ML20149E887

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs,Modifying Tables 3.3-2,3.3-3 & 4.3-2 to Require 18-month Functional Test of First Level Undervoltage Protection for Each of Three 480-volt Emergency Buses
ML20149E887
Person / Time
Site: Yankee Rowe
Issue date: 01/05/1988
From:
YANKEE ATOMIC ELECTRIC CO.
To:
Shared Package
ML20149E882 List:
References
NUDOCS 8801140039
Download: ML20149E887 (4)


Text

. .. _ = .

(.

~

TABLE 3.3-2 (CONTINUED)

ENGINEERING S gEGUARDS SYSTEM INSTRUMENTATION en S- TOTAL NUFBER CHANNELS MINIMUM CHANNELS

$ OF CHANNELS AND SENSORS AND SENSORS . APPLICABLE

. . :o ' FUNCTIONAL UNIT AND SENSCRS- TO TRIP OPERABLE MODES ACTION E

2. CONTAINMENT ISOLATION (Continued)
c. Actuation Channel B 1 1 1 1,2,3,4,5(1) 10 (1) High Containment 1 1 1 1,2,3,4,5(1) 10 Pressure Sensor (2) Safety Injection (All Safety Injection Initiating Functions and Requirements) v D 3. MAIN STEAM ISOLATION v

- .L a. Low Steam Line Pressure 3/ Steam Line 2/ Steam Line 3/ Steam Line 1, 2, 3(2) 6**

b.. Automatic Trip Logic 2 1 2 1, 2, 3(2) 8 i

c. Manual Initiation 2 1 2 1, 2 8
d. High Containment 2 1 2 1, 2 8 Pressure 3

Trip Containment Isolation 4

S 4. LOSS OF POWER

8. 480 VOLT EMERGENCY BUS 2

S a. Loss of Voltage (First Level) 1/ Bus 1/ Bus 1/ Bus 1, 2, 3 23

b. Degraded Voltage (Second Level) 2/ Bus 2/ Bus 2/ Bus 1, 2, 3. 22**

i b 8801140039 880105 W

ACTION STATEMENTS (continued)

23. With the number of OPERABLE channels or sensors one less than the total l number of channels or sensors, restore the inoperable bus to operable '

status within eight hours or be in at least HOT STANDBY within the next six hours and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

l l

l l

YANKEE R0WE 3/4 3-13A Amendment No.

i' TABLE 3.3-3 (Continued)

ENGINEERED SAFECUARDS SYSTEM INSTRUMENTATION TRIP SETPOINTS FUNCTIONAL UNIT TRIP SETPOINT

4. LOSS OF POWER 480 Volt Emergency Bus (a) Loss of Voltage (First Level) 1.8 1 0.20 seconds after Emergency Bus No. 1, 2, 3 voltage drops to ZERO volts from >420 volts 3.0 0.33 seconds after

'Ioltage decreases to 276 volts (b) Degraded Voltage (Second Level)

1. 480 V Bus 4-1, Bus 5-2, Bus 6-3 429 4.5 Volts Time Delay 10 il Seconds
2. 480 V Emergency Bus No. 1, Emergency 421 14 5 Volts Bus No. 2, Emergency Bus No. 3 Time Delay 10 il Seconds i

i i.

l l

I l

l YANKEE R0WE 3/4 3-14A Amendment No.JP6 I

I l

- _ . , . . _ - - ,, _. . . - ._,.. . . . . . - _ _ . _ _ . - . .1

s .

~

TABLE 4.3-2 (CONTINUED)

Y ENGINEERED SAFEGUARDS SYSTEM INSTRUMENTATION 5- SURVEILLANCE REQUIREMENTS U

n CHANNEL MODES IN MIICII E CIIANNEL CHANNEL FUNCTIONAL SURVEILLANCE

" FUNCTIONAL UNIT CIIECK CALIBRATION TEST REQUIRED

2. CONTAINMENT ISOLATION (Continued)
c. Actuation Channel B S NA M(4) 1, 2, 3, 4, 5*

(1) liigh Containment S R(3) M(3) 1, 2, 3, 4, 5*

Pressure Sensor (2) Safety Injection (All Safety Injection Surveillance Requirements)

M

  1. 3. MAIN STEAM ISOLATION Y

(n a. Low Steam Line Pressure S R(3) M(3) 1, 2

b. Automatic Trip Logic NA NA Q 1, 2
c. Manual Initiation NA NA R 1, 2
d. liigh Containment NA NA R 1, 2 Pressure E 4. LOSS OF POWER 9 430 VOLT EMERGENCY BUS
a. Loss of Voltage (First Level) NA R R 1, 2, 3 f b. Degraded Voltage (Second Level) NA R M 1,2,3 s

3 u

N