IR 05000443/1988001

From kanterella
Revision as of 00:51, 16 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Exam Rept 50-443/88-01OL on 880105.Exam Results:Reactor Operator Candidate Passed Exam
ML20196H644
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 02/24/1988
From: Eselgroth P, Norris B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20196H642 List:
References
50-443-88-01OL, 50-443-88-1OL, NUDOCS 8803140006
Download: ML20196H644 (2)


Text

. ..

.- -

-

-

.. ..

...

U. S. NUCLEAR REGULATORY COMMISSION REGION I OPERATOR LICENSING EXAMINATION REPORT EXAMINATION REPORT NO. 88-01(0L)

FACILITY DOCKET NO. 50-443 FACILITY: LICENSE NO. NFP-56 LICENSEE: Public Service of New Hampshire

>

P. O. Box 330 Manchester, New Hampshire 03105 FACILITY: Seabrook Station EXAMINATION DATE: January 5,1988

,,

CHIEF EXAMINER: ,d/M ffMf 'Date 4.Nopls,SeniorOp ations Engineer APPROVED BY:

P. Eselgr f 2 f/8

, Chief' / Da'te

PWR Oper - ons Section SUMMARY: An operating examination was administered to one reactor operator

.

(RO) candidate. The candidate passed the examination.

I l

l

[

,

I l

!

l l

'

>

!

8803140006 880229 3 PDR ADOCK 0500 4

[

l - . - . . _ - - - - - - - . - . = - -

.

. ,. -

-

..

.

. .E , , .

-

DETAILS TYPE OF EXAMINATION: Retake EXAMINATION RESULTS:

1 R0 l l Pass / Fail l l l l l 1

[ Operating Examl 1/0 l l l l l l l l Written Exam l Waived l l 1 1 I I I 10verall i 1/0 1 I I I Reference a: Requalification Examination Report No. S0-443/87-17 (0L) CHIEF EXAMINER AT SITE: W. S. Roesener (EG&G)

- OTHER EXAMINERS: P. Wallace, USNRC (Trainee)

'

.

3. . DEFICIENCY NOTED DURING OPERATING EXAM:

-

Control of power changes with a positive MTC (Beginning-of-Life) as previously noted in Reference a. remains a generic weakness. The Training Staff assisting with the simulator exercise,as operators j did not initially know how to control the plant in this situation 4 PERSONNEL PRESENT AT EXIT INTERVIEW:

NRC Contractor Personnel W. S. Roesener (EG&G), Examiner Facility Personnel Steve Bass Training Laurits Carlsen Operations Training Supervisor Joseph Grillo Assistant Operations Manager Robert Hanley Operations Training Managers Larry Walsh Operations Manager SUMMARY OF COMMENTS MADE AT THE EXIT INTERVIEW: Simulat'r infidelity noted during the oral exams given in July 1987 (Reference a), were noted as still being presen OFFICIAL RECORD COPY OL SEABROOK 88-01 - 0004. /29/88