4 Docket File 50 388 397 CJHolloway i
j R4Diggs DWeiss i4anpower File SEP 1119%
LFMB R/F Docket No. 50-397 ilEMORNtDUit FOR:
Files THRU:
William O. Miller, Chief License Fee Management Branch, Afst FRGl:
C. James Holloway, Jr., Assistant Chief License Fee Management Branch, ADM SU.sdECT:
UNP-2 CPERATING LICEi!SE REVIEW COSTS On December 20, 1983, the Commission issued a five percent power license for WiiP-2. The license was amended on April 13, 1984, for full (100%)
power operation.
In this particular instance, the ilarch 23, 1978 fee schedule was in effect at the time the operating license was issued.
In accorcance with Footnote 3 of Part 170.21, we have reviewed the cost incurred by the various program offices directly involved in the processing and issuance of the Wi!P-2 operating license. Attached is a sumary of the review costs as well as the supporting documentation from the program offices.
The attacment shows that a total of 54,105,901 was expended for the review. Since the maximum fee ($1,024,500) prescribed by regulation for the custom review under Section 170.21.A has been paid, no additional operating license fee is required.
?.
C. James Holloway, Jr., Assistant Chief License Fee Management Branch Office of Administration
Enclosure:
Summary of costs to supporting documentation 8509180414 850911 Xk cr ADOCK 050003 P,(g <g
>oa
/CF ec4
(
-.-.y'
~~~n_
~ - ~ ~
LFMB:ADM LR4B: ADM CJ way:Jp WOMiller 9/ */85 9/
/85
DISTR?BUTION w/e b b :
1 Docket File SOM 397 CJHolloway
(
R4Diggs DWeiss Manpower File SEP 111985 LFMB R/F Docket No. 50-397 MEMORANDUit FOR:
Files THRU:
William 0. Miller, Chief License Fee Management Branch, ADM FRGl:
C. James Holloway, Jr., Assistant Chief License Fee Management Branch, ADM SUJJECT:
WiiP-2 OPERATING LICEi!SE REVIEW COSTS On December 20, 1983, the Commission issued a five percent power license for WiiP-2. The license was amended on April 13, 1984, for full (100%)
power operation.
In this particular instance, the March 23, 1978 fee schedule was in effect at the time the operating license was issued.
In accordance with Footnote 3 of Part 170.21, we have revieved the cost incurred by the various program offices directly involved in the processing and issuance of the WilP-2 operating license. Attached is a summary of the review costs as well as the supporting documentation from the program offices.
The attacnment shows that a total of 54,105,901 was expended for the review. Since the maximum fee ($1,024,500) prescribed by regulation for the custom review under Section 170.21.A has been paid, no additional operating license fee is required.
't.
- ,,a,......
C. James Holloway, Jr., Assistant Chief License Fee Management Branch Office of Administration i
Enclosure:
Summary of costs to supporting documentation 3509180414 850911 Xk l
@E' ADOCK 050003 g }
'o(L
/
PC4 e LFMB:ADM LFMB:ADM CJ way:jp WOMiller 9/ */85 9/
/85
Washington Public Power Supply System Operating License Review Costs Through April 13, 1984 FACILITY:
Wi4P-2 DOCKET N0.:
50-397 Costs Per Professional Program Office Professional Staff-hours Staff-hour Contractual Total Review Staff-hour Expended Costs Costs Costs 1.
$39 45,433.9
$1,771,922 51,477,282 $3,249,204 2.
IE-HQ 36 834.0 30,024 30,024 3.
REGIONS 36 21,523.1 774,832 774,832 4.
ACRS 50 683.8 34,190 34,190 5.
HMSS 38 464.5 17,651 17,651 Total Cost: $4,105,901 l