i Comanche Peak 4-84-006 i

Opened Alleged Intimidation of QC Personnel 01/26/84 (This investigation was originally opened under Case No. 4-83-013 which was administratively closed 1/26/84.

03/07/84

)

4-84-008 Comanche Peak Steam Electric Station i

Opened Alleged Intimidation / Harassment j

02/01 (Continuationof 4-84-006) 07/09/84 4-84-012 Comanche Peak Steam Electric. Station Opened Alleged Intimidation of Brown & Root, Inc.,

i 02/24/84 Structural Welding Crews ECD: Unknown 08/14/84 f

JUL 11 ge

\\

OI:RIV CLOSED INQUIRIES (Active)

CLOSED _

Comanche Peak Q4-84-013 Alleged Falsifacation of Data Cards Opened and Intimidation of Pipe F1tters (Allegation made durin4-84-006)g 4.n interview conducted 06/07/84

, in regards to (0pened as Case 4-84-013 on 02/24/84 -

l Downgraded to Q4-84-013 r,n 06/07/85)

Investigator:

E. B. Griffin 06/12/85 DN# 50-445/446-N e

k 1-A t

L-e,

h e

_, J,,

, x m

3 t

5 A.g 3 e

b

\\

k b

h i

,g

- +

s

'N M

V g

.a m

+-

g

-g i

,8 e

4 s

+

..--+%

'\\

{'-i

~"

.i.)

5 '\\ t y

w6111965 01:RIV CLOSED INQUIRIES p-CLOSED Q4-82-005 CPSES Opened Alleged Improper Weld Practices 08/02/82 06/10/82 04-82-011 CPSES Opened Alleged B&R Temination in Violation of 06/25/82 Section 210. Energy Reorganization Act 08/02/82 9

-w wa n-.

e,

,n,,

,------g--

..c 11 gg3 01:RIV CLOSED INQUIRIES (continued)

CLOSED e.

1' 4-82-025 Comanche Peak Opened Alleged Irregularities in CP 9/29/82 Radiographic Operations 11/05/82 e

y.--,,

JUL 11 WE 01:RIV CLOSED INQUIRIES (continued)

, CLOSED

\\

1 Q4-83-009 Comanche Peak SES Opened Alleged Inadequacies in "As Built" QC 04/06/83, Inspection Program 04/8/83 Q4-83-011 Comanche Peak Opened Alleged Poor Construction Practices 05/23/83 05/20/83 l

l l

JUL II 585 01:RIV CLOSED INQUIRIES (continued)

CLOSED Q4-83-021 Comanche Peak Steam Electric Company Opened Alleged Intimidation of Electrical 08/25/83 Craft Personnel 08/29/83 Q4-83-022 Comanche Peak Steam Electric Station Opened Alleged Improper Implemenation of Technical 10/14/83 procedures Referred to RIV Management for Review 11/02/83 Q4-83-023 Comanche Peak Steam Electric Station Opened Alleged Poor Management Practices 09/20/83 09/16/83 Q4-83-025 Comanche Peak. Glen Rose TX h

Opened Receipt of Information Regarding i

09/16/83 CPSES Discouraging Use of NCR's ECD 02/84 02/10/84 i

J"; 11565 l

DI:RIV CLOSED INQUIRIES (continued)

CLOSED Q4-83-026 Comanche Peak Steam Electric Stati6n Opened Receipt of Information Concerning 09/12/83 Deficiencies in CPSES Coatings Program 10/18/83 Supplemental Report of Inquiry 02/07/84 Q4-84-001 Brown & Root, Inc., Comanche Peak Steam Electric Opened Station 08/23/83 Alleged Improper Construction Practices 01/09/84 Q4-84-007 Comanche Peak Steam Electric Station Opened Alleged Procedural Violations of 01/16/84 Construction Practices 02/09/84

<-u 11 M65 f

OI:RIV CLOSED INQUIRIES (continued)

CLOSED Q4-84-011 Comanche Peak Steam Electric Station Opened Alleged Intimidation of Quality Control 02/24/84 Inspector 03/13/84 ECD Unknown Q4-84-014 Comanche Peak Steam Electric Station Opened Alleged Prenotification of Audit 02/10/84 by Licensee Consultant 03/08/84 ECD March 1984 Q4-84-016 Comanche Peak Steam Electric Station Opened Alleged Improper Construction Practices 02/28/84 ECD March 1984 04/11/84 i

Q4-84-027 Comanche Peak Steam Electric Station Opened Alleged Discriminatory Action 05/12/84 by Texas Utilitites Generating Company

& Brown & Root. Inc.

05/14/84

DI:RIV CLOSED INQUIRIES (continued)

CLOSED Q4-84-029 Comanche Peak, Glen Rose IX Opened Alleged Use of Nonconformance Materials 06/07/84 ECD: Unknown 10/04/84 (Downgradedfrom 4-84-029 on 9/12/84)

Q4-84-037 Comanche Peak Opened Alleged Threat of Industry 08/84

" Blackballing" Falsification 09/07/84 Q4-84-035' '

Comanche Peak Opened Alleged Intimidation 08/28/84 ECD: Unknown 09/12/84 Q4-84-046 Comanche Peak Steam Electric Station Opened Alleged Harassment of a QC Inspector 09/23/84 by QC Supervisors 10/22/84 j

l l

Q4-84-050 Comanche Peak Steam Electric Station j.

Opened Alleged Intimidation of TUGC0 QA Auditors

l by TUGC0 QC Management Inquiry upgraded to Case 4-84-050 4/30/85 Investigator:
8. Griffin 04/30/85

.b

':'? 119%

01:RIV CLOSED INQUIRIES (continued)

CLOSED 1

Q4-85-002 Comanche Peak Steam Electric Station Opened Potential Intimidation of QA Auditor 02/22/85 Investigator:

8. Griffin ECD:

Unknown 02/28/85

JUL 111985 DI:RIV CLOSED ASSISTANCE TO INSPECTION REPORTS I

CLOSED A4-83-001 Comanche Peak Alleged Defective Pipe Hangers e

0 e

i

Junaell, 1986) i

- g,..

01: AIV CLOSED!CAS_ES- (Continued),

t CLOSED {

I '" ~ t f * -

to

't i

i i

4-84-039 Comanche Peak i Opened -

Alle'ged Intimidation of Qualisty 09/1:1/84-1 Control;Inspectori Inves tigator:*.

E. B. Griffin DN# 50-445/456 (Cons)

R0liCLOSED 1:

08/21/85 5 ROD ISSUED I 08/28/85 Synopsis of.ROI' Released.to j

POR 1 04/03/86

,.l 444-040 Comanche Peak Opened Alleged, Fdisification of Startup 09/12/84 i Doctrination: Form i Investigator:r E. B. Gritffin i

DN# 50-445/446 03/13/85 4-84-050 i

Comanche Peak Steam Electric Station '

Alleged. Intimidation of TUGC0r QA Additors Opened 11/28/84 i by TUGC0 QC Management

  • Investigator::

B. Griffin DN# 50-445/446 (Cons)

ROIF CLOSED i 10/15/85 P.,0D ISSUED 1 10/15/85 l

Synopsis of ROI.Releated to POR 04/03/86 l

Referred to DOJ '<

4 t

l

f dun 2 14, 19dbf OI:RIV CLOSED, CASES: (Continued)

CLOSED ',

4-84-025!

Comanche Peak Opened A11eded: Improprieties;in the,

02/.07/84 Brown & Root DCC Investigator:.

E. B. Griffin r DN#: 50-445/44&

05/17/85

~4-84-029:

Comanche Peak, Glen Rose, TX Opened i

Alleged:Use of Nonconforming Materials Status of case !

06/07/84 (Downgraded to 04-84-029 9/12/84' changed to inquiry and closedias Inquiryson 10/04/84).

10/04/84, DNK 50-445/446' h

I e

4 9

i

==.m

.Jun? 1f1, 1986 3

~

OI:RIV CLOSED CASES!(Continuedh CLOSE0,

4-84-013:

Comanche Peak Opened Alleged:Falsifacations of DatatCardst 02/24/84 and Intimidation of Pipe Fitt6rs:

(Allegatjan inadelduring an interviiew Status of case, conducted;.in regardsrto 4-84-006)f changed:from (Downgraded to Q4-84-013 on 06/07/85)-

case to inquiry 06/07/85 !

Investigator:.' E. B. Griffin DNp 50-445/446 f

t t

t h

i o-_--.

.-f---

.-Juna ill. - 1986)

OhRIV CLOSEDsCASES CLOSEDi

- - ~~~

l Comanche Peak SESt 4-83-006 :

Opened t Alleged Falsification of i 07/11/84) 3/17/83 Civil QC.Recoros 8

i S

i i

4-83-011,

Comanche: Peak <

Opened 9 Suspected Falselfied QC Records' 07/24/84/

6/29/83 !

1 l

i l

i 4-83-016

  • Comanche Peaki Openet Discrimination against QC 16spector -

~08/31/83 ON050-445/4461 07/26/84.

  • Referred to DOJ:

j 9

i a

..,{.

- -. L-

Jun2-11.?19861.

OI:RIV _0 PEN CASES (continued)

+

4-84-047-Comanche Peak opened i

10/09/84 !

Investigator::

E. B Griffin ECO:' 04/86 s ROI in HQ ffor. Review :

DN# 50-445/446 (Cons) -

Resources Available -.Yes 2

i r

t I

h I

I i

l I

i

._p

Juna 11,1986 01:RIV: CLOSED IM0t)IRIE5? (Continued)

CLOSED 5 04-85-003:

Comanche Peak,

Opened Alleged Intimidation of 03/06/85 Pipe Crek i

Investigator: rB. Griffinf 11/22/85 -

DN#150-445/4'46-

-~

E 4

l LJ

June ', '.,: 1986 f i

_01:RIV CLOSED! INQUIRIES CLOSED 04-84-041?

Comanche: Peak 7 Openedi Alleged Falsif:1 cation of c.

09/13/84s Fab' ShopiPaper7 nark -

Investigator:

E. G. Griffinf ECD 08/85';(Not being worked'due.

to higher. priority cases):

DN# 50-445/4:46 4 '

07/G5/85 I

Q4-84-045, Comanche; Peak Steam-Electric Station Opened >

Alleged falsification of coatingst

.10/04/84, Quality Control Trianing Recordse Investigator: rB. Griffinf DN#150-445/446; (con) 12/03/85' 1

'Y"

  • b'
  • ,ee-

l Jun2 151, 1986 !

01:RIV CLOSED INQUIRIES CLOSED 04-84-013 Comanche Peak-Opened A11eged t Falsifacationi of Data Cards 06/07/84 and Intimidation' of Pipe Fitters '

(Allegation made.during an interview conducted in regards to 4-84-006):

(0pened as-Case 4-84-013:on 02/24/84.--

Downgraded,to 04-84-013 on 06/07/85)-

Investigator:i E. B. Griffir.

DN( 50-445/446 06/12/85/

Q4-84-030 Comanche Peak, Glen Rose, TX '

Opened Alleged Improper Upgr.adingiof Material 06/07/84 at CPSES Investigator:

E. B. Griffin ECO: 07/85 (Not being worked due to higher priori.ty cases!)

(Downgraded to Qr84-030 7/12/85)

DN# 50-445/446 07/15/85

.. -,