Annual Operating Rept for 1987
ML20149G543
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 12/31/1987
From: Diederich G
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
2677R-0029R, 2677R-29R, NUDOCS 8802180302
Download: ML20149G543 (5)


Text

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

I. INTRODUCTION The LaSalle County Nuclear Power Station is a two-unit facility coned by Commonwealth Edison Company and located near Marseilles, Illinois. Units 1 and 2 are boiling water reactors with a designed net electrical output of 1078 megawatts. Waste heat is rejected to a man-made cooling pond using the Illinois River for make-up and blowdown. The architect-engineer '

was Sargent and Lundy and the primary construction contractor was Ccmonwealth Edison Company.

Unit I was issued operating license number NpF-ll on April 17, 1982.

Initial criticality was achieved on June 21, 1982 and commercial operation was commenced on January 1, 1984.

Unit 2 was issued operating license number NPF-18 on December 16, 1983.

Initial criticality was achieved on March 10, 1984 and commercial operation was commenced on June 19, 1984.

The primary purpose of the annual operating report is to permit annual evaluation by the NRC staff of operating and maintenunce experience throughout the Nuclear power Industry. This report provides a comprehensive summary of operating experience for the *, ear. References in the annual operating report of previous submitted reports for the year are clear and concise.

This report was compiled by Steven J. Samo11nski, telephone number (815)357-6761, extension 705.

g$$3e$ 2 $ '? I b3 i g cck &5$CO373 DOCUMENT ID 26'i7t/0029r -

g

  • l/

TABLE OF CCNTENTS I. INTRODUCTION II. ANNUAL REpCRTABLE DOCUMENTATION FCR UNITS 1 and 2 A. A narrative summary of operating experience during the report period relating to safe operation of the facility, including safety related maintenance.

B. Any outage or forced reduction in power over 20% of design power level, for more than four ? urs duration.

C. A tabulation of the number of personnel receiving exposure greater than 100 mrem /yr and associated man-rem exposure.

D. Any indications of failed fuel elements resulting from irradiated fuel examinations including eddy current, ultrasonic, or visual tests performed.

E. Summary of experiments or tests conducted which are not covered in the safety analysis report and which do not involve a change in the Technical Specificatons or an unreviewed safety question.

F. Summary of changes to procedures which are covered in the Safety Analysis Report.

G. Summary of ECCS outages.

H. Description of safety related modifications completed during the reporting period.

I. Summary of events violating Technical Specificaton 3.4.5 - primary coolant Iodine Spikes Exceeding Allowable Limits.

DOCUMENT ID 2677t/0029r

II. Annual Reportable Documentation for Units 1 and 2 A. Summary of Operattnq Experience This section has been reported monthly in LaSalle's NRC Monthly Reports (Sections II.A/II.B.4) dated January, 1987 through December, 1987.

B. Unit Outage or Power Reductions This section has been reported monthly in LaSalle's NRC Monthly Reports (Sections II.C/II.D.3) dated January, 1987 through December, 1987.

C. Radiation Exposure This information is reported annually for 1987 in the respective sections relating to numbers compiled for LaSalle Units 1 and 2, in the 10 CFR 20.407 annual report submitted under a different cover.

D. Indications of Failed Fuel Elements This section has been reported monthly in LaSalle's NRC Monthly Reports (Section II.E.5.) dated January, 1987 through December, 1987.

E. Tests and Experiments not covered in the Safety Analysis Report Information concerning tests and experiments not covered in the Safety Analysis Report has been reported monthly in LaSalle Station's NRC Monthly Reports (Section II.B.3.) dated January, 1987 through December, 1987.

F. Changes to procedures cevered in the Safety Analysis Report This information has been reported monthly in LaSalle Station's NRC Monthly Reports (Section II.B.2.) dated January,1987 through December, 1987.

G. Summary of ECCS Outages This information has been reported monthly in LaSalle Station's NRC Monthly Reports (Section II.E.2.) dated January, 1987 through December, 1987.

H. Summary of Safety Related Modifications A summary of Safety Related Modifications has been reported monthly in LaSalle Stations NRC Monthly Reports (Section II.B.5.) dated January, 1987 through December, 1987.

DOCUMENT ID 2677r/0029r I

O e .

I. Summary of events violating Technical Specification 3.4.5 - Primary o Coolant Iodine Spiking Exceeding Allowable Limits.

During this reporting period, January 1, 1987 through December 31, 1987, there were no violations of Technical Specification 3.4.5, Primary Coolant Iodine Spikes Exceeding Allowable Limits.

1 0

DOCUMENT ID 2677t/0029r

Commonwealth Edison

.aSalle County Nue: ear Stat:On

, ,1 , c.rai:0ute =1. Sex 220 Marsemes !IIee:s 61341 Te:e:rene 815/357 6761 February 6, 1988 Regicn !!!, USNRC Cffice of Inspection and Enfcreement 799 Roosevelt Road Glen Ellyn. !L 50137 Gentlemen:

Enclesed for your information is the ar.nual report covering LaSalle County Nuclear Feuer Station for the period covering Janua;y, 1987 through December, 1987 Very truly yours.

T a u n y/f 7

G. J. Diederich

[4 / Station Manager LaSalle County Station DCD/SJS/fdp Enclosure cc: NRC Director of Inspection and Enforcement, Washington, D.C.

NRC Direct 0r. Cffice of Management Information and Program Control, l

l Washingten, D.C.

I NRR Proj*ct Manager NRC Resident Inspector, LaSalle Station Licensing Manager - Ceco. D. Butterfield Director II. Dept. of Nuclear Safety Vice President. BVR Operations - CECO. D. Galle Genatal Manager, BVR - CECO, N. Kalivianakis I Central File

'1 l

<T'bLh

~~~

s/ g\.

l DCCJMENT ID 2677t/0029r