Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217H6231999-10-18018 October 1999 Discusses Completion of Licensing Action for GL 98-01 & Suppl 1, Yr 2000 Readiness of Computer Sys at Npps, to All Holders of Operating Licenses for NPPs ML20217J4331999-10-15015 October 1999 Forwards Insp Rept 50-461/99-19 on 990913-17.One Violation Re Individual Failure to Follow Radiation Protection Procedures When Accessing High Radiation Area Noted & Being Treated as Noncited Violation U-603280, Forwards Rev 27 to Clinton Power Station Physical Security Plan,Iaw 10CFR50.54(p).Encl Withheld from Public Disclosure, Per 10CFR50.54(p)1999-10-12012 October 1999 Forwards Rev 27 to Clinton Power Station Physical Security Plan,Iaw 10CFR50.54(p).Encl Withheld from Public Disclosure, Per 10CFR50.54(p) ML20217C0871999-10-11011 October 1999 Forwards Proprietary Attachment Inadvertently Omitted from Encl 2 to Submitting Responses to NRC RAI Re License Transfer Application for Plant.Proprietary Encl Withheld U-603276, Forwards Rev 8 to CPS USAR, Which Includes Changes from 970701 Through 990630 & Available Changes Approved After 990630 That Reduce Overall Burden of Submittal Changes for Forthcoming Reporting period.10CFR50.59 Rept Included1999-10-0808 October 1999 Forwards Rev 8 to CPS USAR, Which Includes Changes from 970701 Through 990630 & Available Changes Approved After 990630 That Reduce Overall Burden of Submittal Changes for Forthcoming Reporting period.10CFR50.59 Rept Included U-603279, Forwards non-proprietary & Proprietary Responses to NRC RAI Re License Transfer Application for Plant.Attached Responses Also Respond to Comments of Environ Law & Policy Center Dtd 990920.Proprietary Encl Withheld1999-10-0707 October 1999 Forwards non-proprietary & Proprietary Responses to NRC RAI Re License Transfer Application for Plant.Attached Responses Also Respond to Comments of Environ Law & Policy Center Dtd 990920.Proprietary Encl Withheld U-603275, Provides Updated Illinois Power Rept on Status of Decommissioning Funding for Clinton Power Station1999-10-0707 October 1999 Provides Updated Illinois Power Rept on Status of Decommissioning Funding for Clinton Power Station ML20217A9881999-10-0101 October 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities ML20217A7361999-10-0101 October 1999 Forwards Insp Repts 50-461/99-14 & 50-461/98-12 on 990729-0908.Two Violations Identified,One Re Failure to Place Control Switch in Proper Position to Identify Piece of out-of-svc Equipment & Being Treated as NCVs ML20217J1251999-09-30030 September 1999 Refers to Investigation 3-1997-040 Conducted from 971028- 980921 & Forwards Nov.Investigations Determined That During Jan 1997,supervisor Qv Dept Discriminated Against Qv Inspector in Retaliation for Inspector Contacts with NRC ML20217J1421999-09-30030 September 1999 Refers to Investigation 3-97-040 Conducted from 971028- 980921 & Forwards Nov.Investigation Concluded That Recipient Engaged in Deliberate Misconduct in That Recipient Discriminated Againt Qv Inspector for Having Contacted NRC ML20212G6751999-09-22022 September 1999 Forwards Comment Submitted to NRC by Environ Law & Policy Ctr Re Proposed License Transfer for Clinton Power Station U-603272, Provides Update to Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. 3-D Monicore & Station Security Sys remediated.Y2K Readiness Disclosure for Cps,Encl1999-09-22022 September 1999 Provides Update to Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. 3-D Monicore & Station Security Sys remediated.Y2K Readiness Disclosure for Cps,Encl U-603225, Provides Closure of Util Commitments Re Ci Cv Noted in Previous Ltr to Nrc.Basis for Expecting Valves to Remain in leak-tight Condition Throughout Operating Cycle & Basis That Justifies Not Performing mid-cycle Leak Testing,Encl1999-09-20020 September 1999 Provides Closure of Util Commitments Re Ci Cv Noted in Previous Ltr to Nrc.Basis for Expecting Valves to Remain in leak-tight Condition Throughout Operating Cycle & Basis That Justifies Not Performing mid-cycle Leak Testing,Encl ML20212G6981999-09-20020 September 1999 Requests That NRC Reject Proposed License Transfer for Clinton Power Station & That NRC State That Public Interest in Safe Nuclear Power Industry Will Not Be Subordinated to Interest in Maximizing Profit by Limiting Liability ML20217H3421999-09-17017 September 1999 Forwards Request for Addl Info Re Licensee 990723 Application for License Transfer & Conforming Administrative License Amend.Response Requested within 20 Days of Receipt of Ltr 05000461/LER-1996-010, Forwards LER 96-010-01, Plant Shutdown Due to Unidentified RCS Leakage from Degraded Reactor Recirculation Pump Seal Greater than TS Limit. Revised Rept Includes Cause of Event,Corrective Actions & Discussion of Similar Events1999-09-13013 September 1999 Forwards LER 96-010-01, Plant Shutdown Due to Unidentified RCS Leakage from Degraded Reactor Recirculation Pump Seal Greater than TS Limit. Revised Rept Includes Cause of Event,Corrective Actions & Discussion of Similar Events 05000461/LER-1999-011, Forwards LER 99-011-00 Re Improper Restoration of a APRM Which Caused Monitor to Not Meet Seismic Qualification Requirements.Rept Contains Listed Commitments1999-09-10010 September 1999 Forwards LER 99-011-00 Re Improper Restoration of a APRM Which Caused Monitor to Not Meet Seismic Qualification Requirements.Rept Contains Listed Commitments U-603269, Certifies That DB Livingston,License OP-31136,successfully Completed Facility Licensees Requirements to Be Licensed as Ro,Per 10CFR55 & Has Need for RO License to Perform Assigned Duties.Five Significant Control Manipulations,Listed1999-09-10010 September 1999 Certifies That DB Livingston,License OP-31136,successfully Completed Facility Licensees Requirements to Be Licensed as Ro,Per 10CFR55 & Has Need for RO License to Perform Assigned Duties.Five Significant Control Manipulations,Listed ML20211Q2671999-09-0808 September 1999 Informs That NRC Tentatively re-scheduled Initial Licensing Exams for License Operator License Applicants During Weeks of June 5 & 12,2000.Validation of Exams Will Occur at Station During Weeks of May 15,2000 U-603229, Provides Response to NRC RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Dtd 990528.Rev 0 to Calculation IP-M-0556 & Rev 0 to Calculation IP-M-0570,encl1999-08-25025 August 1999 Provides Response to NRC RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Dtd 990528.Rev 0 to Calculation IP-M-0556 & Rev 0 to Calculation IP-M-0570,encl U-603243, Forwards Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Util Performing Testing of ESF Ventilation Sys Charcoal Samples Using ASTM D3803- 1989 Methodology as Required by TS 5.5.71999-08-23023 August 1999 Forwards Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Util Performing Testing of ESF Ventilation Sys Charcoal Samples Using ASTM D3803- 1989 Methodology as Required by TS 5.5.7 ML20211D2201999-08-23023 August 1999 Confirms 990817 Telcon with J Neuschwanger & D Mcneil Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Plant U-603258, Forwards ISI Summary Rept, IAW ASME Section Xi,Article IWA-6000.Summary Rept Addresses ISI Activities Performed at Plant from 950429-990527,including Extended Sixth Refueling Outage1999-08-23023 August 1999 Forwards ISI Summary Rept, IAW ASME Section Xi,Article IWA-6000.Summary Rept Addresses ISI Activities Performed at Plant from 950429-990527,including Extended Sixth Refueling Outage ML20211B0871999-08-20020 August 1999 Responds to J Hopkins Inquiry Re Application for Order Consenting to License Transfer & Approving Conforming Administrative License Amend Filed by Ilpr & Amergen Energy Co on 990723 U-603259, Provides Notification That Cl Kreidler Has Resigned Position with Util,Effective 990818.License Status Should Be Changed to Expired1999-08-19019 August 1999 Provides Notification That Cl Kreidler Has Resigned Position with Util,Effective 990818.License Status Should Be Changed to Expired ML20211A8931999-08-19019 August 1999 Forwards Insp Rept 50-461/99-13 on 990611-0728.Two Violations Noted & Being Treated as Ncvs.Violation Re Three Examples Where Licensee Procedural Requirements for Minor Maint Work Were Not Followed U-603253, Notifies NRC That Je Smith,License SOP-30819-1,has Resigned from Position with Ilpr Effective 990813.Status of License Should Be Changed to Expired,Effective 9908131999-08-16016 August 1999 Notifies NRC That Je Smith,License SOP-30819-1,has Resigned from Position with Ilpr Effective 990813.Status of License Should Be Changed to Expired,Effective 990813 ML20210U3771999-08-12012 August 1999 Forwards Notice of Consideration of Approval of Transfer of FOL & Issuance of Conforming Amend & Opportunity for Hearing Re Amend Request for Approval of Clinton Power Station License NPF-62 Transfer to Amergen U-603250, Notifies NRC That Ma Freihofer (License SOP-31296-1) Has Resigned from Position with Illinois Power Effective 990729 & License Status Should Be Changed to Expired Effective 9907291999-08-10010 August 1999 Notifies NRC That Ma Freihofer (License SOP-31296-1) Has Resigned from Position with Illinois Power Effective 990729 & License Status Should Be Changed to Expired Effective 990729 U-603249, Notifies NRC That He Bouska (License SOP-3055-1) Has Resigned from Position with Illnois Power Effective 990809. & License Status Should Be Changed to Expired Effective 9908091999-08-10010 August 1999 Notifies NRC That He Bouska (License SOP-3055-1) Has Resigned from Position with Illnois Power Effective 990809. & License Status Should Be Changed to Expired Effective 990809 ML20210N2961999-08-0909 August 1999 Forwards Form of Nuclear Decommissioning Master Trust Agreement,Per CPS Application for License Transfer & Conforming Administrative License Amend U-603248, Requests Unrestricted License for Kc Scott,License SOP-31532.Scott Has Successfully Completed Facility Licensee Requirements to Be Licensed as Operator/Senior Operator Per 10CFR551999-08-0606 August 1999 Requests Unrestricted License for Kc Scott,License SOP-31532.Scott Has Successfully Completed Facility Licensee Requirements to Be Licensed as Operator/Senior Operator Per 10CFR55 U-603236, Forwards Revised Data Point Ref File Sheets for Clinton Power Station Computer Points That Input to ERDS1999-08-0202 August 1999 Forwards Revised Data Point Ref File Sheets for Clinton Power Station Computer Points That Input to ERDS ML20210J0541999-07-30030 July 1999 Forwards Three Original Signature Pages of Gr Rainey for Application for License Transfer & Conforming Administrative License Amend, for NRC Files U-603178, Forwards Four ASME Section XI Relief Requests Re Performance of non-destructive Exams for First 120-month Inservice Insp for CPS1999-07-29029 July 1999 Forwards Four ASME Section XI Relief Requests Re Performance of non-destructive Exams for First 120-month Inservice Insp for CPS U-603237, Informs That Util Will Provide Response to fire-related Questions One & Two of NRC RAI Re CPS Ipeee,By 0001311999-07-28028 July 1999 Informs That Util Will Provide Response to fire-related Questions One & Two of NRC RAI Re CPS Ipeee,By 000131 U-603240, Forwards Clinton Power Station semi-annual Fitness for Duty Rept for Period Ending 990630,IAW 10CFR26.711999-07-27027 July 1999 Forwards Clinton Power Station semi-annual Fitness for Duty Rept for Period Ending 990630,IAW 10CFR26.71 U-603235, Forwards Application for License Transfer & Conforming Administrative License Amend for OL NPF-62.Proprietary & Nonproprietary Asset Purchase Agreement Encl.Proprietary Info Withheld,Per 10CFR2.7901999-07-23023 July 1999 Forwards Application for License Transfer & Conforming Administrative License Amend for OL NPF-62.Proprietary & Nonproprietary Asset Purchase Agreement Encl.Proprietary Info Withheld,Per 10CFR2.790 ML20210A4401999-07-16016 July 1999 Forwards Insp Rept 50-461/99-10 on 990422-0610.Four Violations Being Treated as Noncited Violations ML20209G7671999-07-12012 July 1999 Ack Receipt of Encl FEMA Correspondence ,which Transmitted FEMA Evaluation Rept for 981118 Biennial EP Exercise at Clinton Power Station.No Deficiencies Were Observed ML20209D5691999-07-0707 July 1999 Forwards Insp Rept 50-461/99-12 on 990607-11.No Violations Noted.Insp Consisted of Selective Exam of Procedures & Representative Records,Observations of Work in Progress & Interviews with Personnel U-603231, Forwards Summary of Status of Plan for Excellence (Pee) Initiatives & Clinton Power Station (CPS) 1999 Business Plan.Encl Documents Provide Status & Disposition for Actions Not Completed to Date1999-07-0707 July 1999 Forwards Summary of Status of Plan for Excellence (Pee) Initiatives & Clinton Power Station (CPS) 1999 Business Plan.Encl Documents Provide Status & Disposition for Actions Not Completed to Date U-603214, Forwards Results of Analysis Performed on Recently Completed Vendor Contracts,Per GL 83-28, Required Actions Based on Generic Implications of Salem ATWS Events1999-07-0606 July 1999 Forwards Results of Analysis Performed on Recently Completed Vendor Contracts,Per GL 83-28, Required Actions Based on Generic Implications of Salem ATWS Events ML20196J9651999-07-0202 July 1999 Confirms Discussion Between Members of Staffs to Conduct Meeting on 990714 at Clinton Power Station to Discuss Results of Restart Insp & Licensee Progress in Addressing Remaining Long Term C/A Actions to Sustain Improvements ML20196J7131999-06-30030 June 1999 Informs of Closure of Response to Requests for Addl Info to GL 92-01,Rev 1,Supplement 1, Reactor Vessel Structural Integrity, for Clinton Power Station Unit 1 U-603218, Provides Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. Attachment Provides Y2K Readiness Disclosure for Plant1999-06-28028 June 1999 Provides Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. Attachment Provides Y2K Readiness Disclosure for Plant U-603212, Forwards Response to NRC 990315 Telcon Re Proposed Amend of License NPF-62,implementing Feedwater Leakage Control Sys Mode of RHR Sys1999-06-24024 June 1999 Forwards Response to NRC 990315 Telcon Re Proposed Amend of License NPF-62,implementing Feedwater Leakage Control Sys Mode of RHR Sys U-603227, Provides Updated Rept on Status of Decommissioning Funding for Plant.Updated Rept Provides Min Decommissioning Fund Estimate,Per 10CFR50.75(b) & (C) Utilizing NUREG-1307,Rev 8 Methodology1999-06-24024 June 1999 Provides Updated Rept on Status of Decommissioning Funding for Plant.Updated Rept Provides Min Decommissioning Fund Estimate,Per 10CFR50.75(b) & (C) Utilizing NUREG-1307,Rev 8 Methodology ML20196A3471999-06-16016 June 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-461/99-11 Issued on 990430.Corrective Actions Will Be Examined During Future Inspections 1999-09-08
[Table view] Category:EXTERNAL CORRESPONDENCE
MONTHYEARML20247B4621998-03-27027 March 1998 Forwards Technical Bulletin 12 Addressing Problem Found at Illinois Power W/Power Semiconductor Clamps Used in Elgar Inverters.Procedure for Tightening Clamps Was Incorrect. Correct Method Involves Use of Force Gauge ML20102B4291992-07-15015 July 1992 Requests Mod to NPDES Permit IL0036919,adding Contributory Waste Stream Listing & Changing Approx Flow Value for Main Condenser Cooling Water at Outfall 002 & Adding Special Condition Re Treatment of DG Transformer at Outfall 005 ML20203M8581986-08-11011 August 1986 Responds to Request Re Status of Programs & Plans for Action Identified in Paragraph 7.a of ASLBP 850128 Joint Stipulation Preamble.Info Re FSAR Verification Program,Third Party Audits & Configuration Mgt Program Provided ML20102A1611985-02-0101 February 1985 Forwards Amend to Protocol Governing Conduct of Independent Design Review at Facility.Amend Constitutes Exhibit a to OL Proceedings & Was Effective on 850129 ML20106C3211985-01-18018 January 1985 Forwards Vols 1-6 of Independent Design Review for Illinois Power Co, Final Rept ML20099D4141984-11-14014 November 1984 Forwards Sargent & Lundy Response to Observation Rept 13, Rev 0,re Hot Gap Checks for Pipe Rupture Restraints ML20099D1251984-11-14014 November 1984 Forwards Sargent & Lundy Response to Rev 0 to Observation Rept 32 Re Potential Fault in Class 1E Ac Electrical Sys. Rept Reviewed by Util ML20099D1141984-11-14014 November 1984 Forwards Sargent & Lundy Response to Rev 0 to Observation Rept 25 Re Rigidity of Motor & Air Operated Valves W/Extended Masses.Rept Reviewed by Util ML20099C9191984-11-14014 November 1984 Forwards Sargent & Lundy Response to Rev 0 to Observation Rept 17 Re Possible Design Discrepancy in Shutdown Svc Water Sys Active Valves ML20099C9031984-11-14014 November 1984 Forwards Sargent & Lundy Response to Rev 0 to Observation Rept 31 Re Possible Design Discrepancy in Shutdown Svc Water Sys Valves 1SX095 a & B ML20099C7421984-11-14014 November 1984 Forwards Sargent & Lundy Response to Observation Rept 8, Rev 1,re Separation of non-Class 1E Components from Class 1E Dc Power Source ML20094B0791984-10-27027 October 1984 Forwards Errata to & Stenographic Rept of Clinton Independent Design Review First Progress Meeting Held in Rosemont,Il on 841016.Svc List Encl ML20106E2581984-10-23023 October 1984 Forwards List of 20 Engineering Design Areas Referred to in Section III D of Attachment 1 of & Sections 2.5, Evaluation of Sargent & Lundy Design Practices, Per NRC 841013 Request.W/O Encls ML20093J9111984-10-0909 October 1984 Forwards Proposed Agenda for First Progress Meeting on 841016 Re Independent Design Review ML20093K5941984-10-0909 October 1984 Forwards Addl Resumes for Personnel Joining Independent Design Review Team Since Submittal of Original Issue of Program Plan in Jul 1984 ML20093K6151984-10-0101 October 1984 Forwards Independent Design Review & Progress Rept for June-Sept 1984.Subsequent Repts to Be Issued Monthly ML20090H6631984-07-10010 July 1984 Forwards Review Plan & Rev 0 to Program Plan Dtd Jul 1984, Covering Independent Design Review,Per 840619 Request ML20090H8691984-06-26026 June 1984 Discusses Reasons for Selecting HPCS & Class IE Ac Electric Power Sys as Basis for Vertical Portion of Independent Design Review.Sys Offers Range of Functions & Technical Disciplines ML20092K2051984-06-22022 June 1984 Forwards Proposed Agenda for Independent Design Review 840628 Meeting in Bethesda,Md ML20092K1621984-06-22022 June 1984 Forwards Bechtel to Util Re Proposed Independent Design Review of HPCS Sys & Class IE Ac Power Sys & Util 840622 Response ML20092K2691984-06-19019 June 1984 Forwards Dp Hall Ltr to Jl Milhoun Transmitting Independent Design Review Protocol.W/O Encl ML19340B8671980-11-0303 November 1980 Comments on Environ Rept Per Area Fish & Wildlife Resources. Biological Monitoring Programs,Baseline Studies & Control of Soil Erosion by Plantings & Buffer Strips Satisfactorily Completed.Bottomland Timber Loss Should Be Mentioned 1998-03-27
[Table view] Category:EXTERNAL LETTERS ROUTED TO NRC
MONTHYEARML20203M8581986-08-11011 August 1986 Responds to Request Re Status of Programs & Plans for Action Identified in Paragraph 7.a of ASLBP 850128 Joint Stipulation Preamble.Info Re FSAR Verification Program,Third Party Audits & Configuration Mgt Program Provided ML20102A1611985-02-0101 February 1985 Forwards Amend to Protocol Governing Conduct of Independent Design Review at Facility.Amend Constitutes Exhibit a to OL Proceedings & Was Effective on 850129 ML20106C3211985-01-18018 January 1985 Forwards Vols 1-6 of Independent Design Review for Illinois Power Co, Final Rept ML20099D1251984-11-14014 November 1984 Forwards Sargent & Lundy Response to Rev 0 to Observation Rept 32 Re Potential Fault in Class 1E Ac Electrical Sys. Rept Reviewed by Util ML20099D1141984-11-14014 November 1984 Forwards Sargent & Lundy Response to Rev 0 to Observation Rept 25 Re Rigidity of Motor & Air Operated Valves W/Extended Masses.Rept Reviewed by Util ML20099C9191984-11-14014 November 1984 Forwards Sargent & Lundy Response to Rev 0 to Observation Rept 17 Re Possible Design Discrepancy in Shutdown Svc Water Sys Active Valves ML20099C9031984-11-14014 November 1984 Forwards Sargent & Lundy Response to Rev 0 to Observation Rept 31 Re Possible Design Discrepancy in Shutdown Svc Water Sys Valves 1SX095 a & B ML20099C7421984-11-14014 November 1984 Forwards Sargent & Lundy Response to Observation Rept 8, Rev 1,re Separation of non-Class 1E Components from Class 1E Dc Power Source ML20099D4141984-11-14014 November 1984 Forwards Sargent & Lundy Response to Observation Rept 13, Rev 0,re Hot Gap Checks for Pipe Rupture Restraints ML20094B0791984-10-27027 October 1984 Forwards Errata to & Stenographic Rept of Clinton Independent Design Review First Progress Meeting Held in Rosemont,Il on 841016.Svc List Encl ML20106E2581984-10-23023 October 1984 Forwards List of 20 Engineering Design Areas Referred to in Section III D of Attachment 1 of & Sections 2.5, Evaluation of Sargent & Lundy Design Practices, Per NRC 841013 Request.W/O Encls ML20093J9111984-10-0909 October 1984 Forwards Proposed Agenda for First Progress Meeting on 841016 Re Independent Design Review ML20093K5941984-10-0909 October 1984 Forwards Addl Resumes for Personnel Joining Independent Design Review Team Since Submittal of Original Issue of Program Plan in Jul 1984 ML20093K6151984-10-0101 October 1984 Forwards Independent Design Review & Progress Rept for June-Sept 1984.Subsequent Repts to Be Issued Monthly ML20090H6631984-07-10010 July 1984 Forwards Review Plan & Rev 0 to Program Plan Dtd Jul 1984, Covering Independent Design Review,Per 840619 Request ML20090H8691984-06-26026 June 1984 Discusses Reasons for Selecting HPCS & Class IE Ac Electric Power Sys as Basis for Vertical Portion of Independent Design Review.Sys Offers Range of Functions & Technical Disciplines ML20092K2051984-06-22022 June 1984 Forwards Proposed Agenda for Independent Design Review 840628 Meeting in Bethesda,Md ML20092K1621984-06-22022 June 1984 Forwards Bechtel to Util Re Proposed Independent Design Review of HPCS Sys & Class IE Ac Power Sys & Util 840622 Response ML20092K2691984-06-19019 June 1984 Forwards Dp Hall Ltr to Jl Milhoun Transmitting Independent Design Review Protocol.W/O Encl ML19340B8671980-11-0303 November 1980 Comments on Environ Rept Per Area Fish & Wildlife Resources. Biological Monitoring Programs,Baseline Studies & Control of Soil Erosion by Plantings & Buffer Strips Satisfactorily Completed.Bottomland Timber Loss Should Be Mentioned 1986-08-11
[Table view] |
Text
c;;
I
, SCHIFF HARDIN & WAITE
- . A PomersNp inesummie mesammense comessons WASHINGTON OFFICE:
1101 Connecticut Avenue, N.W.. Washington. D.C. 20036 7200 Sears Tower, Chicago. lilinois 60606 .
Telephone (202) 857-0600 Telex SHW64590
- Telephone (312) 876-1000 TWx 910-221-2463 February 1,1985 Mr. Charles Dick Bechtel Power Corporation :
50 Beale Street
< P.O. Box 3965 San Francisco, California 94119 Re: Blinois Power Company-Clinton Power Station
-Independent Design Review
Dear Charlie:
On January 28,1985, Blir.ois Power Company, the Blinois Attorney General, Prairie Alliance, and the Nuclear Regulatory Commission, the parties to the operating license proceedings before the Atomic Safety and Licensing Board for .'
- the Clinton Power Station, entered into a Joint Stipulation. This Joint Stipulation
~ was filed on January 29,1985 with the Nuclear Regulatory Commission. Under Paragraph Al of the Stipulation, the protocol for the Clinton Power Station Independent Design ;
Review was amended. Enclosed as Exhibit A is the amendment to the Protocol under which the Independent Design Review for the Clinton Power Station is to be conducted.
This amendment to the Protocol took effect on January 29,1985, the day on which the Joint Stipulation was filed.- Consequently, Bechtel Power Corporation should
- operate under this amendment from that date.
Please do not hesitate to contact me if you have any questions.
Very truly yours, f
l so+
Charles D. Fox IV t-f
' CDF:Jm encl.
i ect See attached distribution list i
l l
r I
f g..
. w SCM ih
- q. . - . -. . - .
O~
^
. ~
EXHIBIT A PROTOCOL GOVERNING CONDUCT OF INDEPENDENT DESIGN REVIEW (IDR)
OF CLINION POWER STATION (CPS) i ,
.The underlined language is hereby added and the CPS IDR/ protocol is hereby amended by mutual agreement of the
- parties to - the JOINT STIPULATION to which this protocol is
! annexed as' EXHIBIT A.
- In~ the conduct of the IDR by Bechtel Power Corporation (BPC), the following protocol shall be adhered to:
. 1. Recommendations,- findings, evaluations and all exchange of correspondence, including draf ts , between
- BPC and Illinois Power Company (IP) (including its contractors and subcontractors) will be submitted to ,
the Director, Division of Licensing, Office of Nuclear
-Reactor Regulation (Director) and to the Illinois Attorney General (IAG) - at the same time as they arc submitted to IP.
- 2. BPC may request documentation material, meet with and interview individuals, conduct -telephone conversations, or visit the site to obtain information without prior notification to the-NRC or the IAG. All communications and transmittals of information shall, however, be. documented and such documentation'shall be 3
maintained in1a location accessible for NRC and/or the y examination.- Conmiunications between BPC and IP solely with respect to the financial and O ,
_1 4
- -+ . . . - . , . , . . . . _ _ , , . . . , _ .._,w_,. ,-_. ., ..__ ....y, . , _ , , _ . . _ , , _ , , , _ . , _ , , , _ , . , , , . . . _ . , , . , _ , .
- t[
administrative aspects of the IDR contract are outside the scope of this protocol.
- 3. If BPC wishes to discuss with IP substantive matters related to information obtained, to provide an interim report to IP, or to discuss its findings or conclusions with IP in advance of completing its report, or if IP or the IAG desires such communication, such discussions shall be accomplished in meetings open to public observation. In this regard, IP or the IAG, as the case may be, shall provide a minimum of five days advance notice to the other and to the Director of any such meeting. The Director shall make reasonable efforts to notify representatives of interested members of the public of
(
the meeting, but the inability of any such person to '
attend shall not be cause for delay or postponement of the meeting. Transcripts or written minutes of all such meetings should be prepared by the organization requesting the meeting and provided to - the NRC in a i
timely manner. Any portion of such meetings which deal with proprietary information may be closed to the public.
- 4. All-meetinge-between-+he -Geef.5-and-IP-end/or-4PC-*14-1 be-open-<e-9ub-14e -ob:r;; tion r-exe*pe-where-the- 6c+M de t e rmine s -- that-- 4+---ie --epproprin ee -- to-- awwlect--
- meetingfs)-in-private-with-BPG.
'l
[
All meetings with the Staff that include either IP or the IAG shall include the other, provided that the Staff' may determine that 'it is appropriate to conduct a meeting (s) in private with BPC.
- 5. All documents submitted to, or transmitted by, the NRC subject to this protocol, unless exempt from mandatory public disclosure, will be placed in the ,NRC Public Document Rooms in Clinton, Illinois, and Washington, D.C., and will be available there for public examination and copying, i- 6.'Bechtel or IP may schedule telephone conversations to discuss substantive matters or Bechtel's findings or conclusions. The organization scheduling such conversation shall provide notice thereof by telephone call on the - business day prior to such scheduled conversation to a representative designated by the NRC and a representative designated by the Attorney General of Illinois. Each such representative . may i
then request that a named individual be joined in a conference call for the scheduled conversation. .At the time of notification of the scheduled telephone conversation, the representatives of any - party may request a one ' day delay or postponement of the telephone conversation- which is being schedulad.
Bechtel or IP shall make reasonable efforts to notify the designated representatives and to join the named individuals in the conference call, but the inability tw - - - _ . - . .....,---r -
,.,-..&..,, -w.~- .._,-_-,....,-~,._,-,,,,c,v..__%--,-,..-.-..-,.,,,..%.-.,-t--.e-.--r.w-.,-- ----v.. v..--
..~ ..
to reach _ such representative or individual or tne unavailability of the individual for the conference
- call.shall not be cause for delay or postponement of the telephone conversation. Any telephone conversation may be recessed and then recommenced at a specified -time. Bechtel shall provide a written summary of each . conversation promptly and distribute such summary to the service list for the IDR.
T b
- 4
P Clinton Power Station 4
Independent Design Review i
- Standard Distribution List Director of Nuclear Beactor Regulation
- Terry Lash Director, niinois Department of c
Atta Mr. A. Schwencer. Chief Nuclear Safety
' f4*ama4=g Branch No. 2 Division' of Licensing 1035 Outer Park Drive
- 5. S. Nuclear Regulatory Commission Springfield, niinois 62704 Washington D.C. 20555 Allen Sanelson Esq.
- - Assistant Attorney General James G. Esppler Regional Ad=faiatrator Environmental Control Division
- Southern Region Region H I
- 5. S. Nuclear Regulatory Commission 500 South Second Street 799 Boosevelt Road Springfield Illinois 62706
.Glas Ellyn niinois 60137 Jean Foy Byron Siegel Spokesperson. Frairie Alliance Clinton Licensing Project Manager 511 W. Nevada l Mail Code 416 Urbana. Illinois 61801 -
U. S. Nuclear Regulatory Commission Washington D.C. 20555 Richard Hubbard l
MHB Technical Associates Fred Chr*istianson 1723 namfiton Avenue i
l Nail Code V-690 ,.
Suite E .
NBC Resident Office
- San Jose California 95125 Clinton Power Statica - Roger Isider
- 1. R. #3. Box 228 Sargent & Lundy Engineers Clinton. H11acis 61727 55 East Monroe Street Chicago, niinois 60605
Sectica Chief. Licensing Section Quality Assursace Branch William C. Gerstner Office of Inspection and Enforcement Executive Vice President
.n iinois Power Company Mail Stop EBS - 3055
- 5. S. Nuclear Regulatory Commission 500 5. 27th Street i-Washington, D. C. 20555 Decatur. Illinois 62525 L
l -
Richard C. Enop Donald P. Ball l Vice President L
Section Chief n iinois Power Company ~
. Projects Section 1-C Clinton Power Station s l U. S.' Nuclear Regulatory Commission F. O. Box 678~
799 Boosevelt Road Clinton, niinois 61727 Glen Ellyn niinois 60137 ,
Richard J. Goddard. Esq. Julius D. Geier I
Office of the Legal Director- Assistant to the Vice President
- niinois Power Company U. 8. Nacisar Esgulatory Commission l
Washtaston, D.C. 20555 Clinton Fever Station F. O. Box 675
l ,
Bew. 2 01/03/s5 0
OWP e 9 0
-t Frank A. Spangenberg Dirmetor. Esclear Licensing and Configuration Clinton Feuer Statica F. O. Box 627 Clintos, Illinois 61727
%elaos A. Esbel. Esq.
Schiff Nard'y & Waite 7200 Sears Tower Chicago.' Illinois 60606 Maurice Azelrad Newman & Roltsinger. F.C.
Suite 1000 2 . 1615 L Street N.W.
Washington, D.C. 20036
. Robert Brodsky-Basic Energy Technology Associates. Inc. ,
5031-A Backlick Ed.
F. O. Box 1207 . ,
a A=1=, Virginia 22003