ML20133K449

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec Table 3.6-1,adding Two Containment Isolation Valves for Compliance W/Tech Spec 3/4.6.2 Which Requires Type C Tests for Valves
ML20133K449
Person / Time
Site: Yankee Rowe
Issue date: 10/15/1985
From:
YANKEE ATOMIC ELECTRIC CO.
To:
Shared Package
ML20133K448 List:
References
NUDOCS 8510220027
Download: ML20133K449 (1)


Text

__

e g

TABLE 3.6-1 (Continued)

CONTAINMENT ISOLATION VALVES N

T TESTABLE DURING VALVE NUMBER FUNCTION PLANT OPERATION ISOLATION TIME (Yes or No)

(Seconds)

C.

MANUAL VALVES (Continued)

PR-V-610 Main Coolant Heise Pressure Gauge NA NA PU-V-543 Purification System Containment Sump Suction NA NA PU-V-544 Purification System Containment Sump Suction NA NA SI-V-701*

SI to Alternate SG Feed NA NA i

EBF-MOV-557*

Alternate SG Feed NA NA 5

8' VD-V-1157*

IISS to Alternate SG Feed NA NA MS-V-627***

Main Steam Bypass NA NA MS-V-628***

Main Steam Bypass NA NA MS-V-629***

Main Steam Bypass NA NA MS-V-630***

Main Steam Bypass NA NA

'AS-V-719*

Emergency Feed Pump Steam Supply NA NA AS-V-720*

Steam Drain NA NA 8'>

MS-MOV-659*

Atmospheric St6am Dump NA NA y

MS-MOV-670*

Atmospheric Steam Dump NA NA UO E,

MS-MOV-681*

Atmospheric Steam Dump NA NA g

R MS-MOV-692*

Atmospheric Steam Dump NA NA 8

BA-V-61 Containment Breathing Air NA NA

[

BA-V-63 Containment Breathing Air NA NA Ott:

QC3 Not subject to Type C tests.

Valve may be open for a 4-hour period during secondary plant heat-up and pressure equalization in Modes 2 and 3.

Not subject to Type C tests.