i MAINE YANKEE ATOMIC POWER COMPANY t*
Table 4.2-2 Minimum Freauencies for Eauioment Tests leit Freauency 1.
Control Element Assemblies Drop Times of all full-length Each refueling (CEAs)
CEAs interval 2.
Control Element Assemblies Partial Movement of all CEAs Every two weeks (minimum of 6")
when the reactor is critical 3.
Pressurizer Safety Valves Set Point One valve each refueling interval 4.
Main Steam Safety Valves Set Point 2 valves per steam generator, each refueling..
interval 5.
Refueling System Interlocks Functioning Prior to refueling operations 6.
Primary System Leakage Evaluate Daily **
7.
Diesel Fuel Supply Fuel Inventory Weekly 8.
Deleted 9.
Turbine stop, governor, Functioning Every six weeks
]
Reheater and Intercept when the turbine Valve is operating
- 10. L.P. Turbine Rotor Visual, Magnetic Particle One Rotor each Inspection or Liquid Penetrant 4 years
- 11. Post-accident containment vent system a) Hydrogen detector Calibrate Upon installing and within one month of startup from each refueling shutdown 4.2-4 05/05/86 6997L-FHS
- W Eau BU9?h' P