Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20206B9211999-04-23023 April 1999
[Table view]Proposed Defueled Tech Specs Stating That Characterization of Revised Review & Audit Function Remain in Plant TS Rather than Be Transferred to Plant QA Plan ML20205N1821999-03-24024 March 1999 Proposed Tech Specs Deleting Condition 2.C(10) from Plant License ML20204E5701999-03-17017 March 1999 Proposed Tech Specs,Removing Section 6.7, Procedures & Programs & Section 6.9, Record Retention, from TS & Transferring to Yankee Decommissioning QA Program ML20204E5241999-03-17017 March 1999 Revised Tech Specs,Consolidating Mgt Positions & Transferring Review & Audit Functions to Yankee Decommissioning QA Program ML20204D9031999-03-17017 March 1999 Proposed Tech Specs Section 6.2.2,deleting Overtime Restrictions Currently Incorporated in Ynps TS ML20155A2561998-10-15015 October 1998 Proposed Defueled Tech Specs Re Required Frequency of Submittal of Radioactive Effluent Release Rept ML20237E3631998-08-20020 August 1998 Proposed Tech Specs,Removing Definition of Site Boundary from Subsection 1.10 of Definitions & Modifying Subsection 5.1 of Design Features ML20216E2101997-09-0505 September 1997 Proposed Tech Specs,Modifying Defueled TS 3.1.3 to Allow Util to Continue W/Implementation of Ynps Decommissioning Plan Which Has Been Incorporated Into Ynps FSAR ML20126E7601992-12-21021 December 1992 Permanently Defueled Tech Specs ML20055D4031990-06-25025 June 1990 Proposed Tech Specs Re Changes in Safety Injection Tank Min Water Inventory ML20043E6231990-05-31031 May 1990 Proposed Tech Specs 3.10.3 & 3.10.4 Re Limiting Conditions for Operation ML20034B3071990-04-19019 April 1990 Proposed Tech Specs Re HPSI & LPSI Pump Surveillance Frequency ML20042E2211990-04-12012 April 1990 Proposed Tech Specs,Addressing Administrative Changes ML20006A4651990-01-18018 January 1990 Proposed Tech Specs Re HPSI Throttle & Pressurizer Auxiliary Spray Mods & Surveillance Requirements for ECCS ML20005F1431990-01-0505 January 1990 Proposed Tech Specs Re Instrumentation Sys ML19332D1161989-11-22022 November 1989 Proposed Tech Specs Incorporating Wording from Generic Ltr 84-13 Which Removes Table 3.7.4 Re safety-related Mechanical Snubbers ML20247L3581989-09-14014 September 1989 Proposed Tech Specs Re Limiting Condition for Operation & Surveillance Requirements for Control Rod Insertion Limits, Boron Control,Peak LHGR & Xenon Redistribution Multiplier ML20246M0541989-08-31031 August 1989 Proposed Tech Specs,Modifying Pages 3/4 3-19,Table 3.3-4 & 3/4 3-21,Table 4.3-3,to Add Steam Line Monitors & Primary Vent Stack Noble Gas Monitor to Listing of Radiation Monitoring Instrumentation & Surveillance Requirements ML20247M6321989-07-24024 July 1989 Proposed Tech Specs Re Power Distribution Limits ML20246M0221989-07-12012 July 1989 Proposed Tech Spec Tables 3.3-4, Radiation Monitoring Instrumentation & 4.3-3, Radiation Monitoring Instrumentation Surveillance Requirements ML20244D3841989-04-14014 April 1989 Proposed Tech Specs Re Steam Generator Pressure/Temp Limits, Primary Pump Seal Water Sys,Control Room Emergency Air Cleaning Sys & Sealed Source Contamination ML20246P1401989-03-21021 March 1989 Proposed Tech Specs Adding Snubber DRH-SNB-1 to Table 3.7-4 ML20196B0771988-11-22022 November 1988 Tech Spec Page 3/4 3-2 Inadvertently Omitted from Util 881021 Proposed Change 222 to Tech Specs ML20205L1691988-10-21021 October 1988 Proposed Tech Specs,Removing Description of High Pressurizer Water Level & Modifying Description of Main Coolant Sys High Pressure ML20151Z1871988-08-11011 August 1988 Proposed Tech Spec Changes to Remove Ref to Specific Value of 2,200 Ppm & Provide Generalized Boron Concentration Value & Remove Requirement for Inverse Count Rate Multiplication Measurement After Insertion of Each Five Fuel Assemblies ML20150B0371988-06-27027 June 1988 Proposed Tech Specs,Allowing Installation of Two Piping Mods Necessary for Installation of Enhanced Water Cleanup Sys ML20196K7361988-06-27027 June 1988 Proposed Tech Spec Table 3.6.1, Containment Barriers, Deleting Valve VD-V-752 & Tech Spec 3.4.5.1, Main Coolant Leakage Detection Sys, Adding Operability,Action & Surveillance Requirements for Telltale Level Switch ML20196K1391988-06-27027 June 1988 Proposed Tech Specs Table 3.6-1 ML20196J2831988-06-27027 June 1988 Proposed Tech Specs 3.5.1.e,increasing Nitrogen Supply Pressure to Safety Injection Accumulator to 488 Pounds Per Square Inch Gauge ML20154J5991988-05-19019 May 1988 Proposed Tech Spec 4.9.7.2, Spent Fuel Pit ML20148Q8911988-04-0404 April 1988 Proposed Tech Specs Defining Incore Detection Sys as Combination Sys of Both Fixed & Movable Detectors & Associated Equipment ML20151D0671988-04-0404 April 1988 Proposed Tech Spec Page 3/4 8-10 Re Battery Chargers ML20150E2381988-03-25025 March 1988 Proposed Tech Specs Modifying Containment Isolation Barriers ML20148J2991988-03-25025 March 1988 Proposed Tech Spec Table 3.3-2, ESF Instrumentation & Table 4.3-2, ESF Instrumentation Surveillance Requirements, Reflecting Deleted Modes 5(1) & 5*, Respectively ML20148J2701988-03-23023 March 1988 Proposed Tech Spec 3.1.1.1.2,reflecting Change in Shutdown Margin Switching Temp from 490 to 470 F ML20150C0171988-03-11011 March 1988 Proposed Tech Specs Modifying Section 6.2 & Moving Organization Charts (Figures 6.2-1 & 6.2-2) to Section 501 of FSAR ML20148K1671988-01-15015 January 1988 Proposed Tech Specs,Adding Shipping Cask Liners,Vol Reduction Equipment,Shipping Casks Not for Spent Fuel & Spent Fuel Assembly Nondestructive Test Equipment to Tech Spec 3.9.7 ML20149E8871988-01-0505 January 1988 Proposed Tech Specs,Modifying Tables 3.3-2,3.3-3 & 4.3-2 to Require 18-month Functional Test of First Level Undervoltage Protection for Each of Three 480-volt Emergency Buses ML20149E7271988-01-0505 January 1988 Proposed Tech Spec Figure 6.2.2, Facility Organization, Reflecting Elevated Mgt Concerns Re Security ML20210A5041987-01-29029 January 1987 Proposed Tech Specs Re Extension of Cycle 18 in-core Instrumentation Sys to Cycle 19 ML20213A4431987-01-22022 January 1987 Proposed Tech Specs,Providing Flexibility in Areas Governing Integrity Testing of Steam Generator Tubes ML20215N6281986-10-22022 October 1986 Proposed Tech Spec 4.5.2.b.4,increasing Allowable Open Time for LPSI Min Recirculation Line Valve CS-MOV-532 to 120 Minutes Per Wk ML20197A7611986-10-20020 October 1986 Proposed Tech Specs,Allowing for Performance of 10CFR50.59 Reviews for Future Core Reloads ML20211E8091986-10-0909 October 1986 Proposed Tech Spec Table 4.3-1, Reactor Protective Sys Instrumentation Surveillance Requirements ML20204F7191986-07-31031 July 1986 Proposed Changes to Tech Specs 3.3.3.2,4.2.1.2,4.2.2.1, 4.2.2.2 & 4.2.3.2 Re Operation of in-core Instrumentation Sys ML20211K7501986-06-24024 June 1986 Proposed Changes to Tech Specs to Allow Performance of 10CFR50.59 Reviews for Future Core Reloads ML20151U5571986-02-0505 February 1986 Proposed Tech Specs,Per Generic Ltr 84-43, Reporting Requirements of 10CFR50... & Generic Ltr 85-19, Reporting Requirements on Primary Coolant Iodine Spikes & Supporting LER Sys Mods ML20136J3981986-01-0808 January 1986 Proposed Changes to Tech Spec Table 3.6-1,replacing Manual Containment Isolation Valve W/Blank Flange ML20141G3461986-01-0606 January 1986 Proposed Tech Spec Changes,Permitting Filing of Supplemental Dose & Meteorological Summary Rept within 150 Days of Jan 1 Each Yr ML20138N3131985-10-31031 October 1985 Proposed Tech Spec Changes Per NUREG-0737,Item II.F.1.6, Containment Hydrogen Monitors 1999-04-23 Category:TECHNICAL SPECIFICATIONS & TEST REPORTS MONTHYEARML20206B9211999-04-23023 April 1999
[Table view]Proposed Defueled Tech Specs Stating That Characterization of Revised Review & Audit Function Remain in Plant TS Rather than Be Transferred to Plant QA Plan ML20205N1821999-03-24024 March 1999 Proposed Tech Specs Deleting Condition 2.C(10) from Plant License ML20204D9031999-03-17017 March 1999 Proposed Tech Specs Section 6.2.2,deleting Overtime Restrictions Currently Incorporated in Ynps TS ML20204E5241999-03-17017 March 1999 Revised Tech Specs,Consolidating Mgt Positions & Transferring Review & Audit Functions to Yankee Decommissioning QA Program ML20204E5701999-03-17017 March 1999 Proposed Tech Specs,Removing Section 6.7, Procedures & Programs & Section 6.9, Record Retention, from TS & Transferring to Yankee Decommissioning QA Program ML20155A2561998-10-15015 October 1998 Proposed Defueled Tech Specs Re Required Frequency of Submittal of Radioactive Effluent Release Rept ML20237E3631998-08-20020 August 1998 Proposed Tech Specs,Removing Definition of Site Boundary from Subsection 1.10 of Definitions & Modifying Subsection 5.1 of Design Features ML20197D4341997-12-31031 December 1997 Rev 1 to Ynps License Termination Plan ML20216E2101997-09-0505 September 1997 Proposed Tech Specs,Modifying Defueled TS 3.1.3 to Allow Util to Continue W/Implementation of Ynps Decommissioning Plan Which Has Been Incorporated Into Ynps FSAR ML20141F6391997-05-15015 May 1997 License Termination Plan for Yankee Nuclear Power Station ML20198G6381997-02-0707 February 1997 Rev 12 to Ynps Off-Site Dose Calculation Manual ML20138Q5301996-10-31031 October 1996 Rev 11 to Off-Site Dose Calculation Manual ML20198S6131993-12-31031 December 1993 Partially Deleted Rev 9 to Edcr 93-303, Vessel Internals Segmentation Component Removal Program 1995 ML20198S5681993-08-0202 August 1993 Partially Deleted Rev 6 to Edcr 93-303, Reactor Vessel Internals Segmentation Component Removal Program 1993 ML20126E7601992-12-21021 December 1992 Permanently Defueled Tech Specs ML20058D8451990-10-29029 October 1990 Separate Rept Re Local Leak Rate Test Results from Core 19/20 Refueling Outage ML20058D8421990-06-30030 June 1990 June 1990 Reactor Containment Bldg Integrated Leak Rate Test & Periodic Local Leak Rate Tests ML20055D4031990-06-25025 June 1990 Proposed Tech Specs Re Changes in Safety Injection Tank Min Water Inventory ML20043E6231990-05-31031 May 1990 Proposed Tech Specs 3.10.3 & 3.10.4 Re Limiting Conditions for Operation ML20034B3071990-04-19019 April 1990 Proposed Tech Specs Re HPSI & LPSI Pump Surveillance Frequency ML20042E2211990-04-12012 April 1990 Proposed Tech Specs,Addressing Administrative Changes ML20006A4651990-01-18018 January 1990 Proposed Tech Specs Re HPSI Throttle & Pressurizer Auxiliary Spray Mods & Surveillance Requirements for ECCS ML20005F1431990-01-0505 January 1990 Proposed Tech Specs Re Instrumentation Sys ML19332D1161989-11-22022 November 1989 Proposed Tech Specs Incorporating Wording from Generic Ltr 84-13 Which Removes Table 3.7.4 Re safety-related Mechanical Snubbers ML20247L3581989-09-14014 September 1989 Proposed Tech Specs Re Limiting Condition for Operation & Surveillance Requirements for Control Rod Insertion Limits, Boron Control,Peak LHGR & Xenon Redistribution Multiplier ML20246M0541989-08-31031 August 1989 Proposed Tech Specs,Modifying Pages 3/4 3-19,Table 3.3-4 & 3/4 3-21,Table 4.3-3,to Add Steam Line Monitors & Primary Vent Stack Noble Gas Monitor to Listing of Radiation Monitoring Instrumentation & Surveillance Requirements ML20247M6321989-07-24024 July 1989 Proposed Tech Specs Re Power Distribution Limits ML20246M0221989-07-12012 July 1989 Proposed Tech Spec Tables 3.3-4, Radiation Monitoring Instrumentation & 4.3-3, Radiation Monitoring Instrumentation Surveillance Requirements ML20244D3841989-04-14014 April 1989 Proposed Tech Specs Re Steam Generator Pressure/Temp Limits, Primary Pump Seal Water Sys,Control Room Emergency Air Cleaning Sys & Sealed Source Contamination ML20244D3931989-04-11011 April 1989 Core 20 Startup Program for Yankee Nuclear Power Station ML20246P1401989-03-21021 March 1989 Proposed Tech Specs Adding Snubber DRH-SNB-1 to Table 3.7-4 ML20196B0771988-11-22022 November 1988 Tech Spec Page 3/4 3-2 Inadvertently Omitted from Util 881021 Proposed Change 222 to Tech Specs ML20205L1691988-10-21021 October 1988 Proposed Tech Specs,Removing Description of High Pressurizer Water Level & Modifying Description of Main Coolant Sys High Pressure ML20151Z1871988-08-11011 August 1988 Proposed Tech Spec Changes to Remove Ref to Specific Value of 2,200 Ppm & Provide Generalized Boron Concentration Value & Remove Requirement for Inverse Count Rate Multiplication Measurement After Insertion of Each Five Fuel Assemblies ML20196K7361988-06-27027 June 1988 Proposed Tech Spec Table 3.6.1, Containment Barriers, Deleting Valve VD-V-752 & Tech Spec 3.4.5.1, Main Coolant Leakage Detection Sys, Adding Operability,Action & Surveillance Requirements for Telltale Level Switch ML20196J2831988-06-27027 June 1988 Proposed Tech Specs 3.5.1.e,increasing Nitrogen Supply Pressure to Safety Injection Accumulator to 488 Pounds Per Square Inch Gauge ML20196K1391988-06-27027 June 1988 Proposed Tech Specs Table 3.6-1 ML20150B0371988-06-27027 June 1988 Proposed Tech Specs,Allowing Installation of Two Piping Mods Necessary for Installation of Enhanced Water Cleanup Sys ML20154J5991988-05-19019 May 1988 Proposed Tech Spec 4.9.7.2, Spent Fuel Pit ML20148Q8911988-04-0404 April 1988 Proposed Tech Specs Defining Incore Detection Sys as Combination Sys of Both Fixed & Movable Detectors & Associated Equipment ML20151D0671988-04-0404 April 1988 Proposed Tech Spec Page 3/4 8-10 Re Battery Chargers ML20148Q4681988-03-31031 March 1988 Rev 2 to Guidance for Development of Simulation Facility to Meet Requirements of 10CFR55.45 ML20150E2381988-03-25025 March 1988 Proposed Tech Specs Modifying Containment Isolation Barriers ML20148J2991988-03-25025 March 1988 Proposed Tech Spec Table 3.3-2, ESF Instrumentation & Table 4.3-2, ESF Instrumentation Surveillance Requirements, Reflecting Deleted Modes 5(1) & 5*, Respectively ML20148J2701988-03-23023 March 1988 Proposed Tech Spec 3.1.1.1.2,reflecting Change in Shutdown Margin Switching Temp from 490 to 470 F ML20150C0171988-03-11011 March 1988 Proposed Tech Specs Modifying Section 6.2 & Moving Organization Charts (Figures 6.2-1 & 6.2-2) to Section 501 of FSAR ML20154L9791988-03-0606 March 1988 Rev 6 to Yankee Nuclear Power Station Offsite Dose Calculation Manual ML20148K1671988-01-15015 January 1988 Proposed Tech Specs,Adding Shipping Cask Liners,Vol Reduction Equipment,Shipping Casks Not for Spent Fuel & Spent Fuel Assembly Nondestructive Test Equipment to Tech Spec 3.9.7 ML20149E7271988-01-0505 January 1988 Proposed Tech Spec Figure 6.2.2, Facility Organization, Reflecting Elevated Mgt Concerns Re Security ML20149E8871988-01-0505 January 1988 Proposed Tech Specs,Modifying Tables 3.3-2,3.3-3 & 4.3-2 to Require 18-month Functional Test of First Level Undervoltage Protection for Each of Three 480-volt Emergency Buses 1999-04-23 |
Text
_ _ _ _ - _ _ _.
b "E$
3 TABLE 4.3-1
?
8 g
gg REACTOR PROTECTIVE SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS E
OPJ 2S CHANNEL MODES'IN WHICH CHANNEL CHANNEL FUNCTIONAL SURVEILLANCE og gg FUNCTIONAL UNIT CHECK CALIBRATION TEST REQUIRED II) 1.
Manual' Reactor Trip
-NA NA S/U NA 2.
Power Range, Neutron Flux and Intermediate Power Range, Neutron Flux S
D(2),R(5)
M(6) 1, 2 and
- 3.
Intermediate Range, Neutron Flux, 2
High Startup Rate S
R(5)
M 1, 2 and
- w
[
4.
Source Range, Neutron Flux S
R(5)
S/U(I) 2, 3, 4, 5 and
- 5.
Low Main Coolant Flow (SGAP)
S R(4)
M(3) 3 6.
Low Main Coolant. Flow, Systems A and B (MC Pump Current)
S R
M 1
[
7.
High Main Coolant System Pressure S
R(4)
M 1, 2 8.
Low Main Coolant System Pressure S
R(4)
M 1, 2 9.
High Pressurizer Water Level S
R(4)
M(3) 1, 2 i
O 10.
Low Steam' Generator Water Level S
R(4)
M 1
E t
,..o TABLE 4.3-1 (Continued)
NOTATION With the reactor trip system breakers closed and the control rod drive system capable of rod withdrawal.
(1) -
If not performed in the previous 7 days.
~
(2)
Heat balance only, above 15% of RATED THERMAL POWER, at least 3 times per week with a maximum time interval of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
(3)
When shutdown longer than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, if not performed in the previous 31 days.
(4)
Known pressure applied to' sensor.
(5) -
Neutron detectors may be excluded from CHANNEL CALIBRATION.
(6) -
Low trip setpoint verification excluded.
4 s
YANKEE-R0WE 3/4 3-10 Amendment No. 49, 69