Letter Sequence RAI |
---|
|
|
MONTHYEARNL-15-1421, License Amendment Request to Revise the Actions of Technical Specification 3.8.9, Distribution Systems- Operating.2016-10-11011 October 2016 License Amendment Request to Revise the Actions of Technical Specification 3.8.9, Distribution Systems- Operating. Project stage: Request ML16326A2542016-11-21021 November 2016 NRR E-mail Capture - Joseph M. Farley, Units 1 and 2 - Acceptance of Requested Licensing Action Regarding TS 3.8.9, Distribution Systems - Operating Project stage: Acceptance Review ML17095A4152017-04-17017 April 2017 Request for Additional Information Project stage: RAI NL-17-0774, Response to Request for Information Regarding License Amendment Request to Revise the Actions of Technical Specification 3.8.9, Distribution Systems - Operating2017-05-15015 May 2017 Response to Request for Information Regarding License Amendment Request to Revise the Actions of Technical Specification 3.8.9, Distribution Systems - Operating Project stage: Response to RAI NL-17-1124, Clarification to Request to Revise LCO 3.8.9 Distribution Systems - Operating2017-06-30030 June 2017 Clarification to Request to Revise LCO 3.8.9 Distribution Systems - Operating Project stage: Request ML17205A0202017-09-15015 September 2017 Issuance of Amendments to Revise TS 3.8.9, Distribution Systems - Operating Project stage: Approval 2017-04-17
[Table View] |
|
---|
Category:Letter
MONTHYEARNL-24-0364, Notification of Deferral of Baffle Former Bolt Inspections from Farley 1R33 to 1R342024-10-31031 October 2024 Notification of Deferral of Baffle Former Bolt Inspections from Farley 1R33 to 1R34 NL-24-0392, Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-0022024-10-28028 October 2024 Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-002 NL-24-0396, Response to Request for Additional Information Related to Relief Request to Defer Charging Pump and Mini-Flow Isolation Valve Inservice Testing2024-10-25025 October 2024 Response to Request for Additional Information Related to Relief Request to Defer Charging Pump and Mini-Flow Isolation Valve Inservice Testing NL-24-0384, Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves2024-10-18018 October 2024 Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves NL-24-0320, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,.2024-09-27027 September 2024 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,. NL-24-0349, Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided2024-09-20020 September 2024 Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided NL-24-0341, Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-09-10010 September 2024 Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency IR 05000348/20244012024-09-10010 September 2024 Security Baseline Inspection Report 05000348-2024401 and 05000364-2024401 ML24247A1102024-09-0505 September 2024 Corporate Notification Letter Aka 210-day Letter NUREG Rev 12 NL-24-0340, Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R322024-09-0404 September 2024 Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R32 NL-24-0259, License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes2024-09-0404 September 2024 License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes ML24242A1332024-08-29029 August 2024 Issuance of Amendment Nos. 250 and 247, Regarding License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, Actions (EPID L-2024-LLA-0098) - Non-Proprietary ML24233A0022024-08-27027 August 2024 Request for Withholding Information from Public Disclosure for Joseph M. Farley Nuclear Plant, Units 1 and 2, License Amendment Request Supplement to Change Technical Specification 3.6.5, Containment Air Temperature Actions ML24240A0812024-08-27027 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Revised Completion Time IR 05000348/20240052024-08-26026 August 2024 Updated Inspection Plan for Joseph M. Farley Nuclear Plant, Units 1 and 2 - Report 05000348/2024005 and 05000364/2024005 IR 05000348/20244022024-08-26026 August 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000348/2024402 and 05000364/2024402 ML24226B2112024-08-22022 August 2024 Regulatory Audit Summary in Support of License Amendment Requests to Revise Technical Specification 3.6.5, Containment Air Temperature, Actions NL-24-0321, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information2024-08-16016 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information IR 05000348/20240022024-08-12012 August 2024 – Integrated Inspection Report 05000348-2024002 and 05000364-2024002 and Exercise of Enforcement Discretion ML24215A3772024-08-0707 August 2024 2024 Farley Requal Inspection Corporate Notification Letter ML24201A2032024-08-0101 August 2024 Request for Withholding Information from Public Disclosure for Joseph M. Farley Nuclear Plant, Units 1 and 2, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions ML24200A1392024-07-25025 July 2024 Regulatory Audit in Support of Review of the License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature ML24199A2072024-07-24024 July 2024 TS 3-6-5 LAR - Individual Notice Transmittal Letter and NSHC - Rev 1 (1) - Letter NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0281, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions2024-07-18018 July 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML24184A0452024-07-0202 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A3762024-07-0101 July 2024 Nonacceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, Using Risk-Informed Process for Evaluations NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0230, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-3602024-06-28028 June 2024 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-360 NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in 05000348/LER-2024-002-01, Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel2024-06-19019 June 2024 Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) 05000348/LER-2024-001, Pressurizer Safety Valve Lift Pressure Outside of Technical Specifications Limits Due to Setpoint Drift2024-06-17017 June 2024 Pressurizer Safety Valve Lift Pressure Outside of Technical Specifications Limits Due to Setpoint Drift NL-24-0238, RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information2024-06-14014 June 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information NL-24-0229, Notice of Intent to Pursue Subsequent License Renewal2024-06-0707 June 2024 Notice of Intent to Pursue Subsequent License Renewal ML24149A0492024-06-0404 June 2024 SNC Fleet - Regulatory Audit in Support of Review of the License Amendment Request to Revise TS 1.1, Use and Application Definitions, and Add New Technical Specification 5.5.21 and 5.5.17, Online Monitoring Program, ML24143A0412024-05-28028 May 2024 Supplemental Information Needed for Using the Risk-Informed Process for Evaluation for the LAR to Change Technical Specification 3.6.5, Containment Air Temperature, Actions NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0188, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 IR 05000348/20240012024-04-24024 April 2024 Integrated Inspection Report 05000348/2024001 and 05000364/2024001 NL-24-0137, RIPE License Amendment Request to Change Containment Air Temperature Actions2024-04-19019 April 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions IR 05000348/20240102024-04-16016 April 2024 NRC Inspection Report 05000348/2024010 and 05000364/2024010 05000364/LER-2024-002, For Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel2024-04-15015 April 2024 For Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel IR 05000348/20240112024-04-12012 April 2024 Fire Protection Team Inspection Report 05000348/2024011 and 05000364/2024011 NL-24-0134, Renewed National Pollutant Discharge Elimination System (NPDES) Permit2024-04-12012 April 2024 Renewed National Pollutant Discharge Elimination System (NPDES) Permit NL-24-0088, Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-04-0505 April 2024 Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency 2024-09-05
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24290A1552024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley, Hatch, and Vogtle 1 and 2 - Proposed Alternative Request for Code Case N-572 ML24290A1572024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley and Vogtle 1 and 2 - Alternative Request for Pressurizer Welds (L-2024-LLR-0047) ML24271A0052024-09-26026 September 2024 NRR E-mail Capture - for Your Response - RAI - Farley and Vogtle 1 and 2 - Proposed Alternative Request for Steam Generator Welds (L-2024-LLR-0041) ML24227A0512024-08-14014 August 2024 August 14, 2024 - Request for Additional Information - Farley, Units 1 and 2 - Proposed LAR to Revise TS SR 3.6.6.8 Frequency ML24179A1242024-06-27027 June 2024 ISFSI Request for Information (2024) ML24143A0412024-05-28028 May 2024 Supplemental Information Needed for Using the Risk-Informed Process for Evaluation for the LAR to Change Technical Specification 3.6.5, Containment Air Temperature, Actions ML24037A1362024-02-0606 February 2024 RP DLR Feb. 2024 ML24037A1352024-02-0505 February 2024 E-mail ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23243A9952023-08-31031 August 2023 Request for Baseline RP Inspection ML23236A0022023-08-22022 August 2023 NRR E-mail Capture - Request for Additional Information - Farley, Units 1&2, Emergency TS 3.6.5 LAR ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23095A0832023-04-0505 April 2023 NRR E-mail Capture - for Your Action - RAI - Farley - Containment Isolation Valves, Surveillance Requirement 3.6.3.5 LAR (L-2022-LLA-0189) ML23086A0232023-03-24024 March 2023 NRR E-mail Capture - for Your Action - Draft RAIs - Farley Surveillance Requirement (SR) 3.6.3.5 License Amendment Request (LAR) (L-2022-LLA-0189) ML23003A8092023-01-0303 January 2023 NRR E-mail Capture - for Your Action - RAI - Farley - ISI Alternative FNP-ISI-ALT-05-05 (L-2022-LLR-0068) ML22334A1482022-11-30030 November 2022 NRR E-mail Capture - for Your Action - RAI - Farley - TS 3.4.10 LAR, Psv Setpoint (L-2022-LLA-0098) ML22123A1782022-05-0303 May 2022 NRR E-mail Capture - RAIs for Farley LAR Re. TS 5.5.17 Containment Leakage Rate Testing Program ML22123A1802022-05-0303 May 2022 NRR E-mail Capture - Correction - RAIs for Farley LAR Re. TS 5.5.17 Containment Leakage Rate Testing Program ML22112A0892022-04-22022 April 2022 NRR E-mail Capture - Draft RAIs for Farley LAR Re. TS 5.5.17 ML22104A1312022-04-14014 April 2022 NRR E-mail Capture - Request for Additional Information - Farley and Vogtle - Relocate Piping Inspection License Amendment Request (L-2021-LLA-0235) ML21321A3772021-11-16016 November 2021 NRR E-mail Capture - RAIs for Farley LAR Sump Recirculation Valve Encapsulation Vessel Removal ML21321A3752021-11-10010 November 2021 NRR E-mail Capture - Draft RAIs for Farley LAR Sump Recirculation Valve Encapsulation Vessel Removal ML21127A1132021-05-0606 May 2021 Notification of Conduct of a Triennial Fire Protection Baseline Inspection - U.S. Nuclear Regulatory Commission Inspection Report Nos. 05000348/2021012 and 05000364/2021012 ML21012A3242021-01-12012 January 2021 NRR E-mail Capture - Request for Additional Information - Farley, 1 and 2 - Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML20351A4042020-12-16016 December 2020 NRR E-mail Capture - Draft RAIs for Farley 50.69 (ML20170B114) ML20293A0752020-10-14014 October 2020 NRR E-mail Capture - RAIs for SNC Fleet EP LAR (L-2020-LLA-0150 and L-2020-LLA-0151) ML20254A1912020-09-10010 September 2020 004 Radiation Safety Baseline Inspection Information Request ML20174A5812020-06-22022 June 2020 Notification of Inspection and Request for Information ML20149K6252020-05-27027 May 2020 NRR E-mail Capture - RAIs for SNC Fleet Fire Protection Exemption Requests ML20149K4392020-05-21021 May 2020 NRR E-mail Capture - Joseph M. Farley Nuclear Plant, Units 1 and 2 - Measurement Uncertainty Recapture Power Uprate RAI Sfnb RAI No. 2 ML20121A1472020-04-29029 April 2020 NRR E-mail Capture - Joseph M. Farley Nuclear Plant, Units 1 and 2 - Measurement Uncertainty Recapture Power Uprate Follow-up RAI Emib No. 1 ML20115E3922020-04-24024 April 2020 NRR E-mail Capture - Joseph M. Farley Nuclear Plant, Units 1 and 2 - Request for Additional Information Regarding TS 3.3.1 and TS 3.3.7 License Amendment Request ML20084G5272020-03-23023 March 2020 NRR E-mail Capture - Joseph M. Farley Nuclear Plant, Units 1 and 2 - Request for Additional Information Measurement Uncertainty Recapture Power Uprate ML20055E9752020-02-28028 February 2020 Request for Additional Information Update the Spent Fuel Pool Criticality Safety Analysis (EPID L-2019-LLA-0212) Non-Proprietary Version ML19150A1022019-05-29029 May 2019 Request for Additional Information Regarding Relief Request FNP-ISI-05-04, Version 1.0 (L-2019-LLR-0020) ML19066A0422019-03-0707 March 2019 NRR E-mail Capture - Joseph M. Farley Nuclear Plant, Units 1 and 2 - Request for Additional Information Regarding Relief Request FNP-ISI-RR-03, Version 1.0 ML19056A2142019-02-25025 February 2019 NRR E-mail Capture - Joseph M. Farley Nuclear Plant, Units 1 and 2 - Request for Additional Information Regarding Relief Request FNP-ISI-RR-02, Version 1.0 ML19052A1712019-02-20020 February 2019 Rad Safety Inspection Document Request ML18355A4772019-01-0404 January 2019 Request for Additional Information Revise TS 5.2.2.g and Update Emergency Plan Minimum On-Shift Staff Tables ML18337A4032018-12-0606 December 2018 Request for Additional Information Revise Technical Specification 5.2.2.G and Updating Emergency Plan Minimum On-Shift Staff Tables ML18239A1542018-08-24024 August 2018 Emergency Preparedness Inspection and Request for Information ML18087A1462018-05-0101 May 2018 Request for Additional Information TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML18058B1522018-02-27027 February 2018 Emailed RP RFI 2018-02 ML18058A0812018-02-27027 February 2018 Enclosurequest for Additional Information(Rai for Review of Southern Nuclear Operating Company'S Decommissioning Funding Plan Updates for Joseph M. Farley,Unit 1 and 2;Edwin I. Hatch,Units 1 and 2; and Vogtle Electric Generating Plant, Unit ML17360A0552017-12-20020 December 2017 NRR E-mail Capture - Joseph M. Farley, Units 1 and 2 - Supplemental RAI Request No. 7 to License Amendment Request to Revise TS 5.5.17 Containment Leakage Rate Testing Program (CAC Nos. MF8844, MF8845; EPID No. L-2016-LLA-0015) ML17306A0872017-11-0808 November 2017 Request for Additional Information Regarding the Decommissioning Funding Status Reports (EPID L-LRO-2017-0008) ML17219A0012017-08-0303 August 2017 NRR E-mail Capture - Joseph M. Farley, Units 1 and 2 - Supplemental RAI Request No. 5(b), 5(c), and 6 Related to License Amendment Request to Revise TS 5.5.17 Containment Leakage Rate Testing Program ML17194A7872017-07-21021 July 2017 Request for Additional Information ML17095A4152017-04-17017 April 2017 Request for Additional Information ML17065A2012017-03-24024 March 2017 Request for Additional Information 2024-09-26
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 17, 2017 Mr. James J. Hutto Regulatory Affairs Director Southern Nuclear Operating Co., Inc.
P.O. Box 1295, Bin 038 Birmingham, AL 35201-1295
SUBJECT:
JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 1 AND UNIT 2 - REQUEST FOR ADDITIONAL INFORMATION (CAC NOS. MF8458 AND MF8459)
Dear Mr. Hutto:
By letter dated October 11, 2016, Southern Nuclear Operating Company, Inc. (SNC, the licensee) submitted a license amendment request to revise the Technical Specifications (TSs) for the Joseph M. Farley Nuclear Plant, Units 1 and 2.
The proposed changes would add new Action Conditions (A, B, and C) to TS 3.8.9, "Distribution Systems - Operating" that address inoperable 600 volt alternating current (AC) load center (LC) 1-2R. The proposed changes include Required Actions and associated Completion Times for the LC 1-2R.
The Nuclear Regulatory Commission has determined that the enclosed Request for Additional Information is needed to complete its review. The enclosure was discussed with your staff on April 17, 2017. SNC agreed to respond within 30 days of this letter. Please note that the NRC staff's review is continuing and further requests for information may be developed.
Sincerely, Shawn Williams, Senior Project Manager Plant Licensing Branch, 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-348, 50-364
Enclosure:
Request for Additional Information
REQUEST FOR ADDITIONAL INFORMATION TS 3.8.9. "DISTRIBUTION SYSTEMS-OPERATING" SOUTHERN NUCLEAR OPERATING COMPANY. INC.
JOSEPH M. FARLEY NUCLEAR PLANT. UNIT 1 AND UNIT 2 DOCKET NOS. 50-348. 50-364 By letter dated October 11, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16285A354), Southern Nuclear Operating Company, Inc. (SNC, the licensee) submitted a license amendment request (LAR) to revise the Technical Specifications (TSs) for the Joseph M. Farley Nuclear Plant (FNP), Units 1 and 2. The licensee proposed change would add new Action Conditions (A, B, and C) to TS 3.8.9 that address inoperable 600 Volt alternating current (AC) load center (LC) 1-2R. The proposed changes include Required Actions and associated Completion Times for the LC 1-2R.
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the application and has determined that the following questions are needed to complete its review.
Request for Additional Information (RAil No. 1 Regulatory Basis FNP General Design Criteria, Criterion 17, "Electric Power Systems", states, in part:
An onsite electric power system and an offsite electric power system are provided to permit functioning of structures, systems, and components important to safety. The safety function for each system (assuming the other system is not functioning) provides sufficient capacity and capability to assure that specified acceptable fuel design limits and design conditions of the reactor coolant pressure boundary are not exceeded as a result of anticipated operational occurrences, and the core is cooled and containment integrity and other vital functions are maintained in the event of postulated accidents.
The onsite electric power supplies, including the batteries, and the onsite electric distribution system, have sufficient independence, redundancy, and testability to perform their safety function assuming a single failure.
Provisions are included to minimize the probability of losing electric power from any of the remaining supplies as a result of, or coincident with, the loss of power generated by the nuclear power unit, the loss of power from the transmission network, or the loss of power from the onsite electric power supplies.
Enclosure
The licensee has stated on page E 1-8 of the LAR:
In the event of a dual unit LOSP [loss of offsite power], this alignment (i.e., 1 C and 1-2A tied to the same unit) would leave the affected unit's (i.e. the unit unable to supply power to the LC 1-2R) A-train de-energized. This is the basis for the affected unit entering [Limiting Condition for Operation] (LCO) 3.8.1 for an inoperable diesel set, since the 1 C DG [diesel generator] may therefore be unavailable to align to the opposite unit as the 1-2A DG (i.e. the unit not experiencing the SI [safety injection]). Consistent with the definition of OPERABILITY, the 1C DG must be declared inoperable for the affected unit.
If the problem is a failed component i.e., DH08-2, or SSXFMR 2R or EROS or SSCs downstream of the H bus, as shown in Enclosure 5 of the LAR as the cause of Proposed Condition A, then declaring the 1C DG inoperable and aligning the 1C DG selector switch to the non-affected unit appears to make the A-train electrical distribution not available in the affected unit.
Request Would the issue described above be considered a reduction in plant safety? Also, considering the concerns described above, please justify Proposed Condition A or a TS modification.
RAI No. 2 Regulatory Basis FNP TS 1.1, "Definitions" state the definition for OPERABLE-OPERABILITY as:
A system, subsystem, train, component, or device shall be OPERABLE or have OPERABILITY when It is capable of performing its specified safety function(s) and when all necessary attendant instrumentation, controls, normal or emergency electrical power, cooling and seal water, lubrication, and other auxiliary equipment that are required for the system, subsystem, train, component, or device to perform its specified safety function(s) are also capable of performing their related support function(s).
When in CONDITION C of the proposed TS, Load Center 1-2R will be unable to supply power to any of its loads, including Switchgear Room A fans and louver damper motors and heaters.
Loss of ventilation/heating in Switchgear Room A could affect the function of the 1H and 2H busses and their ability to perform their support function, which in turn affect the long term safety function and OPERABILITY of the 1F, 2F, 1Kand 2K busses.
Request Considering the mission time of the 1F, 2F, 1K and 2K busses in mitigating a design basis accident (OBA) and with design basis weather conditions, discuss the effect of the loss of ventilation in Switchgear Room A, on the long term function of the 1H and 2H busses and their ability to perform support functions for the Class 1E K and F buses in order for these buses to
remain operable throughout their mission time as the buses power safety related loads during a OBA. Please include a discussion regarding how long until the associated electrical busses would be unable to perform their safety function and the basis for such determination. Please identify the affected TS and the associated required actions of the TS and identify any compensatory actions.
RAI No. 3 Regulatory Basis Title 10 of the Code of Federal Regulations (10 CFR) 50.36(c)(2)(i), states, in part:
Limiting conditions for operation are the lowest functional capability or performance levels of equipment required for safe operation of the facility. When a limiting condition for operation of a nuclear reactor is not met, the licensee shall shut down the reactor or follow any remedial action permitted by the technical specifications until the condition can be met.
The licensee's proposed Required Action A.1 states, "Align 1C DG Unit Selector Switch to non-affected unit." Proposed Condition B is for when Condition A is not met.
Request Describe any situations when the licensee would choose not to perform Required Action A.1 and provide a justification for each situation where Condition 8 is entered without entry into Required Action A.1 or A.2.
RAINo.4 Page E1-3 of the LAR in the paragraph beginning with "TS 3.8.9 ... "states that the" ... unit(s) must be in MODE 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />." This appears to be in error as the current TS Condition D (TS page 3.8.9-2) requires MODE 4 as the end state (Amendments 202 and 198 for Units 1 and 2, respectively) Conditions for A, B, and C not met. Please clarify the apparent error.
RAI No. 5 Regulatory Basis FNP General Design Criteria, Criterion 17, "Electric Power Systems" as described in RAI No. 1.
In the LAR, Section 2.0, the licensee states that the TS Bases Table B 3.8.9-1 lists the LC 1- 2R as one of the required load centers (LCs) to meet the LCO 3.8.9. This LC is considered shared equipment since it supplies power to loads that affect both units and it also receives power from either units' 4160V bus H ( 1H and 2H). Therefore, whenever this LC is inoperable, both Unit 1 and Unit 2 must enter current LCO 3.8.9 Condition A if they are in a Mode of applicability (MODES 1 - 4).
The proposed CONDITION A, Required Action A.1 requires alignment of the 1C DG selector switch using operator actions in the main control room. FNP Load Diagram, drawing D-173096, shows the Auto Transfer Device (ATD) connecting to both power sources which are independent and redundant from the 1 H and 2H buses feeding LC 1-2R.
In the proposed CONDITION A, LC 1-2R is inoperable due to power supply being unavailable either from buses 1Hor2H. In the LAR, the licensee did not appear to address the design features and capability of ATD to switch from one source to alternate source for the proposed CONDITION A, Required Action A.1.
Request
- a. The proposed Required Action A.1 states "align 1C DG Unit Selector Switch to non-affected Unit." Explain why Action A.1 is required since ATD will transfer from normal source (affected Unit) to alternate source (non-affected Unit) or vice versa without manual operation. Please explain the terms "affected Unit" and "non-affected Unit" and the scenarios assumed.
- b. The current TS 3.8.9, "Distribution Systems - Operating," Condition A, allows 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to restore the inoperable Alternate Current (AC) electrical power distribution system(s) to OPERABLE status. Since the ATD allows auto transfer to the available power source (alternate), explain why the 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Completion Time (CT) LCO is not adequate to restore the inoperable AC electrical power distribution system(s) to OPERABLE status.
- c. If the ATD fails to transfer from its position, how this failure will affect the proposed TS changes. What will be the CT for restoring the ATD to operable status?
- d. In the FNP LAR, the licensee explained that current TS 3.8.9, Condition A has a CT of 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> for the inoperable LC 1-2R, which would appear to indicate a dual unit shutdown is required after the expiration of the 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> CT because LC 1-2R is shared between both units. In addition, the CT limits the extent of maintenance that could be performed. The licensee also explained that the new proposed Conditions (A, B, and C) to TS 3.8.9, "Distribution System - Operating," would reduce the likelihood of an unnecessary dual-unit TS required shutdown while also providing more flexibility for maintenance activities. Please provide details of all maintenance to be performed on the LC 1-2R including their frequencies. Also, provide plant specific operating experience that required LC 1-2R to be declared inoperable (failure of both sources or equipment).
RAI No. 6 Regulatory Basis 50.36(c)(2)(i) as described in RAI No. 3.
FSAR Section 8.3.1.1.7.2 states that DGs 1-2A and 1C are dedicated to train A, but there are no Design-Basis Events (DBEs) in which DG 1-2A or 1C supplies power to safety loads of both units simultaneously. The Unit 1 and Unit 2 breakers for each of these two diesels are interlocked so as to prevent the diesels from being connected to both units at the same time; therefore, DGs 1-2A and 1C are characterized as "shared" only from the point of view of their capability to align to either Unit 1or Unit 2.
Request Assuming the proposed TS 3.8.9, Condition A, Required Action A.1 is completed, as stated, then the affected Unit will have one diesel (i.e., Set B DG. In Condition A, Required Action A.1, DG 1C will be aligned to the non-affected Unit and DG 1-2A will be aligned to the affected Unit).
Subsequently, if a DBE (Loss Of Offsite Power (LOSP)/Loss-Of-Coolant Accident (LOCA) or LOSP) occurs in the non-affected Unit, then as per the design 1-2A DG should align with the non-affected Unit. Then both 1C and 1-2A DGs are aligned with the non-affected Unit. What actions will be taken under this scenario? In this case, explain how this requested TS change meet the design basis as specified in accident analysis. In addition, explain the plant response, if a DBE such as LOSP or LOSP/LOCA coincident with a single failure (e.g., loss of Set B DG) occurs on the non-affected Unit.
RAI No. 7 Regulatory Basis FNP TS 1.1 defines OPERABLE-OPERABILITY as described in RAI No. 2.
The proposed TS 3.8.9 Condition A, Required Action A.2 requires to declare DG 1C as inoperable for the affected Unit. Proposed Required Action A.2 would limit operation to 10 days for the affected unit. Also, if the affected unit's DG Set B were to become inoperable during this condition, TS 3.8.1 Condition E would be entered for two DG sets being inoperable.
Request Since DG 1C is shared between the Units and the proposed change requires the DG 1C to be declared inoperable even for inoperability resulting from other components on the power paths to maintain power availability to LC 1-2R, provide technical and regulatory basis demonstrating the proposed action is conservative in maintaining plant safety.
SUBJECT:
JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 1 AND UNIT 2 - REQUEST FOR ADDITIONAL INFORMATION (CAC NOS. MF8458 AND MF8459) DATED APRIL 17, 2017 DISTRIBUTION:
PUBLIC LPL2-1 R/F RidsNrrDorlLpl2-1 Resource RidsNrrDeEpnb Resource RidsNrrLAKGoldstein Resource RidsRgn2MailCenter Resource RidsNrrPMFarley Resource RicsACRS_MailCTR Resource GPurciarello, NRR HKodali, NRR NOtta, NRR PSnyder, NRR SWilliams, NRR ADAMS Access1on No.: ML17095A415 *b>Y e-ma1*1 OFFICE DORL/LPL2-1/PM DORL/LPL2-1/LA DE/EE EB/BC*
NAME SWilliams KGoldstein JZimmerman DATE 4/13/17 4/06/17 4/12/17 OFFICE DSS/SBPB//BC* DORL/LPL2-1 /BC DORL/LPL2-1/PM NAME. RDennig MMarkley SWilliams DATE 3/29/17 4/17/17 4/17/17 OFFICIAL RECORD COPY