.l ATTACHMENT TECHN ICAL._ S P ECI EICATION _PAGE._ CHANGES E0R_PROEOSED_ CHANGE _NO._201 (TechnicalSpecif.1 cation _5.5.B._pages_5.5-4_through_55 D i
l l
t 9610020112 960925 PDR ADOCK 05000309 P
~
lt l
l 9.
RECORDS l
l The Plant Operation Review Committee shall maintain written minutes of each
(
meeting and copies shall be provided to the Manager of Operations and Chairman of the Nuclear Safety Audit and Review Committee.
5.5.B.
NUCLEAR SAFETY AUDIT AND REVIEW COMMITTEE l
1.
FUNCTION The Nuclear Safety Audit and Review (NSAR) Committee shall function to provide independent review and audit of all aspects of plant nuclear safety.
Adequacy of this review and audit is assured by the cross section of disciplines required of the Committee membership as described in Specification 5.5.B 3. The Committee shall report to the President. Maine Yankee.
2.
COMPOSITION The NSAR Committee shall be composed of at least six persons with the committee membership and its Chairman and Vice Chairman appointed by the l
l President. Maine Yankee.
a.
Chairman l
b.
Vice Chairman l-l c.
At least four technically qualified persons who are not members of the i
plant staff.
1 3.
QUALIFICATION Membership to the NSAR Committee requires that an individual meet one of the below academic and/or experience requirements:
a.
Bachelor Degree or equivalent, plus five (5) years total experience in the below listed disciplines, b.
Nine (9) years total experience in the below listed disciplines.
(1) Nuclear Power Plant Operations (2) Nuclear Engineering l
(3) Chemistry and Radiochemistry (4) Mechanical and Electrical Engineering (5) Radiological Safety (6) Instrumentation and Control (7) Metallurgy l
(8) Quality Assurance Practices l
l Amendment No. 34, 39, 50, 77. 152 5.5 4 l
l
-~.
F 4.
ALTERNATES All NSAR Committee alternate members shall be appointed in writing by the l
President, Maine Yankee to serve on a temporary basis: however, no more than two. alternates shall participate as voting members in NSAR Committee activities at any one time.
l 5.
CONSULTANTS i
Consultants may be utilized as determ'ned by the NSAR Committee Chairman to provide expert advice, when needed, to the NSAR Committee.
l 6.
MEETING FREQUENCY I
The NSAR Committee shall meet at least once per six months. plus 25%.
I Special meetings may be held when deemed necessary by Company management or by the Chairman of the NSAR Committee, or, in the absence of the chairman, by i
the Vice Chairman.
t l
7.
QUORUM i
A quorum of the NSAR shall consist of the Chairman or his designated alternate and at least 4 NSAR members, including alternates. No'more than I
a minority of the quorum shall have line responsibility for operation of the j
facility.
i t-f 8.
REVIEW RESPONSIBILITIES i
i The NSAR Committee shall review:
E l
a.
The Safety Evaluations.for (1) changes to equipment or-systems and'(2) tests or experiments completed under_ the provisions 'of Section 50.59, L
10 CFR, to verify that such actions did not constitute an unreviewed j.
safety question.
I b.
Proposed Changes to procedures, equipment or systems which involve an unreviewed safety question as defined in Section 50.59, 10 CFR.
c.
Proposed test or experiment which involve an unreviewed safety question l
as defined in Section 50.59, 10 CFR.
L d.
Proposed Changes to Technical Specifications or this Operating License.
l
[
e.
Violations of codes, regulations, orders,. Technical Specifications, l
license requirements, or of internal procedures or instructions having j
nuclear safety significance.
i f.
Significant operating abnormalities 'or deviations from normal and l
expected performance of plant equipment that affect nuclear safety.
i o
Amendment No. 34, 50, 77 5.5 5
g.
All reportable events.
h.
Reports and meeting minutes of the Plant Operation Review Committee.
-1.
Perform 'special reviews and investigations and render reports thereon
-l as requested by the President, Maine Yankee or his delegated alternate.
j.
Significant accidental, unplanned, or uncontrolled radioactive releases, 1
a including corrective action to prevent recurrence.
I i
9.
AUDIT RESPONSIBILITIES i
i 1
Audits of facility activities shall be performed under the cognizance of the
.NSAR Committee.
These audits shall encompass:
l.
a.
The conformance of facility operation to provisions contained within the Technical Specifications and applicable license conditions at least i
.Once per 12 months.
l b.
The performance. training and qualification of those members of the l
~
facility staff who have a direct relationship to operation, maintenance or technical aspects of the plant, at least once per 12 months.
I c.
The results of actions taken to correct deficiencies occurring in f
facility equipment, structures, systems or ' method of operation.that i
affect nuclear safety at least once per 6 months.
l d.
The performance 'of activities required by the Operational Quality j
Assurance Program to meet the criteria of Appendix "B", 10 CFR 50, at 1
least once per 24 months.
j e.
Not used.
l
- f.
Not used.
g.
The Facility Fire Protection Program and implementing procedures at-1 L
least once per 24 months.
~
i h.
An independent fire protection and loss prevention inspection and audit.
shall be performed at least once per 12 months utilizing either qualified offsite licensee personnel or an outside fire protection firm.
i 1.
An inspection and audit of the fire ' protection. and loss prevention program shall be performed by an outside qualified fire consultant at intervals no greater than 3 years.
h 4
j, The Offsite Dose Calculation Manual and its implementing procedures at l
Lleast once per 24 months.
jj
' Amendment No. 34, 50, 69,.77,-79, 152:
'5.5 6 l
~
i.,.,-,.-
_ _.. _. _.. = _ _. _. _.... _ _.
i i
k.
The Process Control Program and its implementing procedures at least once per 24 months.
1.
Any other area of facility operation considered appropriate by the NSAR j
l Committee, or President, Maine Yankes.
l~
10.
AUTHORITY The NSAR Committee shall report to the President, Maine Yankee and advise the l
- President, Maine Yankee on those areas of responsibility specified in Section l
5.5.B 8 and 5.5.B.9.
1 11.
RECORDS l
Records of NSAR activities shall be prepared, approved and distributed as indicated below:
a.
Minutes of each NSAR meeting shall be prepared, and forwarded to the l
l President, Maine Yankee within 20 working days following. such a
meeting.
j l
b.
Reports of reviews encompassed by. Section 5.5.B.8 ebove. - shall be l.
prepared, and forwarded to the President. Maine Yankee within 20 working l.
L days following completion of the review.
c.
Audit reportr, encompassed by Section 5.5.B.9 above, shall be forwarded to the management positions responsible for the areas audited within 30 l
working days after completion ~ of the audit, i