Category:INSPECTION REPORT
MONTHYEARIR 05000445/19990151999-10-20020 October 1999 Insp Repts 50-445/99-15 & 50-446/99-15 on 990822-1002. Non-cited Violations.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000445/19990141999-09-14014 September 1999 Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000445/19990131999-08-18018 August 1999 Insp Repts 50-445/99-13 & 50-446/99-13 on 990720-23.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000445/19990101999-08-12012 August 1999 Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628. Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Engineering & Plant Support IR 05000445/19990121999-07-29029 July 1999 Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990111999-06-22022 June 1999 Insp Repts 50-445/99-11 & 50-446/99-11 on 990418-0529.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000445/19990081999-06-0909 June 1999 Insp Repts 50-445/99-08 & 50-446/99-08 on 990503-11.Noncited Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990091999-05-12012 May 1999 Insp Repts 50-445/99-09 & 50-446/99-09 on 990419-23.No Violations Noted.Major Areas Inspected:Reviewed Implementation of Liquid & Gaseous Radioactive Waste Effluent Mgt Program IR 05000445/19990071999-05-11011 May 1999 Insp Repts 50-445/99-07 & 50-446/99-07 on 990307-0417.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000445/19990061999-04-30030 April 1999 Insp Repts 50-445/99-06 & 50-446/99-06 on 990329-0402.No Violations Noted.Major Areas Inspected:Planning & Preparation,External Exposure Controls & Quality Assurance of Radiation Protection Activities IR 05000445/19990031999-04-0707 April 1999 Insp Repts 50-445/99-03 & 50-446/99-03 on 990124-0306.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990051999-03-19019 March 1999 Insp Repts 50-445/99-05 & 50-446/99-05 on 990222-26.One Violation Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radioactive Matls Transportation Programs IR 05000445/19990011999-03-0909 March 1999 Insp Repts 50-445/99-01 & 50-446/99-01 on 990208-12.No Violations Noted.Major Areas Inspected:Licensed Operator Requalification Program IR 05000445/19990021999-01-10010 January 1999 Insp Repts 50-445/99-02 & 50-446/99-02 on 990119-22.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000445/19980081998-12-30030 December 1998 Insp Repts 50-445/98-08 & 50-446/98-08 on 981025-1205.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Licensee Emergency Response Organization IR 05000445/19980071998-11-19019 November 1998 Insp Repts 50-445/98-07 & 50-446/98-07 on 980913-1024.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000445/19980151998-11-19019 November 1998 Insp Repts 50-445/98-15 & 50-446/98-15 on 981102-06.No Violations Noted.Major Areas Inspected:Radiation Program Activities,Including External & Internal Exposure Controls & Controls of Radioactive Matl & Contamination IR 05000445/19980161998-10-29029 October 1998 Insp Repts 50-445/98-16 & 50-446/98-16 on 981019-23.No Violations Noted.Major Areas Inspected:Testing & Maint, Protected Area Barrier & Detection Aids,Vital Area Barriers & Detection Aids & Security Sys Power Supply IR 05000445/19980141998-10-21021 October 1998 Insp Repts 50-445/98-14 & 50-446/98-14 Has Been Canceled.No Insp Rept Will Be Issued IR 05000445/19980061998-09-30030 September 1998 Insp Repts 50-445/98-06 & 50-446/98-06 on 980802-0912.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000445/19980121998-09-16016 September 1998 Insp Repts 50-445/98-12 & 50-446/98-12 Cancelled IR 05000445/19980051998-08-20020 August 1998 Insp Repts 50-445/98-05 & 50-446/98-05 on 980621-0801.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000445/19980041998-07-16016 July 1998 Insp Repts 50-445/98-04 & 50-446/98-04 on 980510-0620.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000445/19983011998-07-10010 July 1998 Insp Repts 50-445/98-301 & 50-446/98-301 on 980619-26.No Violations Noted.Major Areas Inspected:Operations.All 9 License Applicants Passed Exam IR 05000445/19980031998-07-0202 July 1998 Insp Repts 50-445/98-03 & 50-446/98-03 on 980329-0509. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000445/19980131998-06-26026 June 1998 Insp Repts 50-445/98-13 & 50-446/98-13 on 980615-19.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program IR 05000445/19980021998-04-24024 April 1998 Insp Repts 50-445/98-02 & 50-446/98-02 on 980215-0328. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H3501998-04-16016 April 1998 Insp Repts 50-445/98-11 & 50-446/98-11 on 980323-27.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000445/19980011998-03-19019 March 1998 Insp Repts 50-445/98-01 & 50-446/98-02 on 980104-0214. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19970211998-02-11011 February 1998 Errata to Insp Repts 50-445/97-21 & 50-446/97-21,correcting Errors in Insp follow-up Sys Number Associated W/Items Described in Rept IR 05000445/19970231998-01-30030 January 1998 Insp Repts 50-445/97-23 & 50-446/97-23 on 971123-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20198S1891998-01-16016 January 1998 Insp Repts 50-445/97-20 & 50-446/97-20 on 971012-1122. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20199H0241997-11-21021 November 1997 Insp Repts 50-445/97-18 & 50-446/97-18 on 970831-1011. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000445/19970221997-11-17017 November 1997 Insp Repts 50-445/97-22 & 50-446/97-22 on 971103-07.No Violations Noted.Major Areas Inspected:Maint ML20199E6481997-11-13013 November 1997 Insp Repts 50-445/97-21 & 50-446/97-21 on 971027-31.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program Including Records & Repts,Test & Maint and Access control-vehicle IR 05000445/19970191997-10-10010 October 1997 Insp Repts 50-445/97-19 & 50-446/97-19 on 970922-25. Violations Noted.Major Areas Inspected:Rev 25 to Comanche Peak Steam Electric Emergency Plan ML20211A1051997-09-19019 September 1997 Insp Repts 50-445/97-17 & 50-446/97-17 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19970161997-08-13013 August 1997 Insp Repts 50-445/97-16 & 50-446/97-16 on 970722-25.No Violations Noted.Major Areas Inspected:Insp of Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures ML20151L9231997-08-0505 August 1997 Insp Repts 50-445/97-15 & 50-446/97-15 on 970608-0719. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20149L3361997-07-25025 July 1997 Corected Pages 13,17,19,22,28 & Page 2 of Supplemental Info for Insp Repts 50-445/97-12 & 50-446/97-12 Issued on 970611 IR 05000445/19970141997-06-30030 June 1997 Insp Repts 50-445/97-14 & 50-446/97-14 on 970427-0607. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20148K2851997-06-11011 June 1997 Insp Repts 50-445/97-12 & 50-446/97-12 on 970421-0502. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000445/19970061997-06-0606 June 1997 Insp Repts 50-445/97-06 & 50-446/97-06 on 970428-0502. Violations Noted.Major Areas Inspected:Operations & Plant Support & Assessment of Licensed Operator Requalification Program ML20148F8791997-06-0303 June 1997 Insp Repts 50-445/97-09 & 50-446/97-09 on 970317-21. Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000445/19970131997-05-21021 May 1997 Insp Repts 50-445/97-13 & 50-446/97-13 on 970428-0502.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program IR 05000445/19970081997-05-21021 May 1997 Insp Repts 50-445/97-08 & 50-446/97-08 on 970316-0426.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000445/19970011997-05-21021 May 1997 Insp Repts 50-445/97-01 & 50-446/97-01 on 970127-31,0428 & 0502.No Violations Noted.Major Areas Inspected:Licensee self-assessment Effort IR 05000445/19970101997-05-20020 May 1997 Insp Repts 50-445/97-10 & 50-446/97-10 on 970421-25.No Violations Noted.Major Areas Inspected:Plant Support ML20148B5891997-05-0808 May 1997 Insp Repts 50-445/97-11 & 50-446/97-11 on 970407-10.No Violations Noted.Major Areas Inspected:Plant Support,Solid Radwaste Mgt & Radioactive Matls Transportation Programs IR 05000445/19970071997-04-16016 April 1997 Insp Repts 50-445/97-07 & 50-446/97-07 on 970324-27.No Violations Noted.Major Areas Inspected:Plant Support 1999-09-14
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000445/19990151999-10-20020 October 1999 Insp Repts 50-445/99-15 & 50-446/99-15 on 990822-1002. Non-cited Violations.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000445/19990141999-09-14014 September 1999 Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000445/19990131999-08-18018 August 1999 Insp Repts 50-445/99-13 & 50-446/99-13 on 990720-23.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000445/19990101999-08-12012 August 1999 Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628. Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Engineering & Plant Support IR 05000445/19990121999-07-29029 July 1999 Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990111999-06-22022 June 1999 Insp Repts 50-445/99-11 & 50-446/99-11 on 990418-0529.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000445/19990081999-06-0909 June 1999 Insp Repts 50-445/99-08 & 50-446/99-08 on 990503-11.Noncited Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990091999-05-12012 May 1999 Insp Repts 50-445/99-09 & 50-446/99-09 on 990419-23.No Violations Noted.Major Areas Inspected:Reviewed Implementation of Liquid & Gaseous Radioactive Waste Effluent Mgt Program IR 05000445/19990071999-05-11011 May 1999 Insp Repts 50-445/99-07 & 50-446/99-07 on 990307-0417.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000445/19990061999-04-30030 April 1999 Insp Repts 50-445/99-06 & 50-446/99-06 on 990329-0402.No Violations Noted.Major Areas Inspected:Planning & Preparation,External Exposure Controls & Quality Assurance of Radiation Protection Activities IR 05000445/19990031999-04-0707 April 1999 Insp Repts 50-445/99-03 & 50-446/99-03 on 990124-0306.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990051999-03-19019 March 1999 Insp Repts 50-445/99-05 & 50-446/99-05 on 990222-26.One Violation Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radioactive Matls Transportation Programs IR 05000445/19990011999-03-0909 March 1999 Insp Repts 50-445/99-01 & 50-446/99-01 on 990208-12.No Violations Noted.Major Areas Inspected:Licensed Operator Requalification Program IR 05000445/19990021999-01-10010 January 1999 Insp Repts 50-445/99-02 & 50-446/99-02 on 990119-22.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000445/19980081998-12-30030 December 1998 Insp Repts 50-445/98-08 & 50-446/98-08 on 981025-1205.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Licensee Emergency Response Organization IR 05000445/19980071998-11-19019 November 1998 Insp Repts 50-445/98-07 & 50-446/98-07 on 980913-1024.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000445/19980151998-11-19019 November 1998 Insp Repts 50-445/98-15 & 50-446/98-15 on 981102-06.No Violations Noted.Major Areas Inspected:Radiation Program Activities,Including External & Internal Exposure Controls & Controls of Radioactive Matl & Contamination IR 05000445/19980161998-10-29029 October 1998 Insp Repts 50-445/98-16 & 50-446/98-16 on 981019-23.No Violations Noted.Major Areas Inspected:Testing & Maint, Protected Area Barrier & Detection Aids,Vital Area Barriers & Detection Aids & Security Sys Power Supply IR 05000445/19980141998-10-21021 October 1998 Insp Repts 50-445/98-14 & 50-446/98-14 Has Been Canceled.No Insp Rept Will Be Issued IR 05000445/19980061998-09-30030 September 1998 Insp Repts 50-445/98-06 & 50-446/98-06 on 980802-0912.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000445/19980121998-09-16016 September 1998 Insp Repts 50-445/98-12 & 50-446/98-12 Cancelled IR 05000445/19980051998-08-20020 August 1998 Insp Repts 50-445/98-05 & 50-446/98-05 on 980621-0801.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000445/19980041998-07-16016 July 1998 Insp Repts 50-445/98-04 & 50-446/98-04 on 980510-0620.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000445/19983011998-07-10010 July 1998 Insp Repts 50-445/98-301 & 50-446/98-301 on 980619-26.No Violations Noted.Major Areas Inspected:Operations.All 9 License Applicants Passed Exam IR 05000445/19980031998-07-0202 July 1998 Insp Repts 50-445/98-03 & 50-446/98-03 on 980329-0509. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000445/19980131998-06-26026 June 1998 Insp Repts 50-445/98-13 & 50-446/98-13 on 980615-19.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program IR 05000445/19980021998-04-24024 April 1998 Insp Repts 50-445/98-02 & 50-446/98-02 on 980215-0328. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H3501998-04-16016 April 1998 Insp Repts 50-445/98-11 & 50-446/98-11 on 980323-27.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000445/19980011998-03-19019 March 1998 Insp Repts 50-445/98-01 & 50-446/98-02 on 980104-0214. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19970211998-02-11011 February 1998 Errata to Insp Repts 50-445/97-21 & 50-446/97-21,correcting Errors in Insp follow-up Sys Number Associated W/Items Described in Rept IR 05000445/19970231998-01-30030 January 1998 Insp Repts 50-445/97-23 & 50-446/97-23 on 971123-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20198S1891998-01-16016 January 1998 Insp Repts 50-445/97-20 & 50-446/97-20 on 971012-1122. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20199H0241997-11-21021 November 1997 Insp Repts 50-445/97-18 & 50-446/97-18 on 970831-1011. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000445/19970221997-11-17017 November 1997 Insp Repts 50-445/97-22 & 50-446/97-22 on 971103-07.No Violations Noted.Major Areas Inspected:Maint ML20199E6481997-11-13013 November 1997 Insp Repts 50-445/97-21 & 50-446/97-21 on 971027-31.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program Including Records & Repts,Test & Maint and Access control-vehicle IR 05000445/19970191997-10-10010 October 1997 Insp Repts 50-445/97-19 & 50-446/97-19 on 970922-25. Violations Noted.Major Areas Inspected:Rev 25 to Comanche Peak Steam Electric Emergency Plan ML20211A1051997-09-19019 September 1997 Insp Repts 50-445/97-17 & 50-446/97-17 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19970161997-08-13013 August 1997 Insp Repts 50-445/97-16 & 50-446/97-16 on 970722-25.No Violations Noted.Major Areas Inspected:Insp of Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures ML20151L9231997-08-0505 August 1997 Insp Repts 50-445/97-15 & 50-446/97-15 on 970608-0719. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20149L3361997-07-25025 July 1997 Corected Pages 13,17,19,22,28 & Page 2 of Supplemental Info for Insp Repts 50-445/97-12 & 50-446/97-12 Issued on 970611 IR 05000445/19970141997-06-30030 June 1997 Insp Repts 50-445/97-14 & 50-446/97-14 on 970427-0607. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20148K2851997-06-11011 June 1997 Insp Repts 50-445/97-12 & 50-446/97-12 on 970421-0502. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000445/19970061997-06-0606 June 1997 Insp Repts 50-445/97-06 & 50-446/97-06 on 970428-0502. Violations Noted.Major Areas Inspected:Operations & Plant Support & Assessment of Licensed Operator Requalification Program ML20148F8791997-06-0303 June 1997 Insp Repts 50-445/97-09 & 50-446/97-09 on 970317-21. Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000445/19970131997-05-21021 May 1997 Insp Repts 50-445/97-13 & 50-446/97-13 on 970428-0502.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program IR 05000445/19970081997-05-21021 May 1997 Insp Repts 50-445/97-08 & 50-446/97-08 on 970316-0426.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000445/19970011997-05-21021 May 1997 Insp Repts 50-445/97-01 & 50-446/97-01 on 970127-31,0428 & 0502.No Violations Noted.Major Areas Inspected:Licensee self-assessment Effort IR 05000445/19970101997-05-20020 May 1997 Insp Repts 50-445/97-10 & 50-446/97-10 on 970421-25.No Violations Noted.Major Areas Inspected:Plant Support ML20148B5891997-05-0808 May 1997 Insp Repts 50-445/97-11 & 50-446/97-11 on 970407-10.No Violations Noted.Major Areas Inspected:Plant Support,Solid Radwaste Mgt & Radioactive Matls Transportation Programs IR 05000445/19970071997-04-16016 April 1997 Insp Repts 50-445/97-07 & 50-446/97-07 on 970324-27.No Violations Noted.Major Areas Inspected:Plant Support 1999-09-14
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000445/19990151999-10-20020 October 1999 Insp Repts 50-445/99-15 & 50-446/99-15 on 990822-1002. Non-cited Violations.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000445/19990141999-09-14014 September 1999 Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000445/19990131999-08-18018 August 1999 Insp Repts 50-445/99-13 & 50-446/99-13 on 990720-23.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000445/19990101999-08-12012 August 1999 Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628. Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Engineering & Plant Support IR 05000445/19990121999-07-29029 July 1999 Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19993011999-07-16016 July 1999 Exam Repts 50-445/99-301 & 50-446/99-301 on 990618-24.Exam Results:Six Applicants for Senior Operator Licenses Passed Exams IR 05000445/19990111999-06-22022 June 1999 Insp Repts 50-445/99-11 & 50-446/99-11 on 990418-0529.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000445/19990081999-06-0909 June 1999 Insp Repts 50-445/99-08 & 50-446/99-08 on 990503-11.Noncited Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990091999-05-12012 May 1999 Insp Repts 50-445/99-09 & 50-446/99-09 on 990419-23.No Violations Noted.Major Areas Inspected:Reviewed Implementation of Liquid & Gaseous Radioactive Waste Effluent Mgt Program IR 05000445/19990071999-05-11011 May 1999 Insp Repts 50-445/99-07 & 50-446/99-07 on 990307-0417.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000445/19990061999-04-30030 April 1999 Insp Repts 50-445/99-06 & 50-446/99-06 on 990329-0402.No Violations Noted.Major Areas Inspected:Planning & Preparation,External Exposure Controls & Quality Assurance of Radiation Protection Activities IR 05000445/19990031999-04-0707 April 1999 Insp Repts 50-445/99-03 & 50-446/99-03 on 990124-0306.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990051999-03-19019 March 1999 Insp Repts 50-445/99-05 & 50-446/99-05 on 990222-26.One Violation Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radioactive Matls Transportation Programs IR 05000445/19990011999-03-0909 March 1999 Insp Repts 50-445/99-01 & 50-446/99-01 on 990208-12.No Violations Noted.Major Areas Inspected:Licensed Operator Requalification Program IR 05000445/19990021999-01-10010 January 1999 Insp Repts 50-445/99-02 & 50-446/99-02 on 990119-22.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000445/19980081998-12-30030 December 1998 Insp Repts 50-445/98-08 & 50-446/98-08 on 981025-1205.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Licensee Emergency Response Organization IR 05000445/19980151998-11-19019 November 1998 Insp Repts 50-445/98-15 & 50-446/98-15 on 981102-06.No Violations Noted.Major Areas Inspected:Radiation Program Activities,Including External & Internal Exposure Controls & Controls of Radioactive Matl & Contamination IR 05000445/19980071998-11-19019 November 1998 Insp Repts 50-445/98-07 & 50-446/98-07 on 980913-1024.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000445/19980161998-10-29029 October 1998 Insp Repts 50-445/98-16 & 50-446/98-16 on 981019-23.No Violations Noted.Major Areas Inspected:Testing & Maint, Protected Area Barrier & Detection Aids,Vital Area Barriers & Detection Aids & Security Sys Power Supply IR 05000445/19980141998-10-21021 October 1998 Insp Repts 50-445/98-14 & 50-446/98-14 Has Been Canceled.No Insp Rept Will Be Issued IR 05000445/19980061998-09-30030 September 1998 Insp Repts 50-445/98-06 & 50-446/98-06 on 980802-0912.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000445/19980121998-09-16016 September 1998 Insp Repts 50-445/98-12 & 50-446/98-12 Cancelled IR 05000445/19980051998-08-20020 August 1998 Insp Repts 50-445/98-05 & 50-446/98-05 on 980621-0801.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000445/19980041998-07-16016 July 1998 Insp Repts 50-445/98-04 & 50-446/98-04 on 980510-0620.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000445/19983011998-07-10010 July 1998 Insp Repts 50-445/98-301 & 50-446/98-301 on 980619-26.No Violations Noted.Major Areas Inspected:Operations.All 9 License Applicants Passed Exam ML20236G9321998-07-0202 July 1998 Notice of Violation from Insp on 980329-0509.Violation Noted:Four Examples Were Identified,Where Licensee Failed to Meet Requirement for Design of ECCS Switchover from Refueling Water Storage Tank to Containment Recirculation IR 05000445/19980031998-07-0202 July 1998 Insp Repts 50-445/98-03 & 50-446/98-03 on 980329-0509. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000445/19980131998-06-26026 June 1998 Insp Repts 50-445/98-13 & 50-446/98-13 on 980615-19.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program IR 05000445/19980021998-04-24024 April 1998 Insp Repts 50-445/98-02 & 50-446/98-02 on 980215-0328. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20217F6051998-04-24024 April 1998 Notice of Violation from Insp on 980215-0328.Violations Noted:Corrective Actions Were Not Sufficient to Identify That Excessive Leakage in ECC Sys Check Valves During Unit 1 Cycle 6 Required Unit 1 Safety Injection Pumps Be Started ML20216H3501998-04-16016 April 1998 Insp Repts 50-445/98-11 & 50-446/98-11 on 980323-27.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000445/19980011998-03-19019 March 1998 Insp Repts 50-445/98-01 & 50-446/98-02 on 980104-0214. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20248L8831998-03-19019 March 1998 Notice of Violation from Insp on 980104-0214.Violation Noted:Licensee Failed to Document Heat Related Degredation of Unit 2,Train B Solid State Safeguards Sequencer IR 05000445/19970211998-02-11011 February 1998 Errata to Insp Repts 50-445/97-21 & 50-446/97-21,correcting Errors in Insp follow-up Sys Number Associated W/Items Described in Rept IR 05000445/19970231998-01-30030 January 1998 Insp Repts 50-445/97-23 & 50-446/97-23 on 971123-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 07100012/20110221998-01-16016 January 1998 Notice of Violation from Insp on 971012-1122.Violation Noted:Procedure IPO-005B,rev 2,not Appropriate to Circumstances in That Procedure Did Not Require Pressure Be Maintained Below Rc System Pressure & Temp Limits ML20198S1891998-01-16016 January 1998 Insp Repts 50-445/97-20 & 50-446/97-20 on 971012-1122. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20198R6571998-01-16016 January 1998 Notice of Violation from Insp on 970922-25.Violation Noted: on 961029,licensee Made Changes to Emergency Plan,W/O Commission Approval,That Decreased Effectiveness of Plan & Did Not Continue to Meet Planning Standard 50.47(b)(2) ML20198N2071998-01-14014 January 1998 Notice of Violation from Insp on 970608-0719 & Subsequent Inoffice Reviews Concluded on 971114.Violation Noted: Procedures OPT-102A & 102B Did Not Include Appropriate Quantitative Acceptance Criteria ML20199H0131997-11-21021 November 1997 Notice of Violation from Insp on 970831-1011.Violation Noted:Thermometer IC1473,was Used During Performance of Procedure PPT-SX-7505A on 970807 ML20199H0241997-11-21021 November 1997 Insp Repts 50-445/97-18 & 50-446/97-18 on 970831-1011. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering PNO-IV-97-067, on 971117,medical Emergency Declared in Unit 1 Electrical Switchgear Room.Licensee Issued Stop Work Order for Electrical Maint While Investigation Conducted.Nrc Resident Insp Staff Will Be Following Licensee1997-11-17017 November 1997 PNO-IV-97-067:on 971117,medical Emergency Declared in Unit 1 Electrical Switchgear Room.Licensee Issued Stop Work Order for Electrical Maint While Investigation Conducted.Nrc Resident Insp Staff Will Be Following Licensee PNO-IV-97-066, on 971115,new Fuel Damage Occurred.Licensee Suspended Fuel on-load & Conducting Investigation Into Why Damage Occurred.Licensee Expects Delivery of Replacement Fuel Assembly on 971123.State of Tx Informed1997-11-17017 November 1997 PNO-IV-97-066:on 971115,new Fuel Damage Occurred.Licensee Suspended Fuel on-load & Conducting Investigation Into Why Damage Occurred.Licensee Expects Delivery of Replacement Fuel Assembly on 971123.State of Tx Informed IR 05000445/19970221997-11-17017 November 1997 Insp Repts 50-445/97-22 & 50-446/97-22 on 971103-07.No Violations Noted.Major Areas Inspected:Maint ML20199E6481997-11-13013 November 1997 Insp Repts 50-445/97-21 & 50-446/97-21 on 971027-31.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program Including Records & Repts,Test & Maint and Access control-vehicle PNO-IV-97-061, on 971027,Unit 1 Experienced Main Generator Lockout,Turbine Trip & Reactor Trip from 100% Power.Afw Manually Started Shortly Following Trip,In Anticipation of Automatic Initiation of AFW Sys.State of Tx Informed1997-10-30030 October 1997 PNO-IV-97-061:on 971027,Unit 1 Experienced Main Generator Lockout,Turbine Trip & Reactor Trip from 100% Power.Afw Manually Started Shortly Following Trip,In Anticipation of Automatic Initiation of AFW Sys.State of Tx Informed IR 05000445/19970191997-10-10010 October 1997 Insp Repts 50-445/97-19 & 50-446/97-19 on 970922-25. Violations Noted.Major Areas Inspected:Rev 25 to Comanche Peak Steam Electric Emergency Plan ML20211A1051997-09-19019 September 1997 Insp Repts 50-445/97-17 & 50-446/97-17 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20211A0691997-09-19019 September 1997 Notice of Violation from Insp on 970720-0830.Violation Noted:On 970507,while Performing Procedure OPT-457B,licensed Operator Failed to Close Valve 2-8812A Per Step 8.8 ML20198G1821997-09-12012 September 1997 Notice of Violation from Investigation on 970606.Violation Noted:Mn Shook Submitted Falsified Info to NRC Re Being Denied Access to Nuclear Power Plant as Result of fitness-for-duty Policy 1999-09-14
[Table view] |
Text
- - - - - - - - - - - - - - - - - - - - - - -
,
,
'
l .
.
.
APPENDIX U.S. NUCLEAR REGULATORY COMMISSION
REGION IV
Inspection Report: 50-445/92-53; 50-446/92-53 Operating License: NPF-87 Construction Permit: CPPR-127 Licensee: TV Electric Skyway Tower 400 North Olive Street, L.B. 81 Dallas, Texas 75201 Facility Name: Comanche Peak Steam Electric Station (CPSES), Units 1 and 2 Inspection At: CPSES, Glen Rose, Sommervell County, Texas Inspection Conducted: November 2-6, 1992 Inspectors: L. D. Gilbert, Reactor Inspector, Maintenance Section, Division of Reactor Safety L. E. Ellershaw, Reactor inspector, Maintenance Section, Division of Reactor Safety Approved: M ,
///J b'/C
'
l'. f.~Stetka, Chief, Maintenance Section Date Division of Reactor Safety Jnspection Summary Areas Insoected (Unit 1): Routine, announced inspection of inservice inspection activities, feedback of operational experience information, and followup of previously identified inspection finding Areas Inspected (Unit 21: N. inspection of Unit 2 activities was performe Resultt:
- The inservice inspection program was well documented and effectively implemented, with performance of nondestructive examinations observed to be good (paragraph 1).
- The operational experience information program, with minor exceptions, was well defined and was being implemented (paragraph 2;
)
9212040216 921130
'
PDR ADOCK 05000445 0 PDR I _ - - _ _ - _ _ - - _ _ _ _ - _ _ _ - _ - - _ - _ _ _ _ _ - _ _ _ _
'
.
.
.
,
.
.
..
. Summat/ of Inspection Findinas:
e Violation 445/9204-01 was closed (paragraph 3).
e Inspection Followup Item 445/9231-03; 446/9231-03 was closed '
(paragraph 4).
Attachment:
e Attachmrint 1 - Persons Contacted and Exit Meeting e Attachment 2 - Identification of Evaluated Operational Experience-Reports
. <
l l
l l
1.
l
!
I
- . - . . . _ . , . . _ . _ _ _ , _ _ - _ - _ _ . _ . _ _ .
. _ . _ . . . - ~_ . . _ . . . _
-
.
.
e
.
. .
-3-DETAILS 1 INSERVICE INSPECTION - OBSERVATION (73753)
The objectives of this inspection were to ascertain whether inservice examinations, repair, and replacement of Class 1, 2, and 3 pressure retaining components are performed in accordance with the Technical Specifications, the applicable American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, correspondence between NRR and the licensee concerning relief requests, and requirements imposed by NRC/ industry initiative .1 Discussion The inspectors observed the inservice inspection activities associated with the nondestructive examination of four pipe welds in the safety injection system and a pipe support for the reactor coolant system. The inspectors were informed that no ASME Code Section XI repair or replacement activities had-been scheduled for the outag The inspectors observed liquid penetrant and/or ultrasonic examinations performed on the four pipe welds. Liquid penetrant examinations were performed on three welds that were identified as TBX-1-4103-1. TBX-2-2566-35, and TBX-2-2566-36, using Procedure TX-ISI-11. " Liquid Penetrant Examination,"
Revision 3, and an approved procedure field change request, FC-001. The ultrasonic examinations performed included the calibration and examination of Welds TBX-1-4103-1 and TBX-2-2565-36, using Procedure TX-ISI-207, " Ultrasonic Examination of Similar and Dissimilar Metal Welds in Austenitic Stainless Steel Piping Systems,"' Revision 1. The inspectors also observed the visual inspection, VT-3 of Pipe Support TBX-1-4109-HS, using Procedure TX-ISI-8,
" Visual Examination," Revision The inspectors verified that the examinations were performed using approved procedures and qualified personnel certified as Level 11 examiners for the nondestructive examination method used. For the liquid penetrant examinations, the inspectors also verified that procedure limitations were met for surface temperature and penetrant material contaminants. For that portion of the ultrasonic examination observed by the inspectors, the ultrasonic-system was calibrated, the temperature of the calibration block and component was measured, the distance amplitude curves were established, and the examination covered the required volume. The examinations were observed to be performed in full accordance with the requirements of the nondestructive examination procedures and the 1986 edition of Section XI of the ASME Cod The inspectors also reviewed the Comanche Peak Steam Electric Station 10-Year Inservice Inspection Plan, Revision 1 and Interim Change Request No. ISI-Rl-001, and verified that examinations were-accom)11shed as scheduled for the current inspection perio During this review, tie inspectors noted that the issuance of the inservice inspection plan and changes thereto was
}
'
.
"
.
.
..
-4-performed by document control. The responsibilities for review, approval, and distribution of the plan and changes were specified in Procedure STA-703,
" Inservice Inspection Program," Revision In reviewing the approval status of the inservice inspection plan for the first interval, which covers the period from February 8, 1990, to February 8, 2000, the inspectors determined that Revision 0 of the plan was approved by an NRR Safety Evaluation dated October 1,1992. The licensee issued Revision 1 to the plan on August 25, 1992, which was submitted to NRR on September 14, 199 .2 Conclusions The inservice inspection program was well documented and effectively implemented. Performance of nondestructive examinations were judged to be goo FEEDBACK OF OPERATIONAL EXPERIENCE INFORMATION (90700)
The purpose of this inspection was to determine the effectiveness of the licensee's program to assess and disseminate operational experience information pertinent to plant safety, which originated outside the organizatio .1 Proaram Verification The plant analysis group is responsible for the program, which is controlled and described in Nuclear Overview Department Procedure NQA 2.30, " Industry dated August 20, Operating Experience 1992, through Document Report Change Review Program,"
Notice (DCN) Revision 01 dated Octo 1,ber 30, 199 This procedure provided the specific details regarding the receipt, prioritization, tracking, evaluating, and closure of industry operating experience reports (10ERs), such as information notices received from the NRC, and the various categories of 10ERs received from the institute of Nuclear Power-Operations (INP0). The methodology specified for performing evaluations, making recommendations, obtaining technical review and approval, and verifying that recommended actions have been completed, was well planne The inspectors noted a minor procedural weakness in that it did not provide an escalation policy for those instances where requested responses from other organizations were overdue. A management escalation policy would preclude potential neglect and facilitate timely reviews of received operating experience information. This did not appear to be a problem at present,-in that there were currently six 10ERs overdue, with the oldest being 3-months late. The inspectors * review of the 10ERs determined that there was no urgency associated with any of the si Revision 1 to Procedure NQA 2.30 was considered a major revision with a number of program enhancements, including (1) the establishment of a review of the effectiveness of the program's implementation and (2) a review of recurring significant event reports with a concurrent evaluation of the effectiveness of
--
, .
.
.
.
.
-5-corrective and areventivu actions previously taken in response to 10ER assessments. 11e procedure addressed the performance of an effectiveness review of significant operating event report (50ER) implementation by the independent safety engineering group (ISEG) manager. The procedure further provided that the effectiveness review could be limited to the 75 SOER recommendations categorized by INP0 in their document, INPO 91-007, as being
"of such a nature or importance that they should be retained and reviewed on an on-going basis." The inspectors were informed that ISEG had performed a Unit 2 completions assessment, which included a section that addressed a review of the 75 SOER recommendations, with 47 receiving a detailed revie These efforts were documented in ISEG Assessment Report No. IAR 92-09, dated September 25, 1992, which was reviewed by the inspectoe Station Administration Manual Procedure STA-509, " Commitment Tracking System,"
Revision 6 dated June 1,1992, established the guidelines and general format for the commitment tracking system (CTS), which was utilized to ensure that all commitments, whether regulatory or internal, are satisfied and maintaine The use of the CTS for 10ERs, such as NRC information notices and certain categories of INP0 reports, was part of a major enhancement to the process when Revision 1 to Procedure NQA 2.30 was issue .2 Proaram Implementation Procedure NQA 2.30 referenced Section 1.C.5 in NRC Document HUREG-0737,
" Clarification of THI Action Plan Requirements."Section I.C.5, " Procedures for feedback Of Operating Experience To Plant Staff." required each licensee to establish procedures pertaining to specific elements of an operating experience feedback program. One element required that periodic internal audits be performed to assure that the operating experience feedback program functions effectively at all levels. The inspectors requested information to support the licensee's accomplishment of internal audits in this are Operations Quality Assurance Audit Report QAA-91-104, "Nonconformance and Corrective Action Program," which was performed during January 28 through February 7, 1991, was provided to the inspectors. The inspectors review of the report revealed that it was an assessment of the corrective action process in terms of plant incident evaluations, root cause analysis, industry operating experience reviews, and in-house operating and trending data. The inspectors considered the audit to be an in-depth assessment of the progra The audit's conclusion determined that the program was satisfactory and was being implemented as required. Three observations were identified in the areas of tracking, assuring timely completion of recommended actions, and utilization of lessons learned. The inspectors noted that procedure revisions have addressed these concern Review of audit schedules and frequencies showed that the industry operating experience review program is on a biennial audit frequency and is currently scheduled for the first quarter of 199 The inspectors reviewed the "10ER Log Sheet" in order to determine the status-of 10ERs and to make a selection of both open and closed reports to evaluate program implementation (see Attachment 2). A total of eight closed reports, including five NRC information notices, two INP0 significant event
._ - ._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
,
-
i
.
.
.
.
i 6-
.
reports (SERs), and ono )otential 10 CFR Part 21 report, were selected and reviewed in terms of tecinical assessments, responses from cognizant individuals and grou)s, and establishment of internal commitments and their incorporation into tie CTS. The inspectors also verified that the committed actions had been implemented by review of documentation associated with those actions (e.g., preventive maintenance tasks, procedural revisions, training
. The inspectors also selected lesson plans, that seven reports andwere training shownattendance to be open, sheets)luding inc one NRC information notice, one INP0 operating plant experience report, one INP0 SER, and four INP0 SOERs. The purpose for selecting open reports was to verify that they were being actively tracked and that actions / evaluations were in-process. The inspectors also noted that the four SOERs had been previously closed, but recently reopened with respect to Unit 2. Several review efforts had been undertaken, including ISEG's assessment (IAR 92-09) and plant analysis'
September / October 1992 10ER Review, to assess 10ER completion status and potential impact on Unit These reviews determined that certain recommendations contained in eight SOERs had been closed based on actions taken with respect to Unit 1, but consideration had not been given towards Unit I and 2 differences. Therefore, those specific recommendations were reopened and are awaiting actions such as development of preventive maintenance procedures, test procedures, completion of baseline data, and training activitie These items, considered highly visible by management, were 5eing tracked by plant analysis as part of their normal functio Procedure HQA 2.30 required the issuance of a monthly report, "Open 10ER Recommendations," to senior station management in which the status of all open 10ER recommendations were to be presented. The inspectors reviewed the monthly reports for July, August, and September 1992, and found them to be consistent and accurat The inspectors also reviewed the background and technical qualifications of the plant analysis personnel responsible for performing assessms_ts and <
evaluations of incoming 10ERs and determined that all of the personnel were well qualifie The inspectors noted a proactive posture with respect to the 10ER progra One example had to do with a review, by plant analysis, of 10ERs applicable'to refueling outages and the compilation of " lessons learned" into a document which became part of the refueling manual being used for the current Unit I refueling outage (IRF02).
2.3 Conclusions With the exception of the minor procedural weakness noted in paragraph 2.1, the inspectors considered the 10ER program to be well defined and to be effectively implemented. As previously noted, the program recently underwent a major revision, which included a number of program enhancements -
I g -
.v
-
. .,.-e-+r -+e ,,-..--,-e .~.e+ , r v -.. , -m a- -.m, -rv -m
- - - - - - - - - - - - - - - - - - - - - - - - --
.
'
.
.
.
-
.
-7- r 3 FOLLOWUP DN CORRECTIVE ACTION FOR A VIOLATION (92702)
1[losed) Violttion 445/9204-01: Failure to Scan the Weld in Both Circumferential Directions durina Ultrasonic Examination of a Pioina Weld for Inigrvice Insocction The inspectors reviewed ONE form FX92-155 and the corrective actions taken by the licensee in response to the violation. The corrective actions included the re-examination of the weld during the second Unit I refueling outage and the review of all examination data sheets performed during Unit I refueling outage by a TV Electric Level 111 inspector to ensure all incomplete :
examinations are documented on limitation sheets. The inspectors witnessed the satisfactory ultrasonic examination of the weld on November 4,1992, in addition, the inspectors reviewed the corrective actions taken to preclude recurrence, which included an audit of the inservice ins)ection and testing programs and two surveillance activities documented by tie independent safety engineering group. The audit and surveillance activities were documented in TV Electric Operations QA Audit Report QAA-92-123 and Independent Safety Engineering Group Field Note Sheets ISEG-FN-267 and 270. The corrective actions were satisfactorily completed by the date specified in the response to the violatio FOLLOWUP (92701)
(Closedi_Jainsction followuo item 445/9231-03: 446/9231-03: Review of Licensee's Actions Recardino Generation. Trackina and leolementation of Internal Commitm6nts Associated With Industry Operatina Experience Report The inspectors reviewed Nuclear Overview Department Procedure HQA 2.30,
' Industry Operating Experience Report Review Program," Revision 1 dated August 14, 1992. This revision established the responsibilities and requirements for tracking internal commitments resulting from operating experience information in the commitment tracking syste The inspectors selected 15 10ERs - 8 closed and 7 open - (see Attachment 2)
and verified that the internal commitments initiated as a result of the 10ERs had been entered into the commitment tracking system and had been, or were being, tracked. The inspectors also verified that-the actions required by closed internal commitments had been implemented. Based on'the-results of the inspectors' review, it appears that the licensee had implemented the requirements established by Revision 1 to Procedure NQA 2.3 _- - __
,
.
.
s ATTACHMENT 1 1 PERSONS CONTACTED 1.1 Licensee Personngl
- L. Bradshaw, Stipulation Activities
- H. Bruner, Senior Vice President
- H. Blevins, Director of Nuclear Overview .
- D. Davis, Manager, Plant Analysis
- D Dillinger, Staff Engineer
- N. Harris, Licensing Engineer
- K. Kirwin, Senior Engineer
- F. Hadden, Manager, Hechanical Engineering
- R. Hays, Supervisor, Hechanical Codes and Standards
- D. McAfee, Manger, Quality Assurance
- J. Huffett, Manager, Design
- D. Pendleton, Unit 2 Regulatory Services Manager
- D. Ranstrom, Quality Engineering Supervisor
- C. Rau, Unit 2 Project Manager
- W._Riess, Special Projects Supervisor
- H. Riggs, Special Projects Manager
- C. Terry, Vice President, Nuclear Engineering and Support 1.2 Stone & Webster Enaineerina Company
- J. DeBouis, Codes and Standards, ISI
- F. Maggio, Special Projects 1.3 (ASE
- 0. Thero, Consultant 1.3 NRC Personnel
- Jones, Senior Resident inspector
- D. Graves Senior Resident inspector
- P. Goldberg, Reactor Inspector
- H. Runyan. Reactor Inspector >
- R. Vickrey, Reactor inspector
- Denotes those personnel who attended the exit meeting conducted November 6, 199 EXIT HEETING-An exit meeting was conducted on November 6, 1992. -During this meeting, the inspectors reviewed the scope and findings of the inspection. The_ licensee did not identify as proprietary, any information provided to, or reviewed by
,
the inspectors.
'
.
.
.
. - -
ATTACHMENT 2 IDENTIFICATION OF EVALUATED 10ERs CLOSED SER 24-91 SER 25-91 IN 89-92 Supplement 1 IN 90-49 IN 91-13 IN 91-82 IN 92-43 10 CFR Part 21 Report from Fisher Controls dated March 5, 1991 OPEN IN 91-83 OE 5088 SER 05-92 SOER 86-03 SOER 88 03 SOER 89-Oi SOER 90-01
,