05000285/LER-1992-026, Requests Extension Until 920306 to Complete Comprehensive Licensed Operator Medical Exam Procedure,Per LER 92-026

From kanterella
Revision as of 17:45, 4 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Requests Extension Until 920306 to Complete Comprehensive Licensed Operator Medical Exam Procedure,Per LER 92-026
ML20092G492
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 02/07/1992
From: Gates W
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LIC-92-065R, LIC-92-65R, NUDOCS 9202200173
Download: ML20092G492 (1)


LER-2092-026, Requests Extension Until 920306 to Complete Comprehensive Licensed Operator Medical Exam Procedure,Per LER 92-026
Event date:
Report date:
2852092026R00 - NRC Website

text

- - - - - - - - - - - - - - - -

....i.. i i . . . . . . . . . .

Ornaha Pubtle Power District M4 South 16th Street Mall Omaha, Nebraska 68102-2247 february 7, 1992 402 6 2000 LIC-92-065R U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station PI-137 Washington, DC 20555

Reference:

1. Docket No. 50-285
2. Letter from 0 PPD to NRC dated December 5,(W. 1991 G. (LIC-9 Gates)1-281L) (Document Control Desk)

Gentlemen:

SUBJECT:

Comprehensive Licensed Operator (LO) Medical Examination Procedure In Licensee Event Report 91-026 dated December 5,1991 Reference 2 Omaha Public Power District (0 PPD) committed to develop a comp (rehensive LO), m edical-examination procedure to consolidate various department responsibilities into a single document by January 31, 1992.

OPPD has completed drafting a new Standing Order (50) which will accomplish the subject objective. The 50 involves input and actions by several departments which will require review prior to approval. When the commitment date was submitted in the Reference 2 document, U??D didn't anticipate the extensive reviews which would be required. To complete the necessary reviews prior to approval, OPPD requests that the Reference 2 commitment date be changed to March 1992.

6,ll ca on JanuaryMr. 31, P.1992 H. Harrell with Mr.of the R. W. NRC Shortagreed with the extension in a telephone of OPPD.

If you should have any questions, please contact me.

Sincerely, K/. 5 S W. G. Gates Division Manager Nuclear Operations WGG/sel c: LeBoeuf, Lamb, Leiby & MacRae R. D. Martin, NRC Regional Administrator, Region IV D. L. Wigginton, NRC Senior Project Manager S. D. Bloom, NRC Project Engineer R. P. Mullikin, NRC Senior Resident Inspector 9202200173 920207

  • PDR ADOCK 05000285 45st24 V

1oUUUU PDR Emsoyment v t,h nunity

] f