MONTHYEARML20081B6371984-02-29029 February 1984 Analysis of Capsule U from Alabama Power Co Jm Farley Unit 1 Reactor Vessel Radiation Surveillance Program Project stage: Other ML20081B6301984-03-0101 March 1984 Forwards Analysis of Capsule U from Alabama Power Co Jm Farley Unit 1 Reactor Vessel Radiation Surveillance Program Project stage: Other ML20084C1001984-04-20020 April 1984 Proposed Changes to Tech Specs Table 4.4-5,Figures 3.4-2 & 3.4-3 & Bases 3/4.4 Re RCS Pressure & Temp Requirements Project stage: Request ML20084C0981984-04-20020 April 1984 Application for Amend to License NPF-2,changing Tech Specs Table 4.4-5,Figures 3.4-2 & 3.4-3 & Bases 3/4.4 Re RCS Pressure & Temp Requirements.Class II Fee Encl Project stage: Request ML20106C2281984-10-23023 October 1984 Forwards Recent Correspondence Re Pricing of Alabama Electric Cooperative Proportionate Ownership Entitlement,To Assist Staff in Determinations on Cooperative Request for Antitrust Enforcement Action.W/Certificate of Svc Project stage: Request ML20101D3201984-12-13013 December 1984 Forwards Results of Util Review of 831212 Proposed Tech Spec Changes,Per 841107 Request.Meaning of Proposed Changes Not Altered by Errors.Encl Corrected Pages Should Be Incorporated Into Any Subsequent Amends Project stage: Request 1984-02-29
[Table View] |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARL-99-035, Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld1999-10-18018 October 1999 Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld ML20217G0801999-10-0707 October 1999 Informs That on 990930,staff Conducted mid-cycle PPR of Farley & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Will Conduct Regional Insps Associated with SG Removal & Installation ML20217P0661999-10-0606 October 1999 Requests Withholding of Proprietary Rept NSD-SAE-ESI-99-389, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs ML20217B1891999-10-0404 October 1999 Submits Clarification Re Development of Basis for Determining Limiting Internal Pressure Loads Re Review of NRC SE for Cycle 16 Extension Request.Util Intends to Use Guidelines When Evaluating SG Tube Structural Integrity ML20212J8391999-09-30030 September 1999 Forwards RAI Re Request for Amends to Ts.Addl Info Needed to Complete Review to Verify That Proposed TS Are Consistent with & Validate Design Basis Analysis.Request Discussed with H Mahan on 990930.Info Needed within 10 Days of This Ltr ML20212J8801999-09-30030 September 1999 Discusses GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps. Util 980731,990607 & 03 Ltrs Provided Requested Info in Subj Gl.Nrc Considers Subj GL to Be Closed for Unit 1 L-99-032, Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 21999-09-23023 September 1999 Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 2 L-99-034, Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 21999-09-23023 September 1999 Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 2 ML20212F8861999-09-23023 September 1999 Forwards Revised Relief Request Number 32 for NRC Approval. Approval Requested by 991231 to Support Activities to Be Performed During Unit 1 Refueling Outage Scheduled for Spring of 2000 ML20212E7031999-09-23023 September 1999 Responds to GL 98-01, Year 2000 Readiness of Computer Sys at Npps. Util Requested to Submit Plans & Schedules for Resolving Y2K-related Issues ML20212F1111999-09-21021 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals ML20212C2351999-09-16016 September 1999 Submits Corrected Info Concerning Snoc Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20212D0101999-09-15015 September 1999 Informs That Submittal of clean-typed Copy of ITS & ITS Bases Will Be Delayed.Delay Due to Need for Resolution of Two Issues Raised by NRC staff.Clean-typed Copy of ITS Will Be Submitted within 4 Wks Following Resolution of Issues ML20212C4641999-09-13013 September 1999 Forwards Info Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams L-99-031, Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed1999-09-13013 September 1999 Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed ML20212C8041999-09-10010 September 1999 Responds to to D Rathbun Requesting Review of J Sherman Re Y2K Compliance.Latest NRC Status Rept on Y2K Activities Encl ML20212D4581999-09-10010 September 1999 Responds to to D Rathbun,Requesting Review of J Sherman Expressing Concerns That Plant & Other Nuclear Plants Not Yet Y2K Compliant ML20212A6951999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20212A8341999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20211N8041999-09-0808 September 1999 Informs That on 990930 NRC Issued GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Condition, to Holders of Nuclear Plant Operating Licenses ML20211N4301999-09-0808 September 1999 Discusses Proposed Meeting to Discuss Kaowool Fire Barriers. Staff Requesting That Affected Licensees Take Issue on Voluntary Initative & Propose Approach for Resolving Issues ML20212C0071999-09-0202 September 1999 Forwards Insp Repts 50-348/99-05 & 50-364/99-05 on 990627- 0807.No Violations Noted.Licensee Conduct of Activities at Farley Plant Facilities Generally Characterized by safety-conscious Operations & Sound Engineering ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl ML20211K2131999-08-31031 August 1999 Informs That Snoc Has Conducted Review of Reactor Vessel Integrity Database,Version 2 (RVID2) & Conclude That Latest Data Submitted for Farley Units Has Not Been Incorporated Into RVID2 ML20211K4101999-08-31031 August 1999 Resubmits Relief Requests Q1P16-RR-V-5 & Q2P16-RR-V-5 That Seek to Group V661 Valves from Each Unit Into Sample Disassembly & Insp Group,Per 990525 Telcon with NRC L-99-030, Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS1999-08-30030 August 1999 Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS ML20211G6851999-08-26026 August 1999 Informs That During Insp,Technical Issues Associated with Design,Installation & fire-resistive Performance of Kaowool Raceway fire-barriers Installed at Farley Nuclear Plant Were Identified L-99-029, Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 07271999-08-19019 August 1999 Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 0727 ML20211B9431999-08-17017 August 1999 Forwards Fitness for Duty Performance Data for six-month Reporting Period 990101-990630,IAW 10CFR26.71(d).Rept Covers Employees at Jm Farley Nuclear Plant & Southern Nuclear Corporate Headquarters ML20211B9211999-08-17017 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-348/99-09 & 50-364/99-09.Corrective Actions:Security Response Plan Was Revised to Address Vulnerabilities Identified During NRC Insp ML20210R5101999-08-12012 August 1999 Forwards Revised Page 6 to 990430 LAR to Operate Farley Nuclear Plant,Unit 1,for Cycle 16 Only,Based on risk- Informed Approach for Evaluation of SG Tube Structural Integrity,As Result of Staff Comments ML20212C8141999-08-0909 August 1999 Forwards Correspondence Received from Jm Sherman.Requests Review of Info Re Established Policies & Procedures ML20210T2021999-08-0606 August 1999 Forwards Draft SE Accepting Licensee Proposed Conversion of Plant,Units 1 & 2 Current TSs to Its.Its Based on Listed Documents ML20210Q4641999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr to La Reyes,As Listed,With List of Individuals to Take exam,30 Days Before Exam Date ML20210J8341999-07-30030 July 1999 Forwards Second Request for Addl Info Re Util 990430 Amend Request to Allow Util to Operate Unit 1,for Cycle 16 Based on risk-informed Probability of SG Tube Rupture & Nominal accident-induced primary-to-second Leakage ML20210G4901999-07-30030 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, Issued 990603.Ltr Contains NRC License Commitment to Utilize ASTM D3803-1989 with Efficiency Acceptance Criteria Utilizing Safety Factor of 2 L-99-028, Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines1999-07-30030 July 1999 Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines L-99-027, Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.51999-07-27027 July 1999 Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.5 ML20210G8181999-07-26026 July 1999 Forwards Insp Repts 50-348/99-04 & 50-364/99-04 on 990516- 0626.One Violation Identified & Being Treated as Noncited Violation IR 05000348/19990091999-07-23023 July 1999 Discusses Insp Repts 50-348/99-09 & 50-364/99-09 on 990308- 10 & Forwards Notice of Violation Re Failure to Intercept Adversary During Drills,Contrary to 10CFR73 & Physical Security Plan Requirements ML20210E4071999-07-22022 July 1999 Responds to NRC 990702 RAI Re Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described in NEI 97-06, SG Program Guidelines L-99-026, Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments1999-07-19019 July 1999 Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments L-99-264, Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 20011999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 ML20209H4721999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 ML20196J6191999-07-0202 July 1999 Forwards Final Dam Audit Rept of 981008 of Category 1 Cooling Water Storage Pond Dam.Requests Response within 120 Days of Date of Ltr 05000364/LER-1999-001, Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed1999-07-0202 July 1999 Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed ML20196J7471999-07-0202 July 1999 Forwards RAI Re Cycle 16 Extension Request.Response Requested within 30 Days of Date of Ltr ML20196J5781999-07-0202 July 1999 Forwards RAI Re 981201 & s Requesting Amend to TS Associated with Replacing Existing Westinghouse Model 51 SG with Westinghouse Model 54F Generators.Respond within 30 Days of Ltr Date ML20196J6571999-07-0202 July 1999 Discusses Closure to TAC MA0543 & MA0544 Re GL 92-01 Rev 1, Suppl 1,RV Structural Integrity.Nrc Has Revised Rvid & Releasing It as Rvid,Version 2 as Result of Review of Responses ML20196J3591999-06-30030 June 1999 Forwards SE of TR WCAP-14750, RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop Pwrs 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARL-99-035, Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld1999-10-18018 October 1999 Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld ML20217P0661999-10-0606 October 1999 Requests Withholding of Proprietary Rept NSD-SAE-ESI-99-389, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs ML20217B1891999-10-0404 October 1999 Submits Clarification Re Development of Basis for Determining Limiting Internal Pressure Loads Re Review of NRC SE for Cycle 16 Extension Request.Util Intends to Use Guidelines When Evaluating SG Tube Structural Integrity L-99-034, Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 21999-09-23023 September 1999 Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 2 L-99-032, Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 21999-09-23023 September 1999 Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 2 ML20212F8861999-09-23023 September 1999 Forwards Revised Relief Request Number 32 for NRC Approval. Approval Requested by 991231 to Support Activities to Be Performed During Unit 1 Refueling Outage Scheduled for Spring of 2000 ML20212C2351999-09-16016 September 1999 Submits Corrected Info Concerning Snoc Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20212D0101999-09-15015 September 1999 Informs That Submittal of clean-typed Copy of ITS & ITS Bases Will Be Delayed.Delay Due to Need for Resolution of Two Issues Raised by NRC staff.Clean-typed Copy of ITS Will Be Submitted within 4 Wks Following Resolution of Issues L-99-031, Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed1999-09-13013 September 1999 Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed ML20212C4641999-09-13013 September 1999 Forwards Info Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20211K2131999-08-31031 August 1999 Informs That Snoc Has Conducted Review of Reactor Vessel Integrity Database,Version 2 (RVID2) & Conclude That Latest Data Submitted for Farley Units Has Not Been Incorporated Into RVID2 ML20211K4101999-08-31031 August 1999 Resubmits Relief Requests Q1P16-RR-V-5 & Q2P16-RR-V-5 That Seek to Group V661 Valves from Each Unit Into Sample Disassembly & Insp Group,Per 990525 Telcon with NRC L-99-030, Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS1999-08-30030 August 1999 Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS L-99-029, Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 07271999-08-19019 August 1999 Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 0727 ML20211B9431999-08-17017 August 1999 Forwards Fitness for Duty Performance Data for six-month Reporting Period 990101-990630,IAW 10CFR26.71(d).Rept Covers Employees at Jm Farley Nuclear Plant & Southern Nuclear Corporate Headquarters ML20211B9211999-08-17017 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-348/99-09 & 50-364/99-09.Corrective Actions:Security Response Plan Was Revised to Address Vulnerabilities Identified During NRC Insp ML20210R5101999-08-12012 August 1999 Forwards Revised Page 6 to 990430 LAR to Operate Farley Nuclear Plant,Unit 1,for Cycle 16 Only,Based on risk- Informed Approach for Evaluation of SG Tube Structural Integrity,As Result of Staff Comments ML20212C8141999-08-0909 August 1999 Forwards Correspondence Received from Jm Sherman.Requests Review of Info Re Established Policies & Procedures ML20210G4901999-07-30030 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, Issued 990603.Ltr Contains NRC License Commitment to Utilize ASTM D3803-1989 with Efficiency Acceptance Criteria Utilizing Safety Factor of 2 L-99-028, Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines1999-07-30030 July 1999 Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines L-99-027, Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.51999-07-27027 July 1999 Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.5 ML20210E4071999-07-22022 July 1999 Responds to NRC 990702 RAI Re Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described in NEI 97-06, SG Program Guidelines L-99-026, Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments1999-07-19019 July 1999 Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments L-99-264, Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 20011999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 ML20209H4721999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 05000364/LER-1999-001, Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed1999-07-0202 July 1999 Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed L-99-024, Responds to NRC RAI Re Conversion to ITS for Chapters 3.4, 3.5,3.6,3.7,3.9 & 5.0,per 990419-20 Meetings with NRC1999-06-30030 June 1999 Responds to NRC RAI Re Conversion to ITS for Chapters 3.4, 3.5,3.6,3.7,3.9 & 5.0,per 990419-20 Meetings with NRC L-99-025, Forwards Rev 2 to Jfnp Security plan,FNP-0-M-99,IAW 10CFR50.4(b)(4).Attachment 1 Contains Summary of Changes & Amended Security Plan Pages.Encl Withheld from Public Disclosure Per 10CFR73.211999-06-30030 June 1999 Forwards Rev 2 to Jfnp Security plan,FNP-0-M-99,IAW 10CFR50.4(b)(4).Attachment 1 Contains Summary of Changes & Amended Security Plan Pages.Encl Withheld from Public Disclosure Per 10CFR73.21 ML20196J8631999-06-30030 June 1999 Submits Correction to Errors Contained in to NRC Re TS Changes Re Control Room,Penetration Room & Containment Purge Filtration Systems & Radiation Monitoring Instrumentation.Errors Do Not Require Rev of SA L-99-249, Submits Correction to Errors Contained in to NRC Re TS Changes Re Control Room,Penetration Room & Containment Purge Filtration Systems & Radiation Monitoring Instrumentation.Errors Do Not Require Rev of SA1999-06-30030 June 1999 Submits Correction to Errors Contained in to NRC Re TS Changes Re Control Room,Penetration Room & Containment Purge Filtration Systems & Radiation Monitoring Instrumentation.Errors Do Not Require Rev of SA L-99-224, Submits Rev to Unit 2 SG Tube voltage-based Repair Criteria Data Rept.Ltr Contains No Commitments1999-06-0707 June 1999 Submits Rev to Unit 2 SG Tube voltage-based Repair Criteria Data Rept.Ltr Contains No Commitments ML20195F1731999-06-0707 June 1999 Forwards Proprietary & non-proprietary Responses to NRC RAIs Re W TR WCAP-14750, RCS Flow Verification Using Elbow Taps at W 3-Loop Pwrs. W Proprietary Notice,Affidavit & Copyright Notice,Encl.Proprietary Info Withheld L-99-217, Forwards Proprietary & non-proprietary Responses to NRC RAIs Re W TR WCAP-14750, RCS Flow Verification Using Elbow Taps at W 3-Loop Pwrs. W Proprietary Notice,Affidavit & Copyright Notice,Encl.Proprietary Info Withheld1999-06-0707 June 1999 Forwards Proprietary & non-proprietary Responses to NRC RAIs Re W TR WCAP-14750, RCS Flow Verification Using Elbow Taps at W 3-Loop Pwrs. W Proprietary Notice,Affidavit & Copyright Notice,Encl.Proprietary Info Withheld L-99-225, Responds to GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants1999-06-0707 June 1999 Responds to GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants ML20195F0621999-06-0707 June 1999 Submits Rev to Unit 2 SG Tube voltage-based Repair Criteria Data Rept.Ltr Contains No Commitments ML20195E9581999-06-0707 June 1999 Responds to GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants ML20195C6941999-05-28028 May 1999 Forwards Response to NRC RAI Re GL 96-05 for Farley Nuclear Plant.Farley Is Committing to Implement Phase 3 of JOG Program L-99-021, Forwards Response to RAI Re Conversion to ITSs for Chapter 3.3.Attachment II Includes Proposed Revs to Previously Submitted LAR Re Rais,Grouped by RAI number.Clean-typed Copies of Affected ITS Pages Not Included1999-05-28028 May 1999 Forwards Response to RAI Re Conversion to ITSs for Chapter 3.3.Attachment II Includes Proposed Revs to Previously Submitted LAR Re Rais,Grouped by RAI number.Clean-typed Copies of Affected ITS Pages Not Included L-99-203, Forwards Response to NRC RAI Re GL 96-05 for Farley Nuclear Plant.Farley Is Committing to Implement Phase 3 of JOG Program1999-05-28028 May 1999 Forwards Response to NRC RAI Re GL 96-05 for Farley Nuclear Plant.Farley Is Committing to Implement Phase 3 of JOG Program ML20195F2101999-05-24024 May 1999 Requests That Farley Nuclear Plant Proprietary Responses to NRC RAI Re W WCAP-14750, RCS Flow Verification Using Elbow Taps at W 3-Loop Pwrs, Be Withheld from Public Disclosure Per 10CFR2.790 L-99-180, Forwards Responses to NRC RAI Questions for Chapter 3.8 of Ts.Proposed Revs to TS Previously Submitted with LAR Related to RAI1999-04-30030 April 1999 Forwards Responses to NRC RAI Questions for Chapter 3.8 of Ts.Proposed Revs to TS Previously Submitted with LAR Related to RAI ML20206F4321999-04-30030 April 1999 Forwards Responses to NRC RAI Questions for Chapter 3.8 of Ts.Proposed Revs to TS Previously Submitted with LAR Related to RAI L-99-017, Forwards Responses to NRC RAI Questions for Chapters 3.1, 3.2,3.5,3.7 & 3.9 of Ts.Attached Pages Include Proposed Revs Previously Submitted LAR to Rais,Grouped by Chapters & RAI Numbers1999-04-30030 April 1999 Forwards Responses to NRC RAI Questions for Chapters 3.1, 3.2,3.5,3.7 & 3.9 of Ts.Attached Pages Include Proposed Revs Previously Submitted LAR to Rais,Grouped by Chapters & RAI Numbers ML20206C8021999-04-26026 April 1999 Forwards 1998 Annual Rept, for Alabama Power Co.Encls Contain Financial Statements for 1998,unaudited Financial Statements for Quarter Ending 990331 & Cash Flow Projections for 990101-991231 05000348/LER-1998-007, Forwards SG-99-04-001, Farley-1:Final Cycle 16 Freespan ODSCC Operational Assessment, as Committed to in Licensee & LER 98-007-00.Util Is Revising Plant Administrative SG Operating Leakage Requirements as Listed1999-04-23023 April 1999 Forwards SG-99-04-001, Farley-1:Final Cycle 16 Freespan ODSCC Operational Assessment, as Committed to in Licensee & LER 98-007-00.Util Is Revising Plant Administrative SG Operating Leakage Requirements as Listed L-99-015, Forwards Rev 1 to Jfnp Security plan,FNP-O-M-99,resulting from Implementation of Biometrics Sys.Changes Incorporate Changes Previously Submitted to NRC as Rev 28 by Licensee .Encl Withheld,Per 10CFR73.211999-04-21021 April 1999 Forwards Rev 1 to Jfnp Security plan,FNP-O-M-99,resulting from Implementation of Biometrics Sys.Changes Incorporate Changes Previously Submitted to NRC as Rev 28 by Licensee .Encl Withheld,Per 10CFR73.21 ML20206B4391999-04-21021 April 1999 Forwards Corrected ITS Markup Pages to Replace Pages in 981201 License Amend Requests for SG Replacement L-99-172, Forwards FNP Annual Radioactive Effluent Release Rept for 1998, IAW TSs Sections 6.9.1.8 & 6.9.1.9.Changes to ODCM Revs 16,17 & 18 Are Encl,Iaw TS Section 6.14.21999-04-21021 April 1999 Forwards FNP Annual Radioactive Effluent Release Rept for 1998, IAW TSs Sections 6.9.1.8 & 6.9.1.9.Changes to ODCM Revs 16,17 & 18 Are Encl,Iaw TS Section 6.14.2 ML20205S9501999-04-21021 April 1999 Forwards FNP Annual Radioactive Effluent Release Rept for 1998, IAW TSs Sections 6.9.1.8 & 6.9.1.9.Changes to ODCM Revs 16,17 & 18 Are Encl,Iaw TS Section 6.14.2 ML20205R0431999-04-13013 April 1999 Forwards Correction to 960212 GL 95-07 180 Day Response. Level 3 Evaluation for Pressure Locking Utilized Analytical Models.Encl Page Has Been Amended to Correct Error 1999-09-23
[Table view] Category:LEGAL/LAW FIRM TO NRC
MONTHYEARML20055H1341990-07-24024 July 1990 Forwards Decommissioning Rept & Certificate of Financial Assurance ML20055D1651990-06-26026 June 1990 Forwards Endorsement 15 to Maelu Policy M-73 ML20247D7091989-05-0505 May 1989 Forwards Joint Stipulation Re NRC Enforcement of Condition 2 on Plant & Requests That Notice of Violation Be Withdrawn ML20244E0091989-04-0606 April 1989 Forwards Endorsements 69 & 81 to Maelu Policy MF-93 & Nelia Policy NF-238,respectively ML20245A5291989-03-0202 March 1989 Forwards Endorsement 67 to Maelu Policy MF-93 ML20151M8161988-07-27027 July 1988 Provides Update of Status on Settlement Negotiations Between Alabama Power Co & Alabama Electric Cooperative. Requests Addl Extension of Time to Facilitate Possible Fruition of Negotiations ML20151M4221988-07-27027 July 1988 Informs That Since 880617 Serious Settlement Negotiations Have Been Continuously in Progress.Parties Will Submit Further Rept to NRC by 880915 ML20195H1261988-06-17017 June 1988 Requests That Director Affirm Settlement Proposal Negotiated in Matter Re Util Financial Obligations & Bring Matter to Close.Pc Kron Affidavit Encl ML20195J1301988-06-15015 June 1988 Requests NRC to Institute Investigation of Southern Co & Operating & Svc Subsidiaries to Determine Whether Any License Conditions Being Violated.Supporting Documentation Encl ML20154L7231988-05-24024 May 1988 Responds to from Counsel of Alabama Electric Cooperative,Inc Objecting to Alabama Power Co 880125 Proposal to Resolve Issues Re Terms for Sale of Plant. Director Should Affirm Settlement Proposal ML17347A4841987-05-0707 May 1987 Forwards Endorsements 72,104,46,67,83,96 & 59 to Nelia Policies NF-238,NF-215,NF-252,NF-227,NF-185,NF-198 & NF-247 & Endorsements 60,86,27,54,70,82 & 51 to Maelu Policies MF-93,MF-78,MF-108,MF-88,MF-55,MF-66 & MF-102,respectively ML20214D0391986-11-18018 November 1986 Responds to Bouknight in Response to NRC Re Notice of Violation of Antitrust License Condition. Equity Component Rate for AFUDC in Bouknight Ltr Highly Ambiguous ML20215G6481986-10-17017 October 1986 Forwards Us District Court for Northern District of Georgia 860829 Order in Greensboro Lumber Co Vs Georgia Power Co, Contending That Decision Supports Argument Made in Util Response to Notice of Violation ML20211C1251986-10-17017 October 1986 Forwards Reply to Alabama Power Co Response to Notice of Violation of Antitrust License Condition ML20206S2701986-09-17017 September 1986 Notifies of Address Change Effective on 860927.Requests Address on Encl List of Dockets Be Changed ML20154L7501986-08-12012 August 1986 Responds to Matters Raised During Meeting Re Ownership of Plant,Including Wholesale Power Contracts Between Alabama Electric Cooperative (AEC) & Members & AEC Claim That Contracts Accepted by Private Lenders as AEC Loan Security ML20151Z6681986-07-10010 July 1986 Suppls Re Proposal of Terms & Conditions for Employee Interviews at Plant for NRC Investigation of Allegations ML20211C7541986-05-12012 May 1986 Forwards Endorsements,Including Endorsement 75 to Maelu Policy MF-66,Endorsement 88 to Nelia Policy NF-198, Endorsement 44 to Maelu Policy MF-102,Endorsement 51 to Nelia Policy NF-247 & Endorsement 70 to Maelu Policy MF-90 ML20151Z6561986-05-0606 May 1986 Advises That Encl List of Clients Willing to Cooperate W/Nrc Re Investigation of Plant ML20209F1251986-03-28028 March 1986 FOIA Request for Documents Re Jl Smith Complaints,Comments, Inquiries or Requests Concerning Plant & Health Physics Insp During Wk of 860324 ML20137Z5791986-03-11011 March 1986 Requests That Gf Trowbridge Be Replaced as Addressee for NRC Correspondence in Accordance W/Listed Client Facility & Designated Addressee ML17346B1681986-01-0606 January 1986 Forwards Endorsements to Nelia & Maelu Policies,Including Endorsement 22 to Nelia Policy NF-281,Endorsement 15 to Maelu Policy MF-112 & Endorsements 6 to Nelia & Maelu Certificates N-97 & M-97 ML20134M7541985-08-29029 August 1985 Forwards Endorsements 65 & 66 to Nelia Policy NF-238 & Endorsements 54 & 55 to Maelu Policy MF-93 ML20137A8031985-08-0505 August 1985 FOIA Request for Records of ST Doyle,Gap & Bp Garde Complaints,Inquiries & Requests for NRC Action Re Facility or Util ML20117A7331985-05-0101 May 1985 Forwards Endorsement 64 to Nelia Policy NF-238 & Endorsement 53 to Maelu Policy MF-93 ML20100F3821985-03-27027 March 1985 Forwards Endorsement 63 to Nelia Policy NF-238 ML20114B6121985-01-21021 January 1985 Forwards Endorsements 10,14 & 47 to Nelia Policy NF-238 ML20101H1721984-12-20020 December 1984 Forwards Endorsement 5 to Nelia Certificates N-62 & N-73 & Maelu Certificates M-62 & M-73 ML20101G9061984-12-20020 December 1984 Forwards Endorsement 62 to Nelia Policy NF-238 & Endorsement 52 to Maelu Policy MF-93 ML20106C2281984-10-23023 October 1984 Forwards Recent Correspondence Re Pricing of Alabama Electric Cooperative Proportionate Ownership Entitlement,To Assist Staff in Determinations on Cooperative Request for Antitrust Enforcement Action.W/Certificate of Svc ML20093K9811984-10-15015 October 1984 Forwards Memorandum of Alabama Power Co in Response to Request of Alabama Electric Cooperative,Inc for Enforcement Action & Petition of Alabama Power Co for Declaratory Order, Per Util 840629 Request for Enforcement Action ML20093H5281984-10-15015 October 1984 Forwards Memorandum in Response to Request of Alabama Electric Cooperative,Inc for Enforcement Action ML20094C9631984-08-0606 August 1984 Reiterates 840702 Request for Notes,Memoranda or Transcripts of Meetings Between NRC & Util as Referenced in Palladino 840626 Memo ML20094D0661984-08-0606 August 1984 Reiterates 840702 Request for Any Notes or Memoranda or Transcripts of Meetings W/Util Near End of June 1984. Certificate of Svc Encl ML20094C9511984-08-0606 August 1984 Reiterates 840702 Request for Notes,Memoranda or Transcripts of Meetings Between NRC & Util as Referenced in Palladino 840626 Memo ML20090H0901984-07-25025 July 1984 Forwards CR Lowman 840725 Response to Alabama Power Co Re Enforcement Proceeding.Certificate of Svc Encl ML20093H9311984-07-24024 July 1984 Forwards Reply to Alabama Electric Cooperative & DOJ Responses to Commission 840709 Order.Responses Raised New Matters Not Addressed by Util ML20090A7111984-07-10010 July 1984 Forwards to Chairman Palladino & 840629 Request. W/O Encls.Related Correspondence ML20093A5441984-07-0909 July 1984 Forwards 840703 Petition for Declaratory Order,Notices of Appearances & Affidavit of Svc.W/O Encls ML20093A2471984-07-0505 July 1984 Ack Receipt of B Boskey & DB Macguineas Re 840626 Meeting & Request for Enforcement Action.Alabama Electric Cooperative,Inc Ltr Should Be Disregarded & Maneuvers Should Not Be Permitted to Delay Action on 840703 Petition ML20093A3281984-07-0505 July 1984 Comments on Alabama Electric Cooperative,Inc 840629 Request for Enforcement Action on Allegations Re Violation of Antitrust License Condition 2.Request Should Be Held in Abeyance Until Commission Declaratory Order Issued ML20092N8711984-07-0303 July 1984 Forwards Petition for Declaratory Order to Institute Proceedings & Notice of Appearance ML20092N7131984-07-0202 July 1984 Ack Receipt of 840626 Memo Re Meeting W/Representatives of Alabama Power Co.Util 840629 Formal Request for Enforcement Petition Re Alabama Power Co Conduct Encl.Meeting Transcript Requested ML20091A0731984-05-21021 May 1984 Forwards Endorsement 4 to Maelu Policy M-73 ML20084J1871984-05-0202 May 1984 Forwards Endorsement 51 to Maelu Policy MF-93 & Endorsement 61 to Nelia Policy NF-238 ML20087L8341984-03-20020 March 1984 Forwards Endorsements 49 & 50 to Maelu Policy MF-93 & Endorsements 59 & 60 to Nelia Policy NF-238 ML20081C4181984-03-0505 March 1984 Forwards Endorsement 4 to Nelia Certificate N-13 Correcting Name of Insured on Endorsements 2 & 3 ML20086T5411984-02-28028 February 1984 Forwards Endorsement 58 to Nelia Policy NF-238 ML20083F1331983-12-23023 December 1983 Forwards Endorsements 56 & 57 to Nelia Policy NF-238, Endorsements 47 & 48 to Maelu Policy MF-93,Endorsement 4 to Nelia/Maelu Secondary Financial Certificates N-62 & M-62 & Endorsement 3 to Certificates N-73 & M-73 ML20078C8041983-09-22022 September 1983 Forwards Endorsements 45 & 46 to Maelu Policy MF-93 & Endorsements 54 & 55 to Nelia Policy NF-238 1990-07-24
[Table view] |
Text
(,(oO:
3 .- - ..
x VOLPE, BOSKEY AND LYO N S .g WORLD CENTER BUILDING ,
p 948 16L" STR E ET. N. W.
WASHINGTON, D. C. 20006 Cu""E r .o2Ev '84 OCT 23 P2 54 um m-*=*o ELLIS LYONS EDWARD A.GROOSERT ,77g . , , . ,
1 D. SI ARD M ACGUIN EAS f ;.[ ' [ I-EDWIN E. MUDDLESON,M -9 October 23, 1984
, FVA P SH ERMAN PATRICIA A. M AYER Dr. Harold R. Denton Director' Office of Nuclear Reactor Regulation t:
U.S. Nuclear Regulatory rtzc Commission D L /W.,O ,
Washington, D.C. 205c5 g wr Re: Alabama Power Company h
(Farley Nuclear Units Nos. 1 and 2):
Antitrust Enforcement Action 2.2
Dear Dr. Denton:
In order to assist the Staff in its determinations regard-ing Alabama Electric Cooperative's (AEC) request for antitrust enforcement action, we enclosc copies of recent correspondence regarding the pricing of'AEC's proportionate ownership entitle-ment-to the Farley Nuclear Units and related matters. Specific-ally, there are enclosed a copy each of Mr. Lowman's letter of August 10, 1984 to Mr. Crawford, and Mr. Lowman's letter of October 18,-1984 to Mr. Crawford.
We are in receipt of Alabama Power Company's rather bulky
' Memorandum and attachments of October 15, 1984, filed in response to AEC's request for enforcement, which was filed one hundred and eight (108) days earlier, on June 29, 1984. The Company's filing is presently under review to determine whether it contains any matter warranting a response. Should the NRC Staff desire responses to any particular theories set forth in the Company's filing, please so notify us and we will be delighted to furnish such responses.
Sincerely yours, 46~Nf S-D. Biard MacGuineas Attorney for Alabama Electric Cooperative, Inc.
cc: (with attachments)
As Per Attached Service List 8410240065 841023 PDR ADOCK 05000348 / {
M PDR
^ ~ ~
P'od~ bit'.ce Bbx 550
. . Anoalusia, Alabama 36420 (205) 222 2571 Charles R. Lowman General Manager
^
August 10, 1984
-Mr. B. J. Crawford, Manager Government & Wholesale Service Alabama Power Company P. O. Box 2641 Birmingham, Alabama 35291 De'ar Bob:
~
This is in further response to the letter to me dated July 23, 1984, signed by you. After further discussion of your letter with Jim Vann we have concluded that a response beyond what was stated in my letter to you of July 25, 1984
~
is appropriate in light of several of the remarkable state-ments in your July 23 letter.
Prior to our June 20 meeting , we' made clear to you that indeed we could not feel from the Company's positions that APCo had been negotiating in good faith to comply with its antitrust license condition. However, we made equally clear that we would be willing to negotiate further in a small group if that is what APCo now desired, but that we would not delay seeking NRC assistance if necessary. I never expressed any intent to visit with NRC officials on an ex parte basis, or in any other manner.
As you are well aware, AEC has responded to APCo's
. 1'
" price p~oposal" of April,1983, and has pointed out the numerous ways in which it violates the license condition and ALAB-646 ; we have responded both in meetings (May 24, 1983; June 29, 1983; at the September 1, 1983 meeting Mr. Vogtle opened by suggesting pricing not be discussed, and we went on :
to other matters) , and in our correspondence (my letter to l Mr. Vogtle of June 24, 1963; Mr. Parish's letter to Mr. 1 j
- Vogtle of September 20, 1983 ; cy letter to Mr. Vogtle of October 11, 1983).
l l
l I
. l l
l
.......--m..,- .. .on v mne : + -
,t- ;.
4
~
Mr. B. J. Crawford August 10, 1984
- Page 2 .
Moreover, Mr. Buettner advised us in his letter of April.-
111, 1984 that APCo's price for the' sale was being revised and should be available by the end of the month. But this pricing had not been-received by the June 20_ meeting and when Lwefrequested it during the meeting , the Company would not isgree to provide the pricing. -
At our. June 20, 1984 meeting I stated I did not have a Ldollar. pricing proposal for discussion at the meeting. This should hardly have been surprising since the Company has consistently expressed a refusal to consider pricing based on AEC -historical financing costs applied to the cost of the units, as required by ALAB-646.
At the meeting there was a discussion of AEC-receipt of Farley plant benefits in lieu of those coming from ownership.
However, the claim in your letter crhat we suggested a unit power _ proposal is not correct. Company representatives requested : AEC cost-of-interest data so APCo could make d
ownership and/or unit power proposals.
i In the discussion of an alternative to ownership, I
- 'specifically stated that I did not think unit power alone was
. sufficient. And in response to your questioning about -
pricing .or equivalent benefits , I stated on two occasions
.that we were negotiating and I could not say that there was
'not room for any movement on our part.
Finally,-we have never received responses from the Company as to why, or in what respects, our January 20, 1984 proposed owne.rship, operating ~ and nuclear fuel agreement, and wheeling -amendments are unacceptable to the Company. These draft contracts are still on the table awaiting APCo's responses.
Sincerely, lCharles R. Low anmM General Manager
.CRL: elf' cc :. Mr. James A. Vann, Jr.
~'
.~ -. P$s5h5c $$ SN"' j
- kWakssia, Al2ama M420
- (205) 222-2571 Charles R. Lowman General Manager
- b October 18, 1984 ,
Mr. B~. J. Crawford, Manager Government and Wholesale Service Alabama Power Company Post Office Box 2641 .
Birmingham, Alabama 35291
Dear Bob:
This is in response to the request in your letter of September 24, 1984, for elaboration of AEC's price proposal for its proportionate share-(6.7%) of the Farley units. In our previous discussions of pricing, the Company explained that it had substituted its gross incremental cost of capi-tal for its' net book AFUDC rates on the units as one of the mark-ups used by the Company to arrive at its offering price.
We then indicated that we had made our calculations using ~
AEC's cost of money pursuant to ALAB-646. The Company re-j ected this concept a.nd has-never indicated any desire to
- know the results of our approach until the June 20, 1984 meeting with Jim Vann and myself. We did not have the numbers with us at that meeting.
An' acceptable price to AEC for the units must be based on the following two primary principles inherent in ALAB-646:
(1) that AEC must realize the benefits of its own financing availabilities as a rural electric cooperative and it must realize its usual tax advantages as a non-profit cooperative (ALAB-646, 13 NRC at 1103-1106); and (2) that AEC shall not suffer economic injury from APCo's anticompetitive behavior in denying AEC ownership access from the early 1970's through the present (ALAB-646, 13 NRC at 1084-1085). In sum, the price to AEC today for its 6.7% share in the units must be no greater than what the cost to AEC would have been had the Company complied with the antitrust laws and policies and permitted ownership access to AEC in the early 1970's. To charge-AEC a higher price would only allow the Company to achieve the unlawful goal of its years of anticompetitive behavior--that goal being the economic injury of AEC. Thus, AEC's proposed price is consistent with ALAB-646 and is
" sufficient to fairly reimburne Licensee for the propor-tionate share of its total costs...." (ALAB-646, 13 NRC at
= -
?.1 5c
r.IB.cJ.-Crawford,'
M Manager q October'18', 1984
.1112) ;in - that' it precludes APCo from inflicting punitive
- economic injury upon AEC as a' direct result of APCo's
. deliberate anticompetitive conduct in denying ownership Jaccess for over a' decade.
'The price to APCo which> complies with these two govarn-
.ing1 principles is $74,387,000 for AEC's 6.7% share in the two units. LTo arrive at this: price, we.have calculated AEC's.
' total. capitalized cost in-the plant using AEC's interest during - construction (IDC)1 rates , instead of the Company's AFUDC rates:for the period 1973.through_1984. We have utilized the summary of actual construction-expenditures by
. year on the Farley nuclear plant provided by' Jim Elliott of e
APCo,. receive 4'by Southern Engineering on July 20, 1982, as
-the primary _ source oof APCo's investment costs. We have also
< utilized APCo's LForm 1 and the summaries of net and gross
' investments for the Farley plant each year provided by Mr.
.Elliott. AEC formally requested to become a part owner.of the Farley plant in 1971'; our calculations assume that AEC >
e Lb'egan to -invest money in the plant on January 1, .1973, and continued .to furnish -its prorata share of construction costs thereafter. .Due primarily to capital additions and depreci-
~
ation, the'results of these calculations'will necessarily
. change _ with time. Therefore,1we have_made these calculations 4
4
- to: the end of calendar-year 1984 estimating depreciation and
' capital additions ~to that-plant..
Using AEC's IDC rates for,the 1973 through 1984-period, L AEC's investment in the units would have been $101'660,000*
byEthe end of 1984 had the Company complied with the anti-L trust laws and their underlying policies. That figure is the
. ceiling on.the cost to AEC of its 6.7% share as of the end of
~
- x1984. JAssociated with that net investment is AEC's weighted, historical long-term financing cost for the relevant time l-p p'eriod 'of 8.719%.
c:
'* 'This figure is-less depreciation, which must be accountedLfor in any event, but particularly so in these
- circumstances where AECLhas been denied ownership access
- l. = benefits of the units from the time they went on-line through
- l. the~present; 'the figure includes capital additions. However,
! we lack sufficient data from the Company to back-out from L this/ figure illegitimate " costs" such as-the expenses run up L , by the ' Company to deny AEC ownership access through liti-b gation and-lobbying.
L 1
p i
Mr.:B. J. Crawford, Manager October 18', 1984 Page 3 .
'For.a twenty-eight (28) year levelized loan ** with quarterly payments at 8.719% interest, AEC's total interest cost on AEC's $101,660,000 investment would be $170,878,000.
However, because of the Company's anticompetitive refusal to 7 permit AEC ownership access in the early 1970's, the interest rate-for a currently placed loan with the Federal Finance Bank will be approximately 12.5%. At this current rate, the interest cost portion of an AEC loan to produce the same .
total debt service becomes $197,151,000--or $26,273,000 greater than it would have been had the Company complied with the law. Thus, the price to APCo for AEC's proportionate interest in the uni.ts is $101,660,000 less $26,273,000, or
$75,387,000, which constitutes the fair value of the plant and fair reimbursement to APCo in light of the fact that APCo accepted the G'onstruction Permits for the units subject to the future condition of potential joint ownership. It also
. represents the highest price to APCo which will disallow the Company from using the antitrust License Condition to economically injure AEC for the Company's anticompetitive purposes.
The above pricing relates to Farley Units 1 and 2 and related transmission substation. Any construction work in progress and unburned nuclear fuel at the time of closing would be priced in accordance with the same formula. -
We are delighted that the Company has finally--now that the matter is actively before the NRC once again--ci e n ssed an interest in our pricing concept. We would be detighted to meet with you and other Company representatives tc discuss it further.
I Sincerely yours, lY YCharles R.
ore x!Aff' owman General Manager CRL: elf cc: Mr . J ame s A. Vann , J r .
Mr. M. J. Parish, III D. Biard MacGuineas, Esq.
- Twenty-eight years is the remaining life of the plant as derived from the data furnished by Company representatives.
. . ..m CERTIFICATE OF SERVICE WhEim It-is hereby certified that service of the attached docu-ment has been made by mailing or delivering
- copies to the following on the 23rd day of October, 1984.*84 gg ,
b f A &m G
'D. BIARD"MACGUINEAS u ut;cy
- Dr. Harold R. Denton Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555
- Argil L. Toalston, Esquire Section Leader, Antitrust and Economics Analysis Section of the Siting Analysis Branch' Division of Engineering Office of Nuclear Reactor Regulation Washington, D.C. 20555
- Joseph Rutberg, Esquire Office of Executive Legal Director
- U.S. Nuclear Regulatory Commission Washington, D.C. 20555
- Benjamin H. Vogler, Esquire
- Office of Executive Legal Director U.S. Nuclear Regulatory Commission Washington, D.C. 20555
- Guy H. Cunningham, III, Esquire Office of-Executive Legal Director U.S. Nuclear Egulatory Commirsion
. Washington, D.C. 20555
- Dr. Richard C. DeYoung Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555
.
- James Lieberman,. Esquire Director and Chief Counsel Regional Operations and Enforcement Division Office of Executive Legal Director Washington, D.C. 20555
!) ;
. . ;' . ' ; i .
%: 1
,
- Stephen G.' Burns, Esquire Deputy Director and Chief Counsel Regional OperationsLand Enforcement Division Office.of Executive Legal Director EU.S. Nuclear Regulatory Commission
' Washington, D.C. 20555
- William J..Dircks Executive Director for-Operations
.U.S. Nuclear ~ Regulatory Commission Washington, D.C. 20555;
- Herzel H.-E. Plaine, Esquire General Counsel U.S. Nuclear Regulatory Commission Washington, D.C. 20555
- Martin G. Malsch, Esquire Office of General Counsel U.S. Nuclear Regulatory Commission Washington, D.C. 20555
- Michael B. Blume, Esquire Office of General counsel U.S. Nuclear Regulatory Commission Washington, D.C. 20555
- Docketing and Service Section Office of the Secretary U..S. Nuclear Regulatory Commission Washington,.D.C. 20555
- Melanie Stewart Cutler, Esquire Chief, Energy Section Antitrust Division U.S. Department of Justice 9th & Pennsylvania Avenue, N.W.
. Washington, D.C. 20530
- David W. Brown, Esquire Assistant Chief, Energy Section Antitrust Division U.S. Department of Justice 9th.& Pennsylvania Avenue, N.W.
s Washington, D.C. 20530 ic
- John D. Whitler, Esquire Energy Section, Antitrust Division U.S. Department of Justice P.O. Box 14141 Washington, D.C. 20044 A g o Harold F. Reis, Esquire ;
~ '
J. A. Bouknight, ;Dc. , Esquire !
Newman & Holtzinger, P.C.
1025 Connecticut Avenue, N.W.
Washington, D.C. 20036 Robert A. Buettner, Esquire Balch, Bingham, Baker, Ward, Smith, Bowman & Thagard
~
P.O. Box 306 Birmingham, Alabama 35201 i
+