Notification of Conduct of a Triennial Fire Protection Baseline Inspection - U.S. Nuclear Regulatory Commission Inspection Report Nos. 05000348/2021012 and 05000364/2021012
ML21127A113
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 05/06/2021
From: Scott Shaeffer
NRC/RGN-II/DRS/EB2
To: Kharrl C
Southern Nuclear Operating Co
References
IR 2021012
Download: ML21127A113 (7)


Text

May 06, 2021

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT - NOTIFICATION OF CONDUCT OF A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION - U.S. NUCLEAR REGULATORY COMMISSION INSPECTION REPORT NOS. 05000348/2021012 AND 05000364/2021012

Dear Mr. Kharrl:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),

Region II staff will conduct a fire protection team inspection at the Farley Nuclear Plant, Units 1 and 2, in June 2021. The inspection team will be led by Mr. Larry J Jones, a Senior Reactor Inspector from the NRC Region II Office. The inspection team will be comprised of four inspectors from the NRC Region II office. The inspection will be conducted in accordance with Inspection Procedure 71111, Attachment 21N.05, Fire Protection Team Inspection, the NRCs baseline fire protection inspection procedure.

On April 26, 2021, during communications between Mr. Gene Surber and Mr. Jones, our respective staffs confirmed arrangements for a two-week onsite inspection. The schedule for the inspection is as follows: The schedule for the inspection is as follows:

  • Week 1 of onsite inspection: June 14 - 18, 2021
  • Week 2 of onsite inspection: June 28 - July 2, 2021 The team lead and senior reactor analyst will work with your staff prior to the start of the inspection to select the scope of structures, systems, and components for evaluation; identify additional documents needed to support the inspection; and obtain unescorted access.

The enclosure to this letter provides an initial list of the documents the team will need for their review. We request that your staff transmit copies of the documents listed in the enclosure to the NRC Region II office for team use in preparation for the inspection. Please send this information so that it will arrive in the NRC Region II office by the dates listed in the enclosure During the weeks leading up to the inspection, the team leader will discuss with your staff the following inspection support administrative details: (1) office space size and location; (2)

specific documents requested to be made available to the team in their office spaces; (3)

arrangements for reactor site access (including radiation protection training, security, safety, and fitness for duty requirements); and (4) the availability of knowledgeable plant staff and licensing organization personnel to serve as points of contact during the inspection.

We request that during the on-site inspection weeks you ensure that copies of analyses, evaluations, or documentation regarding the implementation and maintenance of the station fire protection program, including the success path necessary to achieve and maintain the nuclear safety performance criteria, be readily accessible to the team for their review. Of specific interest for the fire protection portion of the inspection are those documents which establish that your fire protection program satisfies NRC regulatory requirements and conforms to applicable NRC and industry fire protection guidance (i.e., fire protection compliance assessment documents). Also, personnel should be available at the site during the inspection who are knowledgeable regarding those plant systems required to achieve and maintain safe and stable plant conditions, including the electrical aspects of the nuclear safety capability assessment, reactor plant fire protection systems and features, and the station fire protection program and its implementation.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Your cooperation and support during this inspection will be appreciated. If you have questions concerning this inspection or the inspection teams information or logistical needs, please contact Larry Jones, the team lead inspector, in the Region II office at (404) 997-4837 or larry.jones@nrc.gov, or me at (404) 997-4521.

Sincerely,

/RA/

Scott Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-348 & 50-364 License No. NPF-2 & NPF-8 Enclosures:

Fire Protection Team Inspection Document Request cc w/enclosure: via ListServ

ML21127A113 Non-Sensitive Publicly Available SUNSI Review OFFICE RII:DRS RII: DRS NAME L. Jones S. Shaeffer DATE 05/06/2021 05/06/2021

Fire Protection Team Inspection Document Request The initial request for information (i.e., first RFI) concentrates on providing the inspection team with the general information necessary to select appropriate samples to develop a site-specific inspection plan. The first RFIs requested information is specified below in items A.1 thru A.22, and is requested to be provided by May 12, 2021, or sooner, to facilitate the selection of the specific items that will be reviewed during the onsite inspection weeks.

Electronic format is the preferred format, except where specifically noted. If electronic files are made available via a secure document management service, then the remote document access must allow inspectors to download, save, and print the documents in the NRCs regional office.

If a secure document management service is utilized, it is recommended that a separate folder be used corresponding to each item listed below. Documents should be identified by both document number and noun name. Electronic media on compact disc or paper records (hard copy) are also acceptable.

The inspection team will examine the returned documentation from the first RFI and identify/select specific samples to provide a more focused follow-up request to develop the second RFI. The inspection team will submit the specific selected samples to your staff by May 19, 2021. We request that the additional information provided from the second RFI be made available by June 3, 2021.

This document request is based on typical documents that a generic plant might have. As such, this generic document request is not meant to imply that any specific plant is required to have all the listed documents. It is recognized that some documents listed below may not be available for your plant. In addition, the document titles listed below are based on typical industry document names; your plant-specific document titles may vary.

Enclosure

A. DESIGN AND LICENSING BASIS DOCUMENTS A.1 The current version of the Fire Protection Program and Fire Hazards Analysis A.2 Post-fire safe shutdown analysis (or Post-fire Nuclear Safety Capability, Systems, and Separation Analysis Fire if NFPA 805 licensing basis) and the supporting calculations that demonstrate acceptable plant response.

A.3 (If NFPA 805 licensing basis) Fire PRA Summary Report, and list of Fire PRA calculations (If Appendix R licensing basis) Portions of the plants individual plant examination for external events (IPEEE) report addressing fire events. Also, include the results of any post-IPEEE reviews and listings of actions taken/plant modifications conducted in response to IPEEE information that relate to fire risk A.4 (If NFPA 805 licensing basis) NFPA 805 Transition Report, developed in accordance with NEI 04-02 (If Appendix R licensing basis) Licensing basis documents for fire protection (safety evaluation reports, pertinent sections of the final safety analysis report, exemptions, deviations, letters to/from the NRC regarding fire protection/fire safe shutdown, etc.)

A.5 List of post-fire safe shutdown systems and components (i.e., safe shutdown equipment list).

A.6 List of fire areas with automatic fire suppression systems A.7 List, with descriptions, of design change packages performed since the last fire protection team inspection associated with fire protection or post-fire safe shutdown systems.

A.8 List, with descriptions, of any fire protection program changes and evaluations (not limited to Generic Letter 86-10 evaluations) performed since the last fire protection team inspection A.9 Fire Protection System(s) Design Basis Document.

A.10 List of applicable NFPA codes and standards and issuance dates (i.e., codes of record).

A.11 A list or document identifying any deviations from the NFPA codes of record.

Enclosure 2

A.12 Facility Operating License.

A.13 Technical Specifications (electronic format only).

A.14 Updated Final Safety Analysis Report (electronic format only).

A.15 COPY of NRC Safety Evaluation Reports that form the licensing basis for:

  • Post-fire Nuclear Safety Capability.

A.16 COPY of NRC approved exemptions for plant fire protection and post-fire nuclear safety capability features.

A.17 COPY of exemption requests submitted but not yet approved for plant fire protection and post-fire nuclear safety capability features.

A.18 LIST of nuclear safety capability design changes completed in the last three years (including their associated 10 CFR 50.59 and NFPA 805 plant change evaluations).

A.19 List of the top 25 highest fire CDF scenarios for each unit A.20 List of the top 25 highest fire LERF scenarios for each unit A.21 From your most recent PRA including external events and fires:

a. Two risk rankings of components from your site-specific PRA: one sorted by Risk Achievement Worth (RAW), and the other sorted by Birnbaum Importance b. A list of the top 500 cut-sets A.22 Copy of the Quality Assurance Program Manual (including specific fire protection QA manual, if applicable)

Enclosure 2