ML20203Q318

From kanterella
Revision as of 02:17, 31 December 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Tech Specs,Incorporating Proposed Change 122, Substituting Table 4.2-2, Min Frequencies for Equipment Tests, for Existing Table Re Turbine Valve Test Frequencies
ML20203Q318
Person / Time
Site: Maine Yankee
Issue date: 05/05/1986
From:
Maine Yankee
To:
Shared Package
ML20203Q304 List:
References
NUDOCS 8605090237
Download: ML20203Q318 (1)


Text

i l

MAINE YANKEE ATOMIC POWER COMPANY (

t* Table 4.2-2 l

Minimum Freauencies for Eauioment Tests leit Freauency

1. Control Element Assemblies Drop Times of all full-length Each refueling (CEAs) CEAs interval
2. Control Element Assemblies Partial Movement of all CEAs Every two weeks (minimum of 6") when the reactor is critical
3. Pressurizer Safety Valves Set Point One valve each refueling interval
4. Main Steam Safety Valves Set Point 2 valves per steam generator, each refueling ..

interval

5. Refueling System Interlocks Functioning Prior to

, refueling operations

6. Primary System Leakage Evaluate Daily **
7. Diesel Fuel Supply Fuel Inventory Weekly
8. Deleted
9. Turbine stop, governor, Functioning Every six weeks ]

Reheater and Intercept when the turbine Valve is operating

10. L.P. Turbine Rotor Visual, Magnetic Particle One Rotor each Inspection or Liquid Penetrant 4 years

! 11. Post-accident containment vent system a) Hydrogen detector Calibrate Upon installing and within one month of startup from each refueling shutdown 4.2-4 05/05/86 6997L-FHS

W Eau BU9?h' P