ML20133Q023
From kanterella
ML20133Q023 | |
Person / Time | |
---|---|
Site: | Comanche Peak |
Issue date: | 08/06/1985 |
From: | NRC |
To: | |
Shared Package | |
ML20133Q021 | List: |
References | |
NUDOCS 8508140578 | |
Download: ML20133Q023 (4) | |
Similar Documents at Comanche Peak | |
---|---|
Category:SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES
MONTHYEARML20212F7671999-09-24024 September 1999
[Table view]SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i) ML20210D8321999-07-23023 July 1999 Safety Evaluation Accepting Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20209H7661999-07-15015 July 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20196L0191999-07-0808 July 1999 Safety Evaluation Granting Request Relief B-6 (Rev 2),B-7 (Rev2),B-12,B-13,B-14 & C-9,pursuant to 10CFR50.55a(g)(6)(i).Technical Ltr Rept Also Encl ML20209G7501999-07-0808 July 1999 SER Finding That Licensee Individual Plant Exam of External Events Complete with Regard to Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given Design, Operation & History of Comanche Peak Steam Electric Station ML20196J0621999-06-29029 June 1999 Safety Evaluation Supporting Proposed Changes to Emergency Plan Re Licenses NPF-87 & NPF-89 Respectively ML20206Q0091999-05-14014 May 1999 Safety Evaluation Accepting GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Electric Station,Unit 1 ML20206H2061999-05-0606 May 1999 SER Accepting Exemption to App K Re Leading Edge Flowmeter for Plant,Units 1 & 2 ML20203A4881999-02-0303 February 1999 Safety Evaluation Granting Requests for Relief B-3 - B-6,C-2 & C-3 for Plant,Unit 2 ML20202D0101999-01-27027 January 1999 Safety Evaluation Supporting First 10-yr Interval ISI Program Plan Requests for Relief B-9,B-10 & B-11 for CPSES, Unit 1 ML20154B5741998-09-30030 September 1998 Safety Evaluation Re Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Motor-Operated Valves. Licensee Has Established Acceptable Program ML20237C4061998-08-14014 August 1998 Safety Evaluation Supporting Request to Implement Risk Informed IST Program ML20135B7911996-11-29029 November 1996 Safety Evaluation Approving Corporate Restructuring of TU to Facilitate Acquisition of Enserch Corp ML20128C1721993-01-29029 January 1993 Safety Evaluation Accepting First 10-yr Interval Inservice Testing Program for Pumps & Valves ML20198D3331992-05-0606 May 1992 Safety Evaluation Supporting Licensee Response to Generic Ltr 82-33 Concerning Implementation of Reg Guide 1.97,rev 2 ML20235U5631989-02-24024 February 1989 Safety Evaluation Concluding That Stated 10CFR70 License Conditions Should Be Incorporated Into 10CFR50 License ML20153C8171988-08-25025 August 1988 Safety Evaluation Supporting Corrections to Amends 9 & 8 to CPPR-126 & CPPR-127,respectively ML20236A5741987-10-13013 October 1987 Safety Evaluation Re Util 850502 Request to Eliminate Arbitrary Intermediate Pipe Breaks.Request Acceptable Provided Applicant Maintains Environ Qualification of safety-related Mechanical & Electrical Equipment ML20214X1801987-06-0808 June 1987 Safety Evaluation Supporting Modified Design Basis Documented in Amend 61 ML20214T7661987-05-28028 May 1987 Handwritten Sser on Allegation Re Qa/Qc Repair,Rework & Maint ML20214J7221986-08-15015 August 1986 SER on Tdi Diesel Generator Owners Group Findings & Recommendations Re Operability/Reliability of Tdi Emergency Diesel Generators ML20141P2181986-03-13013 March 1986 Evaluation Approving Use of ASME Code Cases N-397 & N-411. Applicant Must Investigate Root Cause by Considering Physical Mods Made to Piping Sys & Indicate Extent to Which Issues Resolved as Result of Revised Analyses Using Cases ML20210S8041986-02-18018 February 1986 Marked-up SER Re Rev 3 to Comanche Peak Response Team Program Plan ML20133H9021985-08-0606 August 1985 Sser of Qualifications & Training of Operators & Adequacy of Extant Training Programs to Maintain Operator Readiness. Training Programs Acceptable,Barring Major Problems ML20133Q0231985-08-0606 August 1985 Mechanical Engineering Branch Sser Re Inservice Testing of Pumps & Valves.Program for Pumps & Valves Acceptable ML20133Q0281985-07-12012 July 1985 SER Supporting Pump & Valve Inservice Testing Program ML20128L8791985-07-0101 July 1985 SER Re Conformance of post-accident Monitoring Design,Per Reg Guide 1.97,Rev 2 Re Emergency Response Capabilities. Neutron Flux Instrumentation Must Be Provided Before Fuel Loading ML20199G4531985-03-19019 March 1985 Partially Withheld marked-up Rev 5 to Sser Re Allegation AQ-91 Concerning Inadequate Training of Personnel.Related Info Encl ML20215K6461985-03-15015 March 1985 Partially Deleted Draft Sser Providing Results of Staff Evaluation & Resolution of Approx 400 Technical Concerns & Allegations in Mechanical & Piping Area Re Constr Practices at Plant ML20199G6201985-03-13013 March 1985 Partially Withheld marked-up Rev 4 to Sser Re Allegation AQ-98 Concerning Extensive Delays in Repair of safety-related Matl ML20199G7751985-01-22022 January 1985 Partially Withheld marked-up Rev 1 to Sser Re Allegation AQ-41 Concerning Sandblasted Pipe Sections Which Removed Heat Markings Used for Traceability.Related Info Encl ML20206U9251984-12-19019 December 1984 Partially Withheld Rev 1 to Sser Re Allegation AE-17, Alleging Field Run Conduit,Drywall & Lighting Installed Above Ceiling Panels in Control Room Classified as Nonseismic ML20206U6351984-12-19019 December 1984 Partially Withheld Rev 1 to Sser Re Allegations AQC-13, AQC-14,AQC-15,AC-18 & AC-40,alleging Unauthorized & Undocumented Holes Drilled Through Reinforcing Steel ML20206U9351984-12-19019 December 1984 Partially Withheld Draft 7 to Sser Re Allegation AC-41 Concerning Poor Workmanship in Use of Elastic Joint Filler Matl Between Seismic Category I Structures.Related Documentation Encl ML20199G6301984-11-0101 November 1984 Partially Withheld marked-up Rev 3 to Sser Re Allegation AQ-131 Concerning Electrical Boxes That Were Shipped to Facility in Damaged Condition or Were Damaged & Repaired by Unauthorized Personnel.Related Info Encl ML20199G6141984-10-0505 October 1984 Partially Withheld marked-up Rev 2 to Sser Re Allegation AQ-88 Concerning safety-related Work Performed by Illegal Aliens ML20199G6241984-10-0202 October 1984 Partially Withheld marked-up Draft 4 to Sser Re Allegation A-130 Concerning Valve Disc Numbers on Repair Travelers That Differ from Code Data Rept ML20202B9301983-08-10010 August 1983 SER Supporting Generic Westinghouse Mod for Reactor Trip Sys Automatic Actuation Using Shunt Coil Trip Attachments W/ Listed exceptions.Plant-specific Design Info Required for Westinghouse Plants Incorporating Shunt Trip Mod Encl 1999-09-24 Category:TEXT-SAFETY REPORT MONTHYEARML20217E8021999-10-0707 October 1999
[Table view]CPSES Unit 1 Cycle 8 Colr ML20217G4151999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 ML20212F7671999-09-24024 September 1999 SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i) ML20216J5701999-09-16016 September 1999 Rev 2 to CPSES Unit 2 Cycle 5 Colr TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Cpses.With ML20211M2981999-08-0606 August 1999 Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1 ML20210U4081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 ML20210D8321999-07-23023 July 1999 Safety Evaluation Accepting Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20209H7661999-07-15015 July 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20209H2721999-07-0909 July 1999 2RF04 Containment ISI Summary Rept First Interval,First Period,First Outage ML20209H2631999-07-0909 July 1999 2RF04 ISI Summary Rept First Interval,Second Period,Second Outage ML20209G7501999-07-0808 July 1999 SER Finding That Licensee Individual Plant Exam of External Events Complete with Regard to Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given Design, Operation & History of Comanche Peak Steam Electric Station ML20196L0191999-07-0808 July 1999 Safety Evaluation Granting Request Relief B-6 (Rev 2),B-7 (Rev2),B-12,B-13,B-14 & C-9,pursuant to 10CFR50.55a(g)(6)(i).Technical Ltr Rept Also Encl ML20210J9391999-06-30030 June 1999 CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20209G0801999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 ML20196J0621999-06-29029 June 1999 Safety Evaluation Supporting Proposed Changes to Emergency Plan Re Licenses NPF-87 & NPF-89 Respectively ML20195G5141999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With ML20216E0711999-05-21021 May 1999 1999 Graded Exercise - Comanche Peak Steam Electric Station ML20206Q0091999-05-14014 May 1999 Safety Evaluation Accepting GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Electric Station,Unit 1 ML20206H2061999-05-0606 May 1999 SER Accepting Exemption to App K Re Leading Edge Flowmeter for Plant,Units 1 & 2 ML20196L2241999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2 ML20205R5701999-04-14014 April 1999 Rev 6 to ER-ME-067, TU Electric Engineering Rept,Evaluation of Thermo-Lag Fire Barrier Sys ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20205J7831999-04-0101 April 1999 Rev 0 to ERX-99-001, CPSES Unit 2 Cycle 5 Colr ML20205N3101999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2 ML20204H6371999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2 ML20205N1481999-02-28028 February 1999 Corrected Monthly Operating Rept for Feb 1999 for CPSES, Units 1 & 2 ML20203A4881999-02-0303 February 1999 Safety Evaluation Granting Requests for Relief B-3 - B-6,C-2 & C-3 for Plant,Unit 2 ML20210J9201999-02-0101 February 1999 CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802- 990201 ML20202D0101999-01-27027 January 1999 Safety Evaluation Supporting First 10-yr Interval ISI Program Plan Requests for Relief B-9,B-10 & B-11 for CPSES, Unit 1 ML20199E9961998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Cpses,Units 1 & 2 ML20207D6091998-12-31031 December 1998 1998 Annual Operating Rept for Cpses,Units 1 & 2. with ML20197K2371998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Cpses,Units 1 & 2 ML20195F3161998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Cpses,Units 1 & 2 ML20154M8841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Cpses,Units 1 & 2 ML20154B5741998-09-30030 September 1998 Safety Evaluation Re Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Motor-Operated Valves. Licensee Has Established Acceptable Program ML20151W0361998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Cpses,Units 1 & 2. with ML20151Q1211998-08-14014 August 1998 Rev 0 to Control of Hazard Barriers ML20237C4061998-08-14014 August 1998 Safety Evaluation Supporting Request to Implement Risk Informed IST Program ML20237C6721998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Cpses,Units 1 & 2 ML20236V3121998-07-29029 July 1998 Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem ML20236R0711998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Cpses,Units 1 & 2 ML20249B2581998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Cpses,Units 1 & 2 ML20248A1671998-05-22022 May 1998 Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731 ML20247G3241998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Cpses,Units 1 & 2 ML20216B8661998-04-0101 April 1998 Rev 0 to ERX-98-001, CPSES Unit 1 Cycle 7 Colr ML20216J3061998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Cpses,Units 1 & 2 ML20216J1861998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Comanche Peak Steam Electric Station ML20197A6951998-02-24024 February 1998 Inservice Insp Summary Rept,First Interval,Second Period, First Outage ML20199J5391998-02-0202 February 1998 CPSES Commitment Matl Change Evaluation Rept 0002 for 960202-970801 1999-09-30 |