Statement of Matl Facts as to Which There Is No Genuine Issue Re Eddleman Contention 154
ML20093D696
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/08/1984
From: Ridgway D
CAROLINA POWER & LIGHT CO., SHAW, PITTMAN, POTTS & TROWBRIDGE
To:
Atomic Safety and Licensing Board Panel
Shared Package
ML20093D652 List:
References
OL, NUDOCS 8410110341
Download: ML20093D696 (4)


Text

N :n il CCLKETED October N,Mi984 UNITED STATES OF AMERICA 00 10 A11 :10 NUCLEAR REGULATORY COMMISSION LIFtE OF EEC.M iw BEFORE'THE ATOMIC SAFETY AND LICENSING BO dhfC

'In the Matter of )

)

CAROLINA POWER & LIGHT COMPANY ) -

and NORTH CAROLINA EASTERN ) Docket No. 50-400 OL

MUNICIPAL POWER AGENCY )

)

-(Shearon Harris-Nuclear Power )

Plant) )

. APPLICANTS' -STATEMENT OF MATERIAL FACTS AS TO WHICH THERE IS NO GENUINE ISSUE TO BE HEARD ON EDDLEMAN-154 Pursuant to 10 C.F.R. 5 2.749(a), Applicants state, in support of their Motion For. Summary Disposition of '

Eddleman-154, that there is no genuine issue to be heard with respect to the following material facts:

1. _ Annex B of the onsite emergency plan explains the basis for the. dose projection. calculation methods. It is not itself a procedure for use by operators performing dose projections. Black Affidavit, 13.
2. The dose projection procedures'for use by Harris operators -- like those in use at other operating nuclear plants across the nation -- are written to involve no de-tailed eperator judgment. Black Affidavit, S '4.
3. Dose projection calculations are not necessary to make initial protective action recommendations to offsite authorities. Instead,_a flow chart (Figure 4.5-1 of the 8410110341 e4100s

-PDR 0 ADOCK 05000400 PDR

onsite plan) is used to make recommendations based upon plant conditions. Black Affidavit, 11 5 - 7.

~

4. - After.the initial recommendations are made, dose

! projection calculations are performed to confirm the initial recommendations. Black Affidavit, 1 8.

5. These calculations may be performed either by using:the ERFIS computer, or by using a pocket calculator.

Black Affidavit, 11.9-10.

26. A steep-by-step " cookbook"-type procedure has been developed for the manual method of performing. dose projec-tion calculations. Black Affidavit, 1 10.
7. Regardless of'whether the dose.. projection calcula-tions-are performed using the'ERFIS computer or a pocket calculator, the procedures are written to involve no de-tailed-operator judgment. ' Black Affidavit, 11 2, 4, 9, 12, 19.
8. All personnel who may be. assigned to perform dose projections receive training in the methods used to perform those projections. The operators.must demonstrate a satis-i factory understanding of the steps of the dose projection

. procedures, and must provide correct answers to sample prob-lems using the applicable procedures. Black Affidavit, 1 1

12.

19. Prior to the exercise, a number of practice drills 4

will be conducted. requiring satisfactory performance of dose e projection calculations. The shift operators' performance 1

1

_ _ a

F3 ~ . . .

's ig'critiqutd by controller /cvaluators knowledgeable in the subject. Black Affidavit, i 13,

10. -One practice drill will be a rehearsal for the pre-licensing full-scale exercise, using a complete scenar-io, with controller / evaluators. Dose projections performed by the shift operators will be compared against the correct answers included in the drill scenario. Elack Affidavit, 1

- 14 .

11. Prior to operation of the Harris plant above 5%

power, a pre-licensing full-scale exercise will be con-ducted, which will once again test the shift operators' dose projection capabilities. This exercise will be observed and

-scored by federal evaluators. Black Affidavit, 1 15.

12. Controller / evaluators for drills and exercises will rate shift operators' performances, and any unsatisfactory ratings will result in retraining of individ-uals. Black Affidavit, 1 16.

9 p

. r-

~13. fThe NRC Staff has approved the descriptions of Applicants' emergency plan training program and Applicants' drills and exercises program, as. contained in the onsite plan. Black Affidavit, i 17.

Respectfully submitted, Ih2 at- -

u)Libb Thonras '%. Baxtee, -P . .C U Delissa A. Ridgway SHAW, PITTMAN, POTTS & TROWBRIDGE 1800 M Street, N.W.

Washington, D.C. 20036 (202) 822-1000 Richard E. Jones Samantha F. Flynn Dale E. Hollar Hill Carrow CAROLINA POWER & LIGHT COMPANY P.O. Box 1551 Raleigh, North Carolina 27602 (919) 836-7707 Counsel for Applicants Dated: October 6 1984 6

I t

&_,