ML20100P384

From kanterella
Revision as of 10:29, 29 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Issue 4,Rev 4 of Plant Physical Security Plan.Rev Withheld
ML20100P384
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 02/29/1996
From: Christensen H
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-89-07, GL-89-7, NUDOCS 9603110166
Download: ML20100P384 (1)


Text

_ _ _ _ . .. . _ . _. _ . _ . ._ _ . .

6 7 NIAGARA SAFEGUARDS INFORMATION

\J i': L MCHAWK 1

l NINE MILE POINT-UMT 2'P O BOX 63. LYCOMING. NY 13093/ TELEPHONE (315) 343 2110 )

4 U. S. Nuclear Regulatory Commission February 29,1996 Attn: Document Control Desk j Washington, DC 20555 1

i.  !

RE: Nine Mile Point Unit 1 Nine Mile Point Unit 2  !

Docket No. 50-220 Dor:ket No. 50-410 1 DPR-63 c NPF-69 ,

l Gentlemen:

Tran0mitted herewith, in accordance with 10CFR50.54(p), is issue 4, Revision 4 of the Nine Mile Point j Nuclear Station Physical Security Plan. This revision fully implements the vehicle control measures required l

! by 10CFR73.55(c)(7) and (8). We have reviewed the changes embodied in issue 4, Revision 4 and

determined that they do not reduce the effectiveness of the Plan or the overall Nuclear Security Program

, for Nine Mile Point Nuclear Station.

i With the implementation of this revision of the Physical Security Plan, those portions of the Safeguards 4

Contingency Plan incorporated in response to Generic Letter 89-07, " Power Reactor Safeguards )

Contingency Planning for Surface Vehicle Bombs" are considered superseded. We will be removing those i

2 portions from the Safeguards Contingency Plan in a revision planned for the near future.

i l A " Summary of Changes" for issue 4, Revision 4 has been provided to facilitate NRC review.

Sincerely,

, $ C r W%

Howard G. Christensen Manager - Nuclear Security

/lc - .

Enclosures:

Origina:, plus 3 copies of issue 4, Revision 4 of the Nine Mile Point Nuclear Station Physical Security Plan and Summary of Changes xc: NRC Region 1 Administrator - 2 copies of issue 4, Revision 4 of the Nine Mile Point Nuclear Station Physical Security Plan and Summary of Changes Nine Mile Point Nuclear Station Senior Resident inspector - 1 copy of issue 4, Revision 4 of the Nine Mile Point Nuclear Station Physical Security Plan and Summary of Changes ENCLOSURE CONTAINS SAFEGUARDS INFORMATION.

UPON SEPARATION, THIS PAGE IS DECONTROLLED.

3M015 . S AFEGUARDS INFORMATION 9603110166 960229 PDR Y

ADOCK 05000220 PDR

- . . _ .. - - _ - - 'I f.