ML20133K449
| ML20133K449 | |
| Person / Time | |
|---|---|
| Site: | Yankee Rowe |
| Issue date: | 10/15/1985 |
| From: | YANKEE ATOMIC ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20133K448 | List: |
| References | |
| NUDOCS 8510220027 | |
| Download: ML20133K449 (1) | |
Text
__
e g
TABLE 3.6-1 (Continued)
CONTAINMENT ISOLATION VALVES N
T TESTABLE DURING VALVE NUMBER FUNCTION PLANT OPERATION ISOLATION TIME (Yes or No)
(Seconds)
C.
MANUAL VALVES (Continued)
PR-V-610 Main Coolant Heise Pressure Gauge NA NA PU-V-543 Purification System Containment Sump Suction NA NA PU-V-544 Purification System Containment Sump Suction NA NA SI-V-701*
SI to Alternate SG Feed NA NA i
EBF-MOV-557*
Alternate SG Feed NA NA 5
8' VD-V-1157*
IISS to Alternate SG Feed NA NA MS-V-627***
Main Steam Bypass NA NA MS-V-628***
Main Steam Bypass NA NA MS-V-629***
Main Steam Bypass NA NA MS-V-630***
Main Steam Bypass NA NA
'AS-V-719*
Emergency Feed Pump Steam Supply NA NA AS-V-720*
Steam Drain NA NA 8'>
MS-MOV-659*
Atmospheric St6am Dump NA NA y
MS-MOV-670*
Atmospheric Steam Dump NA NA UO E,
MS-MOV-681*
Atmospheric Steam Dump NA NA g
R MS-MOV-692*
Atmospheric Steam Dump NA NA 8
BA-V-61 Containment Breathing Air NA NA
[
BA-V-63 Containment Breathing Air NA NA Ott:
QC3 Not subject to Type C tests.
Valve may be open for a 4-hour period during secondary plant heat-up and pressure equalization in Modes 2 and 3.
Not subject to Type C tests.