ML20154J599

From kanterella
Revision as of 00:38, 23 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Tech Spec 4.9.7.2, Spent Fuel Pit
ML20154J599
Person / Time
Site: Yankee Rowe
Issue date: 05/19/1988
From:
YANKEE ATOMIC ELECTRIC CO.
To:
Shared Package
ML20154J598 List:
References
NUDOCS 8805270072
Download: ML20154J599 (1)


Text

.c ..

REFUELING OPERATIONS SPENT FUEL PIT SURVEILLANCE REQUIREMENTS 4.9.7.2 Spent fuel pit building hatches (excluding the cask hatch cover), the temporary gate, the shielding panels, the shipping cask liners, the volume reduction equipment, the shipping casks, and the spent fuel assembly nondestructive test equipment shall not be permitted to be moved over the spent fuel pit unless:

(a) With newly discharged spent fuel stored in the lower racks, all spent fuel in the spent fuel pit has decayed for at least 45 days for 76 Newly Discharged Spent Fuel Assemblies (NDSFA), 37 days for 40 NDSFA, and 36 for 36 NDSFA, or (b) With newly discharged spent fuel stored in the upper racks, all spent fuel in the spent fuel pit has decayed for at least r20 days for 76 Newly Discharged Spent Fuel Assemblies (NDSFA), 45 days for 40 NDSFA, and 43 days for 36 NDSFA.

I l

YANKEE R0WE 3/4 9-8a Amendment No. 92 8805270072 880519 PDR ADOCK 05000029 P DCD