ML20151X695

From kanterella
Revision as of 12:44, 24 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Application for Amend to Licenses NPF-2 & NPF-8,deleting Offsite & Onsite Organization Charts from Tech Specs 6.2.1 & 6.2.2.Fee Paid
ML20151X695
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/28/1988
From: Mcdonald R
ALABAMA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20151X700 List:
References
GL-88-06, GL-88-6, NUDOCS 8805040226
Download: ML20151X695 (3)


Text

._-

'h , e O

Alab:rre Power Comp ny 600 North 18th Stro;t

- Post Office Gox 2641 Birmingham, Alabama 352914400 Telephone 205 250-1835 R. P. Mcdonald m

senior v.ce Presieent Alabama Power the sM%vn eI&lnc S) stem 10 CFR 50.90 April 28, 1988 Docket Nos. 50-348 50-364 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Vashington, D.C. 20555 Gentlemen:

Joseph H. Farley Nuclear Plant - Units 1 and 2 Proposed Removal Of Organization Charts From Technical Specification Administrative Control Requirements On March 22, 1988 Generic Letter 88-06, "Removal of Organization Charts From Technical Specification Administrative Control Requirements" vas issued to all power reactor licensees and applicants. The guidance provided in this Generic Letter addresses amendments that may be proposed for removing organization charts from the administrative control requirements of the Technical Specifications.

Accordingly, Alabama Power Company proposes to delete the offsite and onsite organization charts (Figures 6.2-1 and 6.2-2) from Technical Specifications 6.2.1 and 6.2.2. Furthermore, Alabama Power Company proposes to revise Specifications 6.2.1 and 6.2.2 to include general requirements that capture the essential aspects of the organizational structure that are defined by the organization charts. The proposed changes are consistent with the guidance of Generic Letter 88-06.

The proposed technical specification changes are provided in Attachment 1.

Alabama Power Company has determined that the proposed changes do not involve a significant hazards consideration. In accordance vith 10 CFR 50.92, a significant hazards consideration evaluation is provided in l

Attachment 2. Alabama Power Company's Plant Operations Reviev Committee has I reviewed these proposed changes and the Nuclear Operations Review Board vill review these proposed changes at a future meeting. NRC approval of this change is requested as soon as practicable.

td b 8805040226 880428 / 0\

0 PDR ADOCK 05000348 i q $000(/lg p DCD \ $

U. S. Nuclear Regulatory Commission April 28, 1988 Page 2 Pursuant to 10 CFR 170.21, the required License Amendment Application Fee of $150.00 is enclosed. A copy of this proposed change has also been sent to Dr. C. E. Fox, the Alabama State Designee, in accordance with 10 CFR 50.91(b)(1).

If there are any questions, please advise.

Respectfully submitted, ALABAMA POWER COMPANY A

L O ..$1 . N R. P. Mcdonald

.k  :

RPM / JAR TS1-8.19 cc: Mr. L. B. Long SV'AN TO AND SUBSCRIBED BEFORE ME Dr. J. N. Grace Mr. E. A. Reeves TH S c2h DAY 0 N , 1988 Mr. V. H. Bradford 1 Dr. C. E. Fox OMAs b b otary PuUlic My Commission Expires: k-\\-8&

l

< ATTACBMENT 1 Proposed Changed Pages Unit 1 Revision Page 6-1 Replace Page 6-la Delete Page 6-2 Replace Page 6-3 Replace Unit 2 Revision Page 6-1 Replace Page 6-la Delete Page 6-2 Replace Page 6-3 Replace I

i