ML20205M975
| ML20205M975 | |
| Person / Time | |
|---|---|
| Site: | Maine Yankee |
| Issue date: | 10/18/1988 |
| From: | Maine Yankee |
| To: | |
| Shared Package | |
| ML20205M965 | List: |
| References | |
| NUDOCS 8811030381 | |
| Download: ML20205M975 (2) | |
Text
.
,G :-
s'
. {:l V 7 N.e MaineYankee
~
i t
s1 4
ATTACHMENT 3 f
t PAGE CHANGE LIST l
Remove existing page 4.2-6 and replace with the enclosed page 4.2-6.
l l
r f
f l
I f
r f
I I
^
[
f i
?
881103o3g1 881018 PDR ADOCK 05000309
!i I
4 PDC
,r 9446L-RHS
.,l_
MaineYankee i
TABLE 4.2-2 MINIMUM FRE00ENCIES FOR EOUIPMENT TESTS IESI FRE00ENCY 1.
Control Element Assemblies Drop times of all full-length Each refueling (CEAs)
CEAs interval 2.
Control Element Assemblies Partial movement of all CEAs Monthly when the
]
(minimum of 6")
reactor is critical 3.
Pressurizer Safety Valves Set Point One valve each refueling interval
- 4. -Main Steam Safety Valves Sot Point 2 valves per steam generator, each refueling interval 5.
Refueling System Interlocks Functioning Prior to refueling operations 6.
Primary System Leakage Evaluate Daily **
i 7.
Diesel Fuel Supply Fuel Inventory Weekly i
8.
Deleted 9.
Turbine Stop Governor.
Functioning Monthly when the Reheater and Intercept turbine is operating Valves
- 10. L.P. Turbine Rotor Visual, Magnetic Particle or One rotor each 4 Inspection Liquid Penetrant years
- 11. Post-accident containment f
vont system
(
a) System valves Verify operability Upon installation and within one month of startup from each refueling shutdown, b)
Flowpath Verify system flow Upon installation capability by observing and within one month finw indication on the of startup from each system flu. meter refueling shutdown.
I 4.2-6 10/18/88
[
l 9446L-RHS f
.