ML20198A070

From kanterella
Revision as of 00:44, 23 November 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Provides Contract Costs Incurred & man-hours Used in Review of 820716 Application for License
ML20198A070
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/22/1985
From: Brown R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Miller W
NRC OFFICE OF ADMINISTRATION (ADM)
Shared Package
ML17278A391 List:
References
CON-WNP-0819, CON-WNP-819 NUDOCS 8509180449
Download: ML20198A070 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

i 01/22/85 DOCKET NO. 07002950 YYId f CA~

MEMORANDUM FOR: WILLIAM 0. MILLER, CHIEF LICENSE FEE MANAGEMENT BRANCH OFFICE OF ADMINISTRATION FROM: R.S. BROWN JR., DIRECTOR PLANNING AND PROGRAM ANALYSIS STAFF OFFICE OF NUCLEAR MATERIALS SAFETY AND SAFEGUARDS

SUBJECT:

COSTS AND MANHOURS FOR LICENSING ACTION THE CONTRACT COSTS INCURRED AND MANHOURS USED IN REVIEWING THE APPLI-CATION DATED 07/16/82 ARE TABULATED BELOW FOR LICENSE NO.

1. NAME: WASHINGTON PUBLIC POWER SUPPLY P.O. BOX 968, 3000 GEORGE WASH RICHLAND, WA. 99352
2. A) CASEWORK CONTROL NO. 07002950760V B) MAIL CONTROL NO.

C) TAC NO.

3.

A) PERIOD COVERED (STAFF HOURS) 07/16/82 - 08/17/82 B) COMPLETION DATE: 08/17/82 C) AMENDMENT NO.

4.

CONTRACT COSTS ASSOCIATED WITH THIS APPLICATION: $ 0' PERIOD COVERED (CONTRACT COSTS)

5. TAC WORK BY OTHER OFFICES: 0 HOURS
6. HOURS DURING REPORTING PERIOD: 36.0
7. FEE CHARGABLE : $ 1368 "

/

8. TOTAL COST TO PROCESS APPLICATION : $ 1368 I l i xn J p a ggg gi8a.t,7 3 R.S. BR0wN Ja., es4ECr0R g eL_1Ne-P7 RAM

_ LYSIS STA,,. NMeS

. T.

RUN' DATE -

  • REGULATORY INFORMATION TRACKING SYSTEM PAGE 12/12/84 DETAIL LISTING OF HOURS REPORTED ON CASEWORK 117 PERIOD COVERED: 07/16/82 - 08/17/82 PROJECT MANAGER: OF SMITH CASEWORK NUMBER: 07002950760V FACILITY NAME: WASHINGTON PUBLIC POWER SUPPLY DATE CLOSED: 08/17/82 NATURE OF ACTIVITY:

SEC PLAN FOR NEW FRESH FUEL STOR-REV 2 REGULAR REVIEWER WEEK ENDING HOURS THE FOLLOWING WERE CALCULATED AT : 38 $ PER HOUR CJ ROSS0 MONDO 07/31/82 12.0 CJ ROSS0 MONDO 08/07/82 15.0 CJ ROSS0 MONDO 08/14/82 9.0 S e. >

i I

l l

l l

l

_ _ _ ___