ML20071H864

From kanterella
Revision as of 10:21, 23 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Statement of Matl Fact as to Which There Is No Genuine Issue Re Reed Contention 13 on Organizations Requiring SOPs
ML20071H864
Person / Time
Site: Callaway Ameren icon.png
Issue date: 05/20/1983
From: Baxter T
SHAW, PITTMAN, POTTS & TROWBRIDGE, UNION ELECTRIC CO.
To:
Atomic Safety and Licensing Board Panel
Shared Package
ML20071H409 List: ... further results
References
ISSUANCES-OL, NUDOCS 8305250506
Download: ML20071H864 (2)


Text

._ .. .

N.

J

,+ 1 j

. c>

6

1. L Q1 .1- 6
s r

.,8,,%'

4

,dy1983

.gy '20, '

j*%

c$ g UNITED STATES OF AMERIC NUCLEAR REGULATORY COMkt$$1Q @

BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

) . 1 UNION _ ELECTRIC COMPANY ) Docket No. STN 50-483 OL

)

-(Callaway Plant, Unit _1) )

APPLICANT'S STATEMENT OF MATERIAL FACTS

-ON REED _ CONTENTION 13 AS TO WHICH THERE IS NO GENUINE ISSUE TO BE HEARD (ORGANIZATIONS REQUIRING SOPS)

Pursuant _to 10 C.F.R. 5 2.749(a), Applicant states, in support'of its-motion _for summary disposition of intervenor Reed's Contention 13 in'this proceeding, that there is no genuine issue to be heard with respect to the following material facts:

1. There_need not.be separate implementing procedures for each county organization and suborgani~zation assigned an operational role.in the county radiological emergency response .

plans.

2. Functional procedu'es'are-an effective way of pro-viding local organizations with. detailed information'about the K0 4k3

.- PDR

responsibilities assigned to them as well as to other organizations during a radiological emergency, while at the same time minimizing overlapping or redundant and_hence, confusing procedures.

3. The plans for the four counties in the Callaway Plant plume exposure emergency planning zone specify those functional procedures which are necessary to implement-the county plans.
4. Adequate procedures for implementing the four county plans will exist prior to operation of the Callaway Plant above 5% power.

Respectfully submitted, SHAW, PITTMAN, POTTS & TROWBRIDGE Thomas A. Baxter, P.C.

Deborah B. Bauser Counsel.for Applicant 1800 M Street, N.W.

Washington, D.C. 20036 (202) 822-1000 May.20, 1983 ]

i i

4

, . _.