Proposed Tech Specs,Deleting Offsite & Facility Organization Charts,Figures 5.2-1 & 5.2-2ML20206C290 |
Person / Time |
---|
Site: |
Maine Yankee |
---|
Issue date: |
10/26/1988 |
---|
From: |
Maine Yankee |
---|
To: |
|
---|
Shared Package |
---|
ML20206C259 |
List: |
---|
References |
---|
NUDOCS 8811160206 |
Download: ML20206C290 (2) |
|
Similar Documents at Maine Yankee |
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20236T4781998-07-14014 July 1998 Proposed Tech Specs Revising Liquid & Gaseous Release Rate Limits to Reflect Replacement of Former 10CFR20.106 Requirements W/Existing 10CFR20.1302 Requirements ML20216F8951998-04-13013 April 1998 Proposed Tech Specs Re Fuel Storage Pool Water Level ML20216E1841998-03-10010 March 1998 Updated TS Pages 5-8 Through 5-14,which Includes Specifications Relating to Cold Weather Operations & Spent Fuel Pool Water Chemistry ML20202H5041998-02-10010 February 1998 Proposed Tech Specs Page 5-8,including Specification Re Cold Weather Operations ML20212A6211997-10-20020 October 1997 Proposed Tech Specs Re Permanently Defueled Status of Plant ML20210M5871997-08-15015 August 1997 Proposed Tech Specs Revising Facility Staffing & Training Requirements ML20137S8891997-04-0808 April 1997 Proposed Tech Specs Reducing RCS Flow ML20136B5261997-03-0505 March 1997 Proposed Tech Specs,Requesting Approval of Alternative Sleeving Repair Process for SG Tubes at Plant ML20134J6641997-02-0707 February 1997 Proposed Tech Specs Pages 3.12-1,3.12-2 & 3.12-3 Re 115 Kv Offsite Power Requirements ML20134J6311997-02-0707 February 1997 Proposed Tech Specs 4.10.C.2 Re SG Tube Surveillance Requirements ML20133N0471997-01-15015 January 1997 Proposed Tech Specs 4.4 Re Containment Testing ML20133A7131996-12-19019 December 1996 Proposed Tech Specs 3.13 Re Refueling & Fuel Consolidation Operations & Table 4.2-1 Re Minimum Frequencies for Sampling Tests ML20129F8831996-09-25025 September 1996 Proposed Tech Specs Re Organization Change Affecting Nuclear Safety Audit & Review Committee ML20127P2471993-01-25025 January 1993 Proposed Tech Specs Change 177 Re Main Yankee Spent Fuel Pool Reracking ML20126B6911992-12-15015 December 1992 Proposed TS 3.19 Re Position Restrictions on Loop Isolation Valves,Safety Injection Header Isolation Valves & Safety Injection Tank Isolation Valves ML20198D0771992-05-0808 May 1992 Proposed Tech Spec 1.4.D, Containment Purge Sys ML20141M1181992-03-24024 March 1992 Proposed TS Spec 1.3 Re Fuel Enrichment Limit in Reactor Core ML20062D2851990-11-0505 November 1990 Proposed Tech Specs Re Removal of cycle-specific Operating Limits ML20058B6071990-10-15015 October 1990 Proposed Tech Specs Modifying 3.22, Feedwater Trip Sys, by Adding Exception Specifically Addressing Operation of Emergency Feedwater Sys During Plant Startups & Shutdowns ML20058L9311990-07-30030 July 1990 Proposed Tech Spec Page 5.2-2 Re Manager Qualification for Operations ML20055G3121990-07-10010 July 1990 Proposed Tech Specs Consisting of Proposed Change 155 Re Safety Injection Actuation Sys ML20055E0981990-07-0505 July 1990 Proposed Tech Specs Re Qualification Requirements for Operations Manager ML20235H5581989-02-15015 February 1989 Proposed Tech Specs,Adding Primary Inventory Trend Sys for Reactor Vessel Level Indication & Core Exit Thermocouples Channel Operability & Surveillance Requirements to Sections 3.9 & 4.1 ML20196B5301988-11-22022 November 1988 Proposed Tech Specs Supporting Change 134 Re Main Steam Excess Flow Check Valve & Turbine Valve Testing Frequency ML20206F2341988-11-0808 November 1988 Proposed Tech Spec 1.1, Fuel Storage ML20206C2901988-10-26026 October 1988 Proposed Tech Specs,Deleting Offsite & Facility Organization Charts,Figures 5.2-1 & 5.2-2 ML20205M9751988-10-18018 October 1988 Proposed Tech Specs,Modifying Specified Surveillance Interval for Control Element Assembly Partial Movement Test Frequency,Per C-E STS ML20207E2611988-08-0202 August 1988 Errata to Proposed Tech Specs Figure 3.10-4,showing Allowable Unrodded Radial Peak as Function of Cycle Average Burnup for Cycle 11 Operation ML20150E9021988-06-30030 June 1988 Proposed Tech Specs,Consisting of Proposed Change 141,to Reflect Operating Parameters for Cycle 11 ML20150G0531988-03-28028 March 1988 Proposed Tech Specs,Increasing Max Nominal Fuel Enrichment from 3.5% to 3.7% U-235 ML20147G9011988-03-0101 March 1988 Proposed Tech Specs Reflecting Successional Change in Offsite Corporate Organization & Associated Changes in Functional Reporting Structure ML20235A8321988-01-0606 January 1988 Proposed Tech Specs,Revising Offsite & Facility Organizational Charts ML20236G5111987-07-30030 July 1987 Proposed Tech Specs,Consisting of Proposed Change 132, Replacing Page 3.10-4 Re Incore Monitoring Sys ML20216B8871987-06-23023 June 1987 Revised Tech Spec Page 5.8-2 Re Process Control Program ML20212D9851987-02-24024 February 1987 Proposed Tech Specs 5.9.1.6 & 5.9.1.7,allowing Addl Time for Filing of Supplemental Dose & Meteorological Summary Repts & Ensuring That Spec Refs Consistent W/Current Tech Specs, Respectively ML20212K9901987-02-24024 February 1987 Proposed Tech Spec Change 130,reflecting Revised LOCA Limits ML20212L1581987-01-13013 January 1987 Proposed Tech Specs Re RCS Emergency Vent Sys ML20207P5301987-01-12012 January 1987 Proposed Tech Spec Pages 2.2-1,3.10-9,3.10-12 & 3.10-13,re Reactor Core Safety Limits & Power Dependent Insertion Limit,Supporting Proposed Change 128 for Cycle 10 Operation ML20215C2431986-12-0808 December 1986 Proposed Tech Specs Re Limiting Overtime of Staff Personnel ML20212C0281986-07-29029 July 1986 Proposed Tech Specs Re Reporting Requirements for Primary Coolant Sys Iodine Spikes ML20203F1331986-07-16016 July 1986 Proposed Tech Specs Removing Cycle Reload Specific Parameters ML20203Q3181986-05-0505 May 1986 Proposed Tech Specs,Incorporating Proposed Change 122, Substituting Table 4.2-2, Min Frequencies for Equipment Tests, for Existing Table Re Turbine Valve Test Frequencies ML20204A3841986-05-0101 May 1986 Revised Tech Spec 3.11.5,adding Five Manual Isolation Valves of post-accident Hydrogen Purge & Analysis Sys to List of Manual Containment Isolation Valves That May Be Repositioned W/O Implementing Compensatory Measures ML20151U4741986-02-0303 February 1986 Proposed Tech Spec,Adding Administrative Controls on Limiting Overtime of Personnel & Removing Offsite & Onsite Organizational Charts from Tech Spec 5.2 ML20137Q9061986-01-29029 January 1986 Proposed Tech Spec Change 115, Adopting Model for LER Reporting Requirements Re Iodine Spikes in Primary Coolant, Per Generic Ltr 85-19 ML20138M5971985-12-16016 December 1985 Proposed Tech Specs,Incorporating Limiting Condition for Operations for turbine-driven Auxiliary Feedwater Pump ML20138P6361985-12-13013 December 1985 Suppl 1 to Proposed Change 110 Revising Tech Spec Pages 4.6-1,4.6-3 Through 4.6-6 & 4.1-9 Re Emergency Feedwater Sys ML20138J3341985-12-0909 December 1985 Proposed Tech Spec Change 118,allowing Consideration of Fire Hazards in Vicinity of Affected Penetration When Determining Level of Compensatory Fire Protection ML20133K5791985-10-16016 October 1985 Proposed Tech Spec,Deleting Present Requirement for Emergency Diesel Generator Testing in Event That Any Component in One Train of Cooling Sys Becomes Inoperable ML20133F4341985-10-0707 October 1985 Proposed Change 114,Suppl 1,revising Tech Spec Pages 3.11-2 & 3.11-5 Re Containment Isolation Valves Under Administrative Controls 1998-07-14
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20210M8251999-08-0303 August 1999 Draft License Termination/Amend Plan for Maine Yankee Atomic Power Co ML20206D7981998-11-10010 November 1998 Revised Maine Yankee Odcm ML20237D0671998-08-19019 August 1998 Rev 1 to Maine Yankee Certified Fuel Handler Training & Retraining Program ML20236T4781998-07-14014 July 1998 Proposed Tech Specs Revising Liquid & Gaseous Release Rate Limits to Reflect Replacement of Former 10CFR20.106 Requirements W/Existing 10CFR20.1302 Requirements ML20216F8951998-04-13013 April 1998 Proposed Tech Specs Re Fuel Storage Pool Water Level ML20216E1841998-03-10010 March 1998 Updated TS Pages 5-8 Through 5-14,which Includes Specifications Relating to Cold Weather Operations & Spent Fuel Pool Water Chemistry ML20202H5041998-02-10010 February 1998 Proposed Tech Specs Page 5-8,including Specification Re Cold Weather Operations ML20212A6211997-10-20020 October 1997 Proposed Tech Specs Re Permanently Defueled Status of Plant ML20210M5871997-08-15015 August 1997 Proposed Tech Specs Revising Facility Staffing & Training Requirements ML20210L9601997-08-15015 August 1997 Certified Fuel Handler Training & Retraining Program ML20137S8891997-04-0808 April 1997 Proposed Tech Specs Reducing RCS Flow ML20135F7261997-03-0707 March 1997 Restart Readiness Plan ML20136B5261997-03-0505 March 1997 Proposed Tech Specs,Requesting Approval of Alternative Sleeving Repair Process for SG Tubes at Plant ML20134J6641997-02-0707 February 1997 Proposed Tech Specs Pages 3.12-1,3.12-2 & 3.12-3 Re 115 Kv Offsite Power Requirements ML20134J6311997-02-0707 February 1997 Proposed Tech Specs 4.10.C.2 Re SG Tube Surveillance Requirements ML20133N0471997-01-15015 January 1997 Proposed Tech Specs 4.4 Re Containment Testing ML20133G3281996-12-23023 December 1996 Cycle 15 Startup Test Rept Suppl 5 ML20133A7131996-12-19019 December 1996 Proposed Tech Specs 3.13 Re Refueling & Fuel Consolidation Operations & Table 4.2-1 Re Minimum Frequencies for Sampling Tests ML20129F8831996-09-25025 September 1996 Proposed Tech Specs Re Organization Change Affecting Nuclear Safety Audit & Review Committee ML20138F4031996-04-11011 April 1996 Revised Maine Yankee Odcm ML20148C6511994-12-31031 December 1994 Diagnostic Evaluation Team Managers Handbook,Dec 1994, Rev 1 ML20148C6581994-12-31031 December 1994 Guidelines for Diagnostic Evaluation,Dec 1994,Rev 4 ML20128D6761993-01-28028 January 1993 Co ISI Program for Third ISI Interval 921228-021228 ML20127P2471993-01-25025 January 1993 Proposed Tech Specs Change 177 Re Main Yankee Spent Fuel Pool Reracking ML20126B6911992-12-15015 December 1992 Proposed TS 3.19 Re Position Restrictions on Loop Isolation Valves,Safety Injection Header Isolation Valves & Safety Injection Tank Isolation Valves ML20198D0771992-05-0808 May 1992 Proposed Tech Spec 1.4.D, Containment Purge Sys ML20141M1181992-03-24024 March 1992 Proposed TS Spec 1.3 Re Fuel Enrichment Limit in Reactor Core ML20062D2851990-11-0505 November 1990 Proposed Tech Specs Re Removal of cycle-specific Operating Limits ML20058B6071990-10-15015 October 1990 Proposed Tech Specs Modifying 3.22, Feedwater Trip Sys, by Adding Exception Specifically Addressing Operation of Emergency Feedwater Sys During Plant Startups & Shutdowns ML20059N7671990-10-0101 October 1990 Cycle 12 Startup Test Rept ML20058L9311990-07-30030 July 1990 Proposed Tech Spec Page 5.2-2 Re Manager Qualification for Operations ML20055G3121990-07-10010 July 1990 Proposed Tech Specs Consisting of Proposed Change 155 Re Safety Injection Actuation Sys ML20055E0981990-07-0505 July 1990 Proposed Tech Specs Re Qualification Requirements for Operations Manager ML20055D4651990-02-20020 February 1990 Rev 3 to Procedure 0-07-1, Matl Receipt ML20055D4691989-08-15015 August 1989 Rev 4 to Procedure 0-15-1, Nonconformance Repts (Ncr) ML20235H5581989-02-15015 February 1989 Proposed Tech Specs,Adding Primary Inventory Trend Sys for Reactor Vessel Level Indication & Core Exit Thermocouples Channel Operability & Surveillance Requirements to Sections 3.9 & 4.1 ML20196B5301988-11-22022 November 1988 Proposed Tech Specs Supporting Change 134 Re Main Steam Excess Flow Check Valve & Turbine Valve Testing Frequency ML20206F2341988-11-0808 November 1988 Proposed Tech Spec 1.1, Fuel Storage ML20246H5281988-10-31031 October 1988 Reactor Containment Bldg Integrated Leak Rate Test for Oct 1988 ML20206C2901988-10-26026 October 1988 Proposed Tech Specs,Deleting Offsite & Facility Organization Charts,Figures 5.2-1 & 5.2-2 ML20205M9751988-10-18018 October 1988 Proposed Tech Specs,Modifying Specified Surveillance Interval for Control Element Assembly Partial Movement Test Frequency,Per C-E STS ML20204G1191988-08-31031 August 1988 Rev 1 to Procedure 26.1, Offsite Dose Calculation Manual ML20207E2611988-08-0202 August 1988 Errata to Proposed Tech Specs Figure 3.10-4,showing Allowable Unrodded Radial Peak as Function of Cycle Average Burnup for Cycle 11 Operation ML20150E9021988-06-30030 June 1988 Proposed Tech Specs,Consisting of Proposed Change 141,to Reflect Operating Parameters for Cycle 11 ML20150G0531988-03-28028 March 1988 Proposed Tech Specs,Increasing Max Nominal Fuel Enrichment from 3.5% to 3.7% U-235 ML20147G9011988-03-0101 March 1988 Proposed Tech Specs Reflecting Successional Change in Offsite Corporate Organization & Associated Changes in Functional Reporting Structure ML20155D3801988-02-0101 February 1988 Rev 3 to Procedure 18-340-1, Maine Yankee Simulator Work Order ML20235A8321988-01-0606 January 1988 Proposed Tech Specs,Revising Offsite & Facility Organizational Charts ML20237G2191987-08-10010 August 1987 Co Simulator Certification Test Plan ML20236G5111987-07-30030 July 1987 Proposed Tech Specs,Consisting of Proposed Change 132, Replacing Page 3.10-4 Re Incore Monitoring Sys 1999-08-03
[Table view] |
Text
..
MaineYankee 1
52 QRGANIZATl0ff 5.2.1 Onsite and Offsite Organization ]
An onsite and an offsite organization shall be established for unit ]
operation and corporate management. The onsite and offsite ]
organization shall include the positions for activities affecting ]
the safety of the nuclear power plant. ]
- a. Lines of authority, responsibility and communication shall be ]
established and defined from the highest management levels ]
through intermediate levels to and including all operating ] 1 organization functions. Those relationships shall be documented ) :
and updated, as appropriate, in the form of organizational charts. ] !
These organizational charts will be documented in the FSAR. ]
- b. The President shall have corporate responsibility for overall ]
plant nuclear safety and take prudent measures to ensure ] ,
acceptable performance of the staff in operating, maintaining, )
and providing technical support to the plant to maintain ]
safe operation. ]
(
- c. The Plant Manager shall have direct responsibility for overall unit ]
safe operation and shall have control over those onsite resources ]
necessary for safe operation and maintenance of the plant. ]
- d. The individuals who train the operating staff and those who carry ]
out radiation protection and quality assurance functions shall have ]
sufficient organizational freedom to ensure their independence from ]
direct operating responsibilities. ]
5.2.2 Eard1Ltv Staff
- a. Each on duty shift shall be composed of at least the minimum shif t crew composition shown in Table 5.2-1.
l b. At least one licensed Senior Operator who is assigned i responsibility for overall plant operation shall be on site when
, fuel is in the reactor.
l ,
I c. At least two licensed Operators, one of which must be a licensed '
senior Reactor Operator, shall be present in the control room i whenever the plant is in an operational mode other than cold !
shutdown or lower condition. -
5.2-1 10/26/88
$$M$$$0kbb @9 i P
i 0154L-SDE ;
T .
MaineYankee
- d. An individual qualified in radiation protection procedures shall be on site when fuel is in the reactor.
- e. A'1 CORE ALTERATIONS shall be directly supervised by either a licensed Senior Reactor Operator or licensed Senior Reactor Operator Limited to Fuel Handling who has no other concurrent responsibilities during this operation.
- f. A fire brigade of at least 5 members shall be maintained on site at all times. This excludes the two members of the shift crew necessary for the safe shutdown of the plant and any personnel ,
required for other essential functions during a fire emergency.
- g. A Shift Technical Advisor, or a combined Senior Reactor Operator / Shift Technical Advisor (SRO/STA) shall be available on site whenever the plant is in the Transthermal (Condition 4) or Higher Operating Condition (Condition 5, 6 or 7). A licensed Senior Reactor Operator (SRO) from the minimum operating shift crew, or any other SRO, who meets the qualification requirements for an SRO/STA, may fulfill the SR0/STA function. ;
- h. The Manager, Operations Department and Plant Shift Superintendents ]
shall hold a Senior Reactor Operator (SRO) license. Shift Operating )
Supervisors and Control Room Operators shall hold a Reactor Operator ]
(RO) Ilcense. ] ,
- 1. Personnel requiremends of a, d, f ar.d g above may be less than the minimum specified for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in order to accomodate unexpected absence of on-duty personnel provided immediate action is taken to restore to within the minimum requirements specified.
I I
l 5.2-2 10/26/88 l
l 01S4L-SOE