Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20212F76724 September 1999SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i)Incorporated by reference
ML20210D83223 July 1999Safety Evaluation Accepting Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment InspCoatings
Moisture barrier
ML20209H76615 July 1999Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2Safe Shutdown
Power-Operated Valves
ML20196L0198 July 1999Safety Evaluation Granting Request Relief B-6 (Rev 2),B-7 (Rev2),B-12,B-13,B-14 & C-9,pursuant to 10CFR50.55a(g)(6)(i).Technical Ltr Rept Also EnclIncorporated by reference
Liquid penetrant
ML20209G7508 July 1999SER Finding That Licensee Individual Plant Exam of External Events Complete with Regard to Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given Design, Operation & History of Comanche Peak Steam Electric StationSafe Shutdown
High winds
Fire Barrier
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Earthquake
ML20196J06229 June 1999Safety Evaluation Supporting Proposed Changes to Emergency Plan Re Licenses NPF-87 & NPF-89 RespectivelySevere Accident Management Guideline
ML20206Q00914 May 1999Safety Evaluation Accepting GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Electric Station,Unit 1Fire Barrier
ML20206H2066 May 1999SER Accepting Exemption to App K Re Leading Edge Flowmeter for Plant,Units 1 & 2Probabilistic Risk Assessment
Exemption Request
Power change
ML20203A4883 February 1999Safety Evaluation Granting Requests for Relief B-3 - B-6,C-2 & C-3 for Plant,Unit 2VT-2
Incorporated by reference
ML20202D01027 January 1999Safety Evaluation Supporting First 10-yr Interval ISI Program Plan Requests for Relief B-9,B-10 & B-11 for CPSES, Unit 1VT-2
Liquid penetrant
ML20154B57430 September 1998Safety Evaluation Re Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Motor-Operated Valves. Licensee Has Established Acceptable ProgramStroke time
ML20237C40614 August 1998Safety Evaluation Supporting Request to Implement Risk Informed IST ProgramSafe Shutdown
Boric Acid
High winds
Stroke time
Internal Flooding
Probabilistic Risk Assessment
Incorporated by reference
Large early release frequency
Earthquake
ML20135B79129 November 1996Safety Evaluation Approving Corporate Restructuring of TU to Facilitate Acquisition of Enserch Corp
ML20128C17229 January 1993Safety Evaluation Accepting First 10-yr Interval Inservice Testing Program for Pumps & Valves
ML20198D3336 May 1992Safety Evaluation Supporting Licensee Response to Generic Ltr 82-33 Concerning Implementation of Reg Guide 1.97,rev 2
ML20235U56324 February 1989Safety Evaluation Concluding That Stated 10CFR70 License Conditions Should Be Incorporated Into 10CFR50 License
ML20153C81725 August 1988Safety Evaluation Supporting Corrections to Amends 9 & 8 to CPPR-126 & CPPR-127,respectively
ML20236A57413 October 1987Safety Evaluation Re Util 850502 Request to Eliminate Arbitrary Intermediate Pipe Breaks.Request Acceptable Provided Applicant Maintains Environ Qualification of safety-related Mechanical & Electrical Equipment
ML20214X1808 June 1987Safety Evaluation Supporting Modified Design Basis Documented in Amend 61
ML20214T76628 May 1987Handwritten Sser on Allegation Re Qa/Qc Repair,Rework & Maint
ML20214J72215 August 1986SER on Tdi Diesel Generator Owners Group Findings & Recommendations Re Operability/Reliability of Tdi Emergency Diesel GeneratorsLiquid penetrant
ML20141P21813 March 1986Evaluation Approving Use of ASME Code Cases N-397 & N-411. Applicant Must Investigate Root Cause by Considering Physical Mods Made to Piping Sys & Indicate Extent to Which Issues Resolved as Result of Revised Analyses Using Cases
ML20210S80418 February 1986Marked-up SER Re Rev 3 to Comanche Peak Response Team Program PlanSafe Shutdown
Safe Shutdown Earthquake
Hydrostatic
Coatings
Earthquake
ML20133H9026 August 1985Sser of Qualifications & Training of Operators & Adequacy of Extant Training Programs to Maintain Operator Readiness. Training Programs Acceptable,Barring Major Problems
ML20133Q0236 August 1985Mechanical Engineering Branch Sser Re Inservice Testing of Pumps & Valves.Program for Pumps & Valves AcceptableStroke time
ML20133Q02812 July 1985SER Supporting Pump & Valve Inservice Testing ProgramBoric Acid
Stroke time
Power-Operated Valves
Power Operated Valves
ML20128L8791 July 1985SER Re Conformance of post-accident Monitoring Design,Per Reg Guide 1.97,Rev 2 Re Emergency Response Capabilities. Neutron Flux Instrumentation Must Be Provided Before Fuel Loading
ML20199G45319 March 1985Partially Withheld marked-up Rev 5 to Sser Re Allegation AQ-91 Concerning Inadequate Training of Personnel.Related Info Encl
ML20215K64615 March 1985Partially Deleted Draft Sser Providing Results of Staff Evaluation & Resolution of Approx 400 Technical Concerns & Allegations in Mechanical & Piping Area Re Constr Practices at Plant
ML20199G62013 March 1985Partially Withheld marked-up Rev 4 to Sser Re Allegation AQ-98 Concerning Extensive Delays in Repair of safety-related MatlHydrostatic
ML20199G77522 January 1985Partially Withheld marked-up Rev 1 to Sser Re Allegation AQ-41 Concerning Sandblasted Pipe Sections Which Removed Heat Markings Used for Traceability.Related Info EnclCoatings
ML20206U92519 December 1984Partially Withheld Rev 1 to Sser Re Allegation AE-17, Alleging Field Run Conduit,Drywall & Lighting Installed Above Ceiling Panels in Control Room Classified as NonseismicSafe Shutdown Earthquake
Earthquake
ML20206U63519 December 1984Partially Withheld Rev 1 to Sser Re Allegations AQC-13, AQC-14,AQC-15,AC-18 & AC-40,alleging Unauthorized & Undocumented Holes Drilled Through Reinforcing Steel
ML20206U93519 December 1984Partially Withheld Draft 7 to Sser Re Allegation AC-41 Concerning Poor Workmanship in Use of Elastic Joint Filler Matl Between Seismic Category I Structures.Related Documentation EnclEarthquake
ML20199G6301 November 1984Partially Withheld marked-up Rev 3 to Sser Re Allegation AQ-131 Concerning Electrical Boxes That Were Shipped to Facility in Damaged Condition or Were Damaged & Repaired by Unauthorized Personnel.Related Info EnclCoatings
Nondestructive Examination
ML20199G6145 October 1984Partially Withheld marked-up Rev 2 to Sser Re Allegation AQ-88 Concerning safety-related Work Performed by Illegal Aliens
ML20199G6242 October 1984Partially Withheld marked-up Draft 4 to Sser Re Allegation A-130 Concerning Valve Disc Numbers on Repair Travelers That Differ from Code Data Rept
ML20202B93010 August 1983SER Supporting Generic Westinghouse Mod for Reactor Trip Sys Automatic Actuation Using Shunt Coil Trip Attachments W/ Listed exceptions.Plant-specific Design Info Required for Westinghouse Plants Incorporating Shunt Trip Mod Encl