ML20215C243
| ML20215C243 | |
| Person / Time | |
|---|---|
| Site: | Maine Yankee |
| Issue date: | 12/08/1986 |
| From: | Maine Yankee |
| To: | |
| Shared Package | |
| ML20215C233 | List: |
| References | |
| 8245L-SDE, NUDOCS 8612150075 | |
| Download: ML20215C243 (1) | |
Text
e.ww, c Mgm My y
p _ Mit
't 4 y.
' ; /~,
n_.
1
' ~
, - ' n-m 7 W
+
~ '
fl0\\hh a' '
~l' l M l
Y 4A -
y vm, $u p74
_- 4
,.e m,d
~.i m ; % - j ijs (W
,n
.o'_
s
- u. y y,
.,e 7" ~
e
+.
s 2
i b
E J
gi a, '.
e1
~y; ar e
j
.3 3 u_-.
g
_s
,r s
.. W GY w
- p s _.
's
+
e.y(
MOCENRES',
J
~~
e
~
w
.+.
- 7
,. z
.t 15.8.1
! Written' procedures shall be established.: implemented'and maintained-Q.2 o covering:thefactivities referenced-below p jq y
~
17
[a.o 1Thelapplicable procedures 2 recommended in Appendix "A" of; iRegulatory Guide 1.33,[ November,71972.
rt t,f*
',, y : Refueling' operations.3
+
ag, A ic.
Surveillance and_ test activities of' safety related equipment.
w Nc Ed.
fSecurity PlanTimplementation.
P n4 -
m e.= gEmergency; Plan' implementation.-
T if.
Fire Protection Program. implementation.
~ -
t, F([
))-
o 1s f0:
5.8.2 :
'Each procedureiof;5.8.1 above, and' changes thereto, shall be reviewed-
..? y t e_ ORC and approved by.the Plant Manager prior to implomentation, I
b?h P g
' and reviewed-periodically as set forth in administrative procedures.-
Ji' 18.3}
Temporary changes,to procedures.of 5.8.1 above'may be made provided:'
a.
The. intent of 'the original procedures is' not altered.
.b.-
The change is approved by'two members of the plant management 7
staff,Lat least one'who holds a Senior Reactor Operator's
. License;
-c.
The change is.~ documented reviewed by the PORC and approved by the Plant Manager'within 14' days of implementation.-
5.8.41
'Admidistrative procedures shall be established to limit the working
))
hours of plant staff who perform safety-related functions,
))
specifically, licensed senior operators, licensed operators, auxiliary.
))
operators, radiological' controls' technicians, and key maintenance
))
personnel, or any personnel temporarily assigned to these positions.
))]
The procedures will require the following guidelines to be used in the
))
j R
event that unforseen problems require substantial amounts of overtime
))
to be used, or during extended periods of shutdown for refueling, major
))
. maintenance or major plant modifications, on a temporary basis.
))
1.
LAn individual should not be permitted to work more than 16
))
i continuous hours, excluding shift turnover time;
))
[.
2..
An individual should not be permitted to work more than 16
))
hours in any 24-hour period, nor more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in any
))
L. y 48-hour period, nor more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any 7-day period,
))
all excluding shift turnover time.
))
+
g,
- 4 3.
A break of at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> should be allowed between work
))
I-periods, including shift turnover time; and
))
4.
Except during extended shutdown periods, the use of overtime
.))
l should be considered on an individual basis and not for the
))
l:
entire staff on a shift.
))
[
l The procedures will require that any deviation from the above
))
I) guidelines be authorized by the Plant Manager or.his designee,
))
or higher levels of management.
))
Ihk 309 5.8-1
.12/08/86 c
p PDR B
=
-