Annual Operating Rept for 1985
ML20154F835
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 12/31/1985
From: Diederich G
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
2277R, NUDOCS 8603070535
Download: ML20154F835 (11)


Text

_ ___ _ - _ _ _ . __ ._

TABLE OF CONTENTS I. INTRODUCTION II. ANNUAL REPORTABLE DOCUMENTATION FOR UNITS 1 and 2 A. A narrative summary of operating experience daring the report period relating to safe operation of the facility, including safety related r2intenance.

B. Any outage or forced reduction in power over 20% of design power level, for more than four hours duration.

C. Provide a tabulation of the number of personnel receiving exposure greater than 100 mrom/yr and associated man-rem exposure.

D. Any indications of failed fuel elements resulting from irradiated >

fuel examinations includinj eddy current, ultrasonic, or visual tests performed.

E. Provide a summary of tests and experiments requiring NRC approval.

F. Provide a summary of ECCS outages in the past year.

O. Provide an annual review and list with a synopsis of all safety related modifications completed in the past year.

i i

j 0603070535 051231 PDR ADOCK 05000373 R PDR Q

/y6? g}

l DOCUMENT 2277r l i

'I . JNTRODUCTION The LaSalle County Nuclear Power Station is a two-unit facility owned by Commonwealth Edison Company and located near Marseilles, Illinois. Units 1 and 2 are boiling water reactors with a designed net electrical output of 1078 meggawatts. Waste heat is rejected to a man-made cooling pond using the Illinois River for make-up and blowdown. The architect-engineer Was Sargent and Lundy and the primary Construction Contractor Was commonwealth Edison Company.

Unit 1 was issued operating license number NPF-11 on April 17, 1982.

Initial criticality was achieved on June 21, 1982 and commercial operation was commenced on January 1, 1984.

Unit 2 was issued operating license number NPF-18 on December 16, 1983.

Initial criticality was achieved on March 10, 1984 and commercial operation was commenced on June 19, 1984.

The primary purpose of the annual operating report is to permit annual evaluation by the NRC staff of operating and maintenance experience throughout the Nuclear Power Industry. This report should provide a comprehensive summary of operating experience, even though some repetition of previously reported information may be involved. References in the annual operating report of previous submitted reports should be clear and concise.

This report was compiled by James p. Peters, telephone number (815)357-6761, extension 325.

DOCUMENT 2277r

II. Annu:1 R:portcblo Documentction for Unita 1 and 2 A. Summary of Operating Experience l This section has been reported monthly in LaSalle's NRC Monthly Reports (Section II.A) dated January 1985 through December 1985.

B. Unit Outage or Power Reductions This section has been reported monthly in LaSalle's NRC Monthly Reports (Sections II.B.4/II.C/II.D.3) Dated January 1985 through December 1985.

C. Radiation Exposure This information is reported annually in the respective sections relating to numbers compiled for LaSalle Units 1 and 2, in the 10 CFR 20.407 annual report submitted under a different cover.

D. Indications of Failed Fuel Elements During the reporting period January 1985 through December 1985, there was no indication of failed fuel elements in Units 1 and 2.

8. Tests and_ Experiments Requirinq NRC Approval During the reporting period January 1985, through December 1985 there were no tests and experiments requiring NRC approval on Units 1 and 2.

P. Summary of ECCS Outages This section has been reported monthly in LaSalle NRC Monthly Reports (Section II.E.2) dated January 1985 through December 1985.

G. Safety Related Modifications completed in 1985.

M-1-0-82-010 Replace existing flow and pressure transmitters with Rosemount transmitters on post-Loca flydrogen recombiners. The original transmitters were susceptible to radio frequency interference causing erratic operation and damage to the transmitters. There was no unreviewed safety question.

M-1-0-82-053 Install attached log and expansion anchor to housing where embedded anchor has broken off. This is a functionally similar to replacement of a damaged part. There was no unroviewed safety question.

M-1-0-83-011 Seperate the electronics from SQRT converter to a less radiated area. Relocation of the SQRT converter to a milder zone is necessary to assure performance and safety objectives. There was no unreviewed safety question.

DOCUMENT 2277r

.M-1-1-80-007 This modification consists of reducing the water rod lower end plug shank length and replacing upper expansion spring with a modified design spring. The new end plug configuration will be consistent with the previous lower end plug design for 8 x 8 bundles. There was no unreviewed safety question.

M-1-1-82-009 Reduce battery size to 58 cells, replaced a three cell battery to one-one cell battery ('No dummy cells) component. The new float voltage will be 130.5 VDC and new equalizer voltage will be 135.1 VDC. There was no unreviewed safety question.

M-1-1-82-018 Aluminium rivets attaching nylon bearings to fuel grapple need replaced with stainless steel rivets. This is a result of SIL-334 which described the shearing off of bearings attached by aluminium rivets. There was no unreviewed safety question.

M-1-2-82-056 Replace existing valves on containment monitoring system with nuclear grade non-leaking valves. This was a parts upgrade due to excessive leakage. There was no unreviewed safety question.

M-1-1-82-091 Install safety parameter display system (SPDS) and all wiring needed for operation for SpDS parameter inputs to computer. There was no unreviewed safety question.

M-1-1-82-134 Resize the RCIC restricting flow orifice to allow for rated flow. This was done to accomplish the 600 gpm required flow. There was no unreviewed safety question.

M-1-1-82-234 Install operation counters for the air start motors on "lA" DG. This provides indication of total number of air starts, to be used for preventative maintensace. There was no unreviewed safety question.

M-1-1-82-235 Install operation counters for the air start motors on "lB" DG. This provides indication of total number of air starts, to be used for preventative maintenance. There was no unreviewed safety question.

DOCfDfENT 2277r

.M-1-1-82-309 This modification meets license condition 2.c.(21)(c) that requires all control and monitoring instruments be removed from the engine skid, except those instruments that are qualified for this location. There was no unreviewed safety question.

M-1-1-83-066 Add steel plate doors to close existing openings in the sacrificial shield. The doors improve the airflow to the annulus region per the original design, while closing the original openings. There was no unreviewed safety question.

M-1-1-83-094 The current transmitter has a problem with the zero shift, replace current Baily 556 model with the Rosemont 1153 transmitter. The Rosemont transmitters will improve system reliability. There was no unreviewed safety question.

M-1-1-83-115 Replace the SBGT heaters with ones that are environmentally qualified.

This will not affect system operations. There was no unreviewed safety

. question.

M-1-1-83-140 cut and cap, off packing leak off line on the IE12-F009 valve. This line is being removed to ease valve maintenance. Valve pressure boundary will not be effected. There was no unreviewed safety question.

M-1-1-84-002 This modification involves minor changes to the siesmic supports of cable trays. No changes to the operations of any systems or equipment will take place. There was no unreviewed safety question.

M-1-1-84-043 Replace handswitch for valves 1E12-F099A/B with spring return to normal so the valves will not open after an isolation reset. The function and ,

cycling time of the valve will remain unchanged.- There was no unreviewed safety question.

M-1-1-84-071 This provides for the replacement of the SBLC pump motors with Environmentally qualified motors. The existing 40 H.P. motors were replaced with 40 H.P. reliance electric motors. There was no unreviewed safety question.

DOCUMENT 2277r

M-1-1-84-079 This provides for the environmental qualification of the Post LOCA hydrogen recombiner as per Unit 1 License condition 2.c.11. There was no unreviewed safety question.

M-1-1-84-102 Replace critical seals and 0-Rings in the actuator with new seals from the manufacturer which are made of an improved material. This refurbishment is required to comply with environmental qualification criteria. There was no unreviewed safety question.

M-1-1-84-103 Upgrade the G.E. radiation detector to meet environmental qualification requirements. This criteria was imposed by 10 CPR 50.49. There was no unreviewed safety question.

M-1-1-85-029 Replace the DG Cooling water pump motor with an "H" type insulated winding in place of the existing "RH" type insulated winding. There was no unreviewed safety question.

M-1-1-85-030 Install a locking tab to prevent the PW check valves bushings from rotating. This welds the hinge pin bushings into the feedwater check valves. This is needed since these bushings have exhibited a tendancy to turn in its housing during plant operations, which interferes with adequate valve seating. There was no unreviewed safety question.

M-1-1-85-048 Remove 120 VP.C breaker #11 to eliminte overloading on presently installed 30 AMP Breaker. Replaced with 30 AMP three phase breaker wired in series. There was no unreviewed safety question.

M-1-2-80-001 Modify tabbed water rod end plug and expansion spring. Reduced the water rod lower end plug shank length and replacing the upper expansion spring with a modified (GB) design, for the 8x8 bundles. There was no unreviewed safety question.

M-1-2-82-013

, This-changes the size of two pipe supports on the hydrogen recombiner system. This will eliminte interference with the containment personnel access hatch. There was no unreviewed safety question.

DOCUMENT 2277r

M-1-2-83-009

.. D!placa SBGT' System Hrctor. This replaced th2 existing htrdware with new hardware which is environmentally qualified for both the service and accident conditions. There was no unreviewed safety question.

M-1-2-84-026 Install'MSIV A-D INBD/OUTBD and TSV l-4, not full open alarms. This will give the operator information on trip relays positioning during MSIV and TSV surviellances. There was no unreviewed safety question.

M-1-2-84-053 Install snubbers in sensing lines for 854 PSIG Main Steam Isolation switches. Installed to prevent excessive fluid pulsations to prevent isolations. There was no unreviewed safety question.

M-1-2-84-068 Reroute Diesel Generator "O" and "2A" fuel oil transfer pump control cables for fire protection. This will conform to the license condition 2.c.(15).k. There was no unreviewed safety question.

M-1-2-84-084 The structural brace for snubber M09-2031S interferes with the full range of motion of SRV 2B21-F013N. This was discovered during the performance of STP-26. The brace was inverted to give proper clearance needed. There was no unreviewed safety question.

M-1-2-84-086 This provides for the replacement of interlocks in electrical contactors for the 12 DC powered valves at MCC 221Y. The original interlocks failed environmental qualification testing and needed to be replaced. There was no unreviewed safety question.

M-1-2-84-106 This installs a pull chain to enable safe operation of Diesel Storage Tank fill valve. This will provide easier and safer access to the operation of the valve. There was no unreviewed safety question.

M-1-2-84-116 This replaces the SBLC pump per environmental qualification criteria. The new motors have a higher full Icad current which increases the thermal overload setting. There was no unreviewed safety question.

M-1-2-84-124 This moves the Post Loca Hydrogen Recombiner power cabinet to a milder environment to meet environmental qualification requirements. There was no unreviewed safety question.

DOCUMENT 2277r

. , M-1-2-84-132 Perfctmed direct rcplacement cf valva (ctuatcr motcrc h;ving "D" insulation with motors having "RH" insulation. This is to meet environmental qualification criteria. There was no unreviewed safety question.

M-1-2-84-145 Upgraded gaskets on VG damper actuator 2FZ-VU003 to meet Environmental Qualification Requirements. There was no unreviewed safety question.

M-1-2-84-146 Upgrade G.E. radiation detector to meet to met Environmental Qualification Requirements. Adc thermal insulation to the unprotected opening of the cored hole in which it is housed. This insulation will limit Temperature extremes to the detector such that its temperature threshold will not be exceeded. There was no unreviewed safety question.

M-1-2-84-155 Add a timing circuit to reduce voltage to coil on Valcor solenoid valves so qualified life of solenoid is extended. This modification is required in order to meet constraints of environmental qualification. There was no unreviewed safety question.

M-1-2-84-156 Replace the presently installed Barton instrumentation with environmentally qualified instrumentation. The Barton will be replaced with a Rosemount transmitter. There was no unreviewed safety questicn.

M-1-2-84-177 Relocate the main steam tunnel leak detection temperature elements to improve the operation of the leakage detection system by increasing system accuracy. There was no unreviewed safety question.

M-1-2-85-015 Replace MSIV-LCS flow elements with a model manufactured by FCI in order to meet Environmental Qualification Requirements. The FCI elements maintains a reliable output at high temperatures and will be more durable. The was no unreviewed safety question.

M-1-2-85-028 Installation of support hardware and 15 wire mesh bags containing passive samples of electrical material inside drywell and steam tunnel. LaSalle station will be a test site for the EpRI/VCONN cable aging study. There was no unreviewed safety question.

i 1

i i

DOCUMENT 2277r

3-1-2-85-037

.. Celoc ts PRM campl3 trp3 on th> RHR EGrvica water lines to obtain

- inclusive samples from RHR service water loads. This modification will reroute the PRM piping to allow the seal cooling water to be sampled.

There was no unreviewed safety question.

M-1-2-85-038 This modification consists of welding a square piece of material (22 lbs) I to the Disc extension. This corrects an imbalance created during past machining on the disc bushings of the 2B21-F010A feed water check valve.

This weight will increase the closing moment on the valve disc and permit proper closing. There was no unreviewed safety question.

M-1-2-85-039 This modification adds bushing locking tabs to valves 2B21-F010A/B. These tabs are to prevent relative motion between the bushing and valve disc.

This work is being done following recommendations from Anchor Darling Valve company. There was unreviewed safety question.

M-1-2-85-040 This modification will eliminate the dual seat feature on the feedwater check valves, 2821-F010A/B. This will let all seating functions to be accomplished by the hard face seats. There was no unreviewed safety question.

M-1-2-85-042 On the RCIC injection line testable check valves (2E51-F065/66) install a mechanical stop to limit valve disc travel past the center of gravity to prevent the valve from hanging open. This modification adds a spacer block or counter weight extension to the valve disc. There was no unreviewed safety question.

M-1-2-85-047 i This modification documents the rewind of the RHR C service water pump motor (2812-C300C) with H insulation. The motor originally had type RH insulation from the manufacturer. There was no unreviewed safety question.

M-1-2-85-048 Replace existing GFD type relay with a EPD type for 2B21-HK67x17/18.

These relays are for 2WR029/40, which are primary containment isolation valves. This relay was qualified siesmically for nuclear use. There was no unreviewed safety question.

DOCUMENT 2277r r

l M-1-2-85-051

~ -

. l

, - . . Oplaca cx19 ting GDP type relty with a EPD type for SBGT initiction relcya 2R5 in panel 2PA14J. This relay was qualified siesmically for nuclear use. There was no unreviewed safety question. )

l M-1-2-85-053 This modification relocates the inlet differential temperature sensors for the RHR corner rooms from a wall mounted location to the supply air duct from the VY System. This allows the sensors to monitor for any leaks between the supply air grill and the return air grill. There was no unreviewed safety question.

M-1-2-85-055 Relocate leak detection differential temperature sensors (2831-N005A/B) into the duct so that they can sense the cool air temperature. This improves the differential temperature sensing accuracy without having to change the setpoint. There was no unreviewed safety questions.

M-1-2-85-065 Install an RC network across the RWCU isolation tir.ar motor to prevent trips on the leakage detection Rileys when RWCU isolates. This network will absorb (Filter out) the energy stored and being dissipated by de-energizing the timer motor coil. There was no unreviewed safety question.

M-1-2-85-066 Remove 120VAC breaker 816 to eliminate overloading on presently installed 30 Amp. breaker. Replace with 30 AMP three-phase breaker. This configuration will provide tripping at high temperatures at a current level much closer to the normal temperature trip-point. There was no unreviewed safety question.

I DOCUMENT 2277r

r .

r [^c Commonwe:lth Edison D{O b

,. * /

i -

LaSalle County Nuclear Station Rural Route #1, Box 220

\ N/ 7 Marseilles,lilinois61341

/ Telephone 815/357-6761 PRIORITY ROUTIQ February 24, 1986 j [f, _

Sf $$_

%-Sm

~-

Region III, USNRC Office of Inspection and Enforcement IILE M 799 Rocsevelt Road Glen Ellyn, IL. 60137 Gentlemen:

Enclosed for your information in the annual report covering LaSalle County Nuclear Power Station for the period covering January, 1985 through December, 1985.

Very truly yours, G. J. Diederi Station Manager LaSalle County Station GJD/JP/cth Enclosure cc: NEC Director of Inspection and Enforcement, Washington, D.C.

NRC Director. Office of Management l

Information and Program Control, Washington, D.C.

NRC Resident Inspector, LaSalle Station D. L. Farrar. Director of Nuclear Licensing Gary Wright, IL Dept. of Nuclear Safety K, L. Grasser, Divisional Vice President 1

I MAR 3 1986 DOCUMENT 2277r hh

.