Proposed Tech Spec Table 3.3-2, ESF Instrumentation & Table 4.3-2, ESF Instrumentation Surveillance Requirements, Reflecting Deleted Modes 5(1) & 5*, RespectivelyML20148J299 |
Person / Time |
---|
Site: |
Yankee Rowe |
---|
Issue date: |
03/25/1988 |
---|
From: |
YANKEE ATOMIC ELECTRIC CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20148J293 |
List: |
---|
References |
---|
NUDOCS 8803300230 |
Download: ML20148J299 (4) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20206B9211999-04-23023 April 1999 Proposed Defueled Tech Specs Stating That Characterization of Revised Review & Audit Function Remain in Plant TS Rather than Be Transferred to Plant QA Plan ML20205N1821999-03-24024 March 1999 Proposed Tech Specs Deleting Condition 2.C(10) from Plant License ML20204E5701999-03-17017 March 1999 Proposed Tech Specs,Removing Section 6.7, Procedures & Programs & Section 6.9, Record Retention, from TS & Transferring to Yankee Decommissioning QA Program ML20204E5241999-03-17017 March 1999 Revised Tech Specs,Consolidating Mgt Positions & Transferring Review & Audit Functions to Yankee Decommissioning QA Program ML20204D9031999-03-17017 March 1999 Proposed Tech Specs Section 6.2.2,deleting Overtime Restrictions Currently Incorporated in Ynps TS ML20155A2561998-10-15015 October 1998 Proposed Defueled Tech Specs Re Required Frequency of Submittal of Radioactive Effluent Release Rept ML20237E3631998-08-20020 August 1998 Proposed Tech Specs,Removing Definition of Site Boundary from Subsection 1.10 of Definitions & Modifying Subsection 5.1 of Design Features ML20216E2101997-09-0505 September 1997 Proposed Tech Specs,Modifying Defueled TS 3.1.3 to Allow Util to Continue W/Implementation of Ynps Decommissioning Plan Which Has Been Incorporated Into Ynps FSAR ML20126E7601992-12-21021 December 1992 Permanently Defueled Tech Specs ML20055D4031990-06-25025 June 1990 Proposed Tech Specs Re Changes in Safety Injection Tank Min Water Inventory ML20043E6231990-05-31031 May 1990 Proposed Tech Specs 3.10.3 & 3.10.4 Re Limiting Conditions for Operation ML20034B3071990-04-19019 April 1990 Proposed Tech Specs Re HPSI & LPSI Pump Surveillance Frequency ML20042E2211990-04-12012 April 1990 Proposed Tech Specs,Addressing Administrative Changes ML20006A4651990-01-18018 January 1990 Proposed Tech Specs Re HPSI Throttle & Pressurizer Auxiliary Spray Mods & Surveillance Requirements for ECCS ML20005F1431990-01-0505 January 1990 Proposed Tech Specs Re Instrumentation Sys ML19332D1161989-11-22022 November 1989 Proposed Tech Specs Incorporating Wording from Generic Ltr 84-13 Which Removes Table 3.7.4 Re safety-related Mechanical Snubbers ML20247L3581989-09-14014 September 1989 Proposed Tech Specs Re Limiting Condition for Operation & Surveillance Requirements for Control Rod Insertion Limits, Boron Control,Peak LHGR & Xenon Redistribution Multiplier ML20246M0541989-08-31031 August 1989 Proposed Tech Specs,Modifying Pages 3/4 3-19,Table 3.3-4 & 3/4 3-21,Table 4.3-3,to Add Steam Line Monitors & Primary Vent Stack Noble Gas Monitor to Listing of Radiation Monitoring Instrumentation & Surveillance Requirements ML20247M6321989-07-24024 July 1989 Proposed Tech Specs Re Power Distribution Limits ML20246M0221989-07-12012 July 1989 Proposed Tech Spec Tables 3.3-4, Radiation Monitoring Instrumentation & 4.3-3, Radiation Monitoring Instrumentation Surveillance Requirements ML20244D3841989-04-14014 April 1989 Proposed Tech Specs Re Steam Generator Pressure/Temp Limits, Primary Pump Seal Water Sys,Control Room Emergency Air Cleaning Sys & Sealed Source Contamination ML20246P1401989-03-21021 March 1989 Proposed Tech Specs Adding Snubber DRH-SNB-1 to Table 3.7-4 ML20196B0771988-11-22022 November 1988 Tech Spec Page 3/4 3-2 Inadvertently Omitted from Util 881021 Proposed Change 222 to Tech Specs ML20205L1691988-10-21021 October 1988 Proposed Tech Specs,Removing Description of High Pressurizer Water Level & Modifying Description of Main Coolant Sys High Pressure ML20151Z1871988-08-11011 August 1988 Proposed Tech Spec Changes to Remove Ref to Specific Value of 2,200 Ppm & Provide Generalized Boron Concentration Value & Remove Requirement for Inverse Count Rate Multiplication Measurement After Insertion of Each Five Fuel Assemblies ML20150B0371988-06-27027 June 1988 Proposed Tech Specs,Allowing Installation of Two Piping Mods Necessary for Installation of Enhanced Water Cleanup Sys ML20196K7361988-06-27027 June 1988 Proposed Tech Spec Table 3.6.1, Containment Barriers, Deleting Valve VD-V-752 & Tech Spec 3.4.5.1, Main Coolant Leakage Detection Sys, Adding Operability,Action & Surveillance Requirements for Telltale Level Switch ML20196K1391988-06-27027 June 1988 Proposed Tech Specs Table 3.6-1 ML20196J2831988-06-27027 June 1988 Proposed Tech Specs 3.5.1.e,increasing Nitrogen Supply Pressure to Safety Injection Accumulator to 488 Pounds Per Square Inch Gauge ML20154J5991988-05-19019 May 1988 Proposed Tech Spec 4.9.7.2, Spent Fuel Pit ML20148Q8911988-04-0404 April 1988 Proposed Tech Specs Defining Incore Detection Sys as Combination Sys of Both Fixed & Movable Detectors & Associated Equipment ML20151D0671988-04-0404 April 1988 Proposed Tech Spec Page 3/4 8-10 Re Battery Chargers ML20150E2381988-03-25025 March 1988 Proposed Tech Specs Modifying Containment Isolation Barriers ML20148J2991988-03-25025 March 1988 Proposed Tech Spec Table 3.3-2, ESF Instrumentation & Table 4.3-2, ESF Instrumentation Surveillance Requirements, Reflecting Deleted Modes 5(1) & 5*, Respectively ML20148J2701988-03-23023 March 1988 Proposed Tech Spec 3.1.1.1.2,reflecting Change in Shutdown Margin Switching Temp from 490 to 470 F ML20150C0171988-03-11011 March 1988 Proposed Tech Specs Modifying Section 6.2 & Moving Organization Charts (Figures 6.2-1 & 6.2-2) to Section 501 of FSAR ML20148K1671988-01-15015 January 1988 Proposed Tech Specs,Adding Shipping Cask Liners,Vol Reduction Equipment,Shipping Casks Not for Spent Fuel & Spent Fuel Assembly Nondestructive Test Equipment to Tech Spec 3.9.7 ML20149E8871988-01-0505 January 1988 Proposed Tech Specs,Modifying Tables 3.3-2,3.3-3 & 4.3-2 to Require 18-month Functional Test of First Level Undervoltage Protection for Each of Three 480-volt Emergency Buses ML20149E7271988-01-0505 January 1988 Proposed Tech Spec Figure 6.2.2, Facility Organization, Reflecting Elevated Mgt Concerns Re Security ML20210A5041987-01-29029 January 1987 Proposed Tech Specs Re Extension of Cycle 18 in-core Instrumentation Sys to Cycle 19 ML20213A4431987-01-22022 January 1987 Proposed Tech Specs,Providing Flexibility in Areas Governing Integrity Testing of Steam Generator Tubes ML20215N6281986-10-22022 October 1986 Proposed Tech Spec 4.5.2.b.4,increasing Allowable Open Time for LPSI Min Recirculation Line Valve CS-MOV-532 to 120 Minutes Per Wk ML20197A7611986-10-20020 October 1986 Proposed Tech Specs,Allowing for Performance of 10CFR50.59 Reviews for Future Core Reloads ML20211E8091986-10-0909 October 1986 Proposed Tech Spec Table 4.3-1, Reactor Protective Sys Instrumentation Surveillance Requirements ML20204F7191986-07-31031 July 1986 Proposed Changes to Tech Specs 3.3.3.2,4.2.1.2,4.2.2.1, 4.2.2.2 & 4.2.3.2 Re Operation of in-core Instrumentation Sys ML20211K7501986-06-24024 June 1986 Proposed Changes to Tech Specs to Allow Performance of 10CFR50.59 Reviews for Future Core Reloads ML20151U5571986-02-0505 February 1986 Proposed Tech Specs,Per Generic Ltr 84-43, Reporting Requirements of 10CFR50... & Generic Ltr 85-19, Reporting Requirements on Primary Coolant Iodine Spikes & Supporting LER Sys Mods ML20136J3981986-01-0808 January 1986 Proposed Changes to Tech Spec Table 3.6-1,replacing Manual Containment Isolation Valve W/Blank Flange ML20141G3461986-01-0606 January 1986 Proposed Tech Spec Changes,Permitting Filing of Supplemental Dose & Meteorological Summary Rept within 150 Days of Jan 1 Each Yr ML20138N3131985-10-31031 October 1985 Proposed Tech Spec Changes Per NUREG-0737,Item II.F.1.6, Containment Hydrogen Monitors 1999-04-23
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20206B9211999-04-23023 April 1999 Proposed Defueled Tech Specs Stating That Characterization of Revised Review & Audit Function Remain in Plant TS Rather than Be Transferred to Plant QA Plan ML20205N1821999-03-24024 March 1999 Proposed Tech Specs Deleting Condition 2.C(10) from Plant License ML20204D9031999-03-17017 March 1999 Proposed Tech Specs Section 6.2.2,deleting Overtime Restrictions Currently Incorporated in Ynps TS ML20204E5241999-03-17017 March 1999 Revised Tech Specs,Consolidating Mgt Positions & Transferring Review & Audit Functions to Yankee Decommissioning QA Program ML20204E5701999-03-17017 March 1999 Proposed Tech Specs,Removing Section 6.7, Procedures & Programs & Section 6.9, Record Retention, from TS & Transferring to Yankee Decommissioning QA Program ML20155A2561998-10-15015 October 1998 Proposed Defueled Tech Specs Re Required Frequency of Submittal of Radioactive Effluent Release Rept ML20237E3631998-08-20020 August 1998 Proposed Tech Specs,Removing Definition of Site Boundary from Subsection 1.10 of Definitions & Modifying Subsection 5.1 of Design Features ML20197D4341997-12-31031 December 1997 Rev 1 to Ynps License Termination Plan ML20216E2101997-09-0505 September 1997 Proposed Tech Specs,Modifying Defueled TS 3.1.3 to Allow Util to Continue W/Implementation of Ynps Decommissioning Plan Which Has Been Incorporated Into Ynps FSAR ML20141F6391997-05-15015 May 1997 License Termination Plan for Yankee Nuclear Power Station ML20198G6381997-02-0707 February 1997 Rev 12 to Ynps Off-Site Dose Calculation Manual ML20138Q5301996-10-31031 October 1996 Rev 11 to Off-Site Dose Calculation Manual ML20198S6131993-12-31031 December 1993 Partially Deleted Rev 9 to Edcr 93-303, Vessel Internals Segmentation Component Removal Program 1995 ML20198S5681993-08-0202 August 1993 Partially Deleted Rev 6 to Edcr 93-303, Reactor Vessel Internals Segmentation Component Removal Program 1993 ML20126E7601992-12-21021 December 1992 Permanently Defueled Tech Specs ML20058D8451990-10-29029 October 1990 Separate Rept Re Local Leak Rate Test Results from Core 19/20 Refueling Outage ML20058D8421990-06-30030 June 1990 June 1990 Reactor Containment Bldg Integrated Leak Rate Test & Periodic Local Leak Rate Tests ML20055D4031990-06-25025 June 1990 Proposed Tech Specs Re Changes in Safety Injection Tank Min Water Inventory ML20043E6231990-05-31031 May 1990 Proposed Tech Specs 3.10.3 & 3.10.4 Re Limiting Conditions for Operation ML20034B3071990-04-19019 April 1990 Proposed Tech Specs Re HPSI & LPSI Pump Surveillance Frequency ML20042E2211990-04-12012 April 1990 Proposed Tech Specs,Addressing Administrative Changes ML20006A4651990-01-18018 January 1990 Proposed Tech Specs Re HPSI Throttle & Pressurizer Auxiliary Spray Mods & Surveillance Requirements for ECCS ML20005F1431990-01-0505 January 1990 Proposed Tech Specs Re Instrumentation Sys ML19332D1161989-11-22022 November 1989 Proposed Tech Specs Incorporating Wording from Generic Ltr 84-13 Which Removes Table 3.7.4 Re safety-related Mechanical Snubbers ML20247L3581989-09-14014 September 1989 Proposed Tech Specs Re Limiting Condition for Operation & Surveillance Requirements for Control Rod Insertion Limits, Boron Control,Peak LHGR & Xenon Redistribution Multiplier ML20246M0541989-08-31031 August 1989 Proposed Tech Specs,Modifying Pages 3/4 3-19,Table 3.3-4 & 3/4 3-21,Table 4.3-3,to Add Steam Line Monitors & Primary Vent Stack Noble Gas Monitor to Listing of Radiation Monitoring Instrumentation & Surveillance Requirements ML20247M6321989-07-24024 July 1989 Proposed Tech Specs Re Power Distribution Limits ML20246M0221989-07-12012 July 1989 Proposed Tech Spec Tables 3.3-4, Radiation Monitoring Instrumentation & 4.3-3, Radiation Monitoring Instrumentation Surveillance Requirements ML20244D3841989-04-14014 April 1989 Proposed Tech Specs Re Steam Generator Pressure/Temp Limits, Primary Pump Seal Water Sys,Control Room Emergency Air Cleaning Sys & Sealed Source Contamination ML20244D3931989-04-11011 April 1989 Core 20 Startup Program for Yankee Nuclear Power Station ML20246P1401989-03-21021 March 1989 Proposed Tech Specs Adding Snubber DRH-SNB-1 to Table 3.7-4 ML20196B0771988-11-22022 November 1988 Tech Spec Page 3/4 3-2 Inadvertently Omitted from Util 881021 Proposed Change 222 to Tech Specs ML20205L1691988-10-21021 October 1988 Proposed Tech Specs,Removing Description of High Pressurizer Water Level & Modifying Description of Main Coolant Sys High Pressure ML20151Z1871988-08-11011 August 1988 Proposed Tech Spec Changes to Remove Ref to Specific Value of 2,200 Ppm & Provide Generalized Boron Concentration Value & Remove Requirement for Inverse Count Rate Multiplication Measurement After Insertion of Each Five Fuel Assemblies ML20196K7361988-06-27027 June 1988 Proposed Tech Spec Table 3.6.1, Containment Barriers, Deleting Valve VD-V-752 & Tech Spec 3.4.5.1, Main Coolant Leakage Detection Sys, Adding Operability,Action & Surveillance Requirements for Telltale Level Switch ML20196J2831988-06-27027 June 1988 Proposed Tech Specs 3.5.1.e,increasing Nitrogen Supply Pressure to Safety Injection Accumulator to 488 Pounds Per Square Inch Gauge ML20196K1391988-06-27027 June 1988 Proposed Tech Specs Table 3.6-1 ML20150B0371988-06-27027 June 1988 Proposed Tech Specs,Allowing Installation of Two Piping Mods Necessary for Installation of Enhanced Water Cleanup Sys ML20154J5991988-05-19019 May 1988 Proposed Tech Spec 4.9.7.2, Spent Fuel Pit ML20148Q8911988-04-0404 April 1988 Proposed Tech Specs Defining Incore Detection Sys as Combination Sys of Both Fixed & Movable Detectors & Associated Equipment ML20151D0671988-04-0404 April 1988 Proposed Tech Spec Page 3/4 8-10 Re Battery Chargers ML20148Q4681988-03-31031 March 1988 Rev 2 to Guidance for Development of Simulation Facility to Meet Requirements of 10CFR55.45 ML20150E2381988-03-25025 March 1988 Proposed Tech Specs Modifying Containment Isolation Barriers ML20148J2991988-03-25025 March 1988 Proposed Tech Spec Table 3.3-2, ESF Instrumentation & Table 4.3-2, ESF Instrumentation Surveillance Requirements, Reflecting Deleted Modes 5(1) & 5*, Respectively ML20148J2701988-03-23023 March 1988 Proposed Tech Spec 3.1.1.1.2,reflecting Change in Shutdown Margin Switching Temp from 490 to 470 F ML20150C0171988-03-11011 March 1988 Proposed Tech Specs Modifying Section 6.2 & Moving Organization Charts (Figures 6.2-1 & 6.2-2) to Section 501 of FSAR ML20154L9791988-03-0606 March 1988 Rev 6 to Yankee Nuclear Power Station Offsite Dose Calculation Manual ML20148K1671988-01-15015 January 1988 Proposed Tech Specs,Adding Shipping Cask Liners,Vol Reduction Equipment,Shipping Casks Not for Spent Fuel & Spent Fuel Assembly Nondestructive Test Equipment to Tech Spec 3.9.7 ML20149E7271988-01-0505 January 1988 Proposed Tech Spec Figure 6.2.2, Facility Organization, Reflecting Elevated Mgt Concerns Re Security ML20149E8871988-01-0505 January 1988 Proposed Tech Specs,Modifying Tables 3.3-2,3.3-3 & 4.3-2 to Require 18-month Functional Test of First Level Undervoltage Protection for Each of Three 480-volt Emergency Buses 1999-04-23
[Table view] |
Text
-
8803300230 880329 PDR ADOCK 05000029 DCD P
~
P TA8LE 3 3-2 ENGINEERED SAFECUARDS SYSTEM INSTRUMENTATION
~
MINIM'JM TOTAL NO.
CIIANNEL3 CIIANNELS OF CllANNELS AND SENSORS AND SENSORS APPLICABLE OPERABLE MODES ACTION AND SENSORS TO TRIP FUNCTIONAL UNIT 1.
SAFETY INJECTION 1(3),2(3),3(2)(3) 10 Actuation Channel #1 1
1 1
a.
1(3), 2(3), 3(2)(3)
- 1) RPS Low Main Coolant -
10 1
1 1
Ioop 1 Pressure Channel 1(3), 2(3), 3(2)(3) 10
- 2) liigh Containment 1
1 1
Pressure Sensor
, 3) Manual Initiation 1
1 1
1, 2, 3, 4, 5'(1) 10 w
b.
Actuation Channel #2 1
1 1
1(3), 2(3), 3( }( }
10 Ioop 2 Pressure Channel 1
1 1
1(3), 2(3), 3(2)(3) 10
- 1) RPS Low Main Coolant -
- 2) liigh Containment
~
1 1
1 1(3), 2(3), 3(2)(3) 10 Pressure Sensor
- 3) Manual Initiation 1
1 1
1, 2, 3, 4, 5(1) 10 l
2.
CONTAItCIENT ISOLATION 2
1 1
1,2,3,4, 10 a.
Manual Initiation y
i 1
1 1,2,3,4 10 y-b.
Actuation Channel A g
- 1) liigh Containment 1
1 1
1,2,3,4 10 Pressure Sensor 5
(All Safety Injection Initiating Functions and Requiremento)
- 2) Safety Injection
.w Z
j TABLE 3.3-2 (Continued)
Y' ENCINEERING SAFECUARDS SYSTER INSTRUMENTATION b
MINIMUM TOTAL NO.
CHANNELS CHANNELS OF CIIANNELS AND SENSORS AND SENSORS APFLICABLE FUNCTIONAL UNIT AND SYNSORS TO TRIP OPERABLE MODES ACTION 2.
CONTAINMENT ISOLATION (Continued) c.
Actuation Channel 5 1
1 1
1,2,3,4 10 1)
High Containment 1
1 1
1,2,3,4 10 Pressure Sensor 2)
Safety injection (All Safety Injection Initiating Functions and Requirements) v 30 3.
MAIN STEAM ISOLATION 1,2,3(2) a.
Low Steam Line Pressure 3/ Steam Line 2/ Steam Line 3/ Steam Line 5
1,2,3(2) 8 b.
Automatic Trip Logic 2
1 2
c.
Manual Initiation 2
1 2
1, 2 8
d.
High Containment Pressure 2
1 2
1, 2 8
Trip containment Isolation g
4 LOSS OF POWER h.
480 Volt Emergency Bus 2/ Bus 2/ Bus 2/ Bus 1, 2, 3 22**
g Degraded Voltage o
Y.
?
I
~
TABLE 4.3-2 s
ENGItfEERED SAFECtf ARDS SYSTEM It{STittRIENTATION
~
b SU RVEILLAriCE IIEqtilitDil.ti rS I
61 CIIANNEL MODES IN WilICil CilANNEL CilANNEL FU tiCTIONAL SURVEILLANCE e
CIIECK UALIBRATION TEST REQUTI.ED FUNCTIONAL UNIT 1.
SAFETY INJECTION Actuation Channel #1 S
N.A.
M(1) 1, 2, 34 a.
- 1) RPS low liiin Coolant --
loop 1 Pressure Channel S
R(3)
M 1, 2, 3,f t
- 2) High Containment S
R(3)
M(3) 1, 2, 34 Pressure Sensor
- 3) finnual Initiation U.A.
N.A.
R 1, 2, 3, 4, 5
Actuation Channel #2 S
N.A.
M(1) 1, 2, 3 #
O
- 1) RPS Low Itiin Coolant -
Loop 2 Pressure Channel S
R(3)
H 1, 2, 3 P
- 2) litgh Containment S
R(3)
M(3) 1, 2, 3*
Pressure, Sensor
- 3) liinual Initiation N.A.
N.A.
R 1, 2, 3, 4, 5*
~
%e 2.
CONTAltMdNT ISOLATION 3-a.
Manual Initiation N.A.
N.A.
R 1,2,3,4 b.
Actuation Channel A S
N. A.
M(4) 1, 2, 3, 4
- 1) liigh Containment Preasure Sensor S
N.A.
M(3) 1, 2, 3, 4
- 2) Safety Injection
( All Safety Injection Surveillance Requirements)
g TABLE 4.3-2 (Continued) k m
ENGINEERED SAFECUARDS SYSTEM INSTRUMENTATION M
SURVEILLANCE REQUIREMENTS 8
c m
CHANNEL MODES IN WHICM CHANNEL CHANNEL FUNCTIONAL SURVEILLANCE FUNCTIONAL UNIT CIIECK CALIBRATION TEST REQUIRED 2.
CONTAINHENT ISOLATION (Continued) c.
Actuation Channel B S
NA M(4) 1, 2, 3, 4 1)
High Containment S
R(3)
M(3) 1, 2, 3, A Pressure Sensor 2)
Safety Injection (All Safety Injection Surveillance Requirements) 3.
MAIN STEAM ISOLATION Y
G a.
Low Steam Line Pressure S
R(3)
M(3) 1, 2 b.
Automatic Trip Logic NA NA Q
1, 2 c.
Manual Initiation NA NA R
1, 2 d,
High Containment Pressure NA NA R
1, 2 4.
LOSS OF POWER
.I 480 Volt Emergency Bus NA R
M 1,2,3 E.
Degraded Voltage a
Dn 1
=
.