|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217H6231999-10-18018 October 1999 Discusses Completion of Licensing Action for GL 98-01 & Suppl 1, Yr 2000 Readiness of Computer Sys at Npps, to All Holders of Operating Licenses for NPPs ML20217J4331999-10-15015 October 1999 Forwards Insp Rept 50-461/99-19 on 990913-17.One Violation Re Individual Failure to Follow Radiation Protection Procedures When Accessing High Radiation Area Noted & Being Treated as Noncited Violation U-603280, Forwards Rev 27 to Clinton Power Station Physical Security Plan,Iaw 10CFR50.54(p).Encl Withheld from Public Disclosure, Per 10CFR50.54(p)1999-10-12012 October 1999 Forwards Rev 27 to Clinton Power Station Physical Security Plan,Iaw 10CFR50.54(p).Encl Withheld from Public Disclosure, Per 10CFR50.54(p) ML20217C0871999-10-11011 October 1999 Forwards Proprietary Attachment Inadvertently Omitted from Encl 2 to Submitting Responses to NRC RAI Re License Transfer Application for Plant.Proprietary Encl Withheld U-603276, Forwards Rev 8 to CPS USAR, Which Includes Changes from 970701 Through 990630 & Available Changes Approved After 990630 That Reduce Overall Burden of Submittal Changes for Forthcoming Reporting period.10CFR50.59 Rept Included1999-10-0808 October 1999 Forwards Rev 8 to CPS USAR, Which Includes Changes from 970701 Through 990630 & Available Changes Approved After 990630 That Reduce Overall Burden of Submittal Changes for Forthcoming Reporting period.10CFR50.59 Rept Included U-603279, Forwards non-proprietary & Proprietary Responses to NRC RAI Re License Transfer Application for Plant.Attached Responses Also Respond to Comments of Environ Law & Policy Center Dtd 990920.Proprietary Encl Withheld1999-10-0707 October 1999 Forwards non-proprietary & Proprietary Responses to NRC RAI Re License Transfer Application for Plant.Attached Responses Also Respond to Comments of Environ Law & Policy Center Dtd 990920.Proprietary Encl Withheld U-603275, Provides Updated Illinois Power Rept on Status of Decommissioning Funding for Clinton Power Station1999-10-0707 October 1999 Provides Updated Illinois Power Rept on Status of Decommissioning Funding for Clinton Power Station ML20217A9881999-10-0101 October 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities ML20217A7361999-10-0101 October 1999 Forwards Insp Repts 50-461/99-14 & 50-461/98-12 on 990729-0908.Two Violations Identified,One Re Failure to Place Control Switch in Proper Position to Identify Piece of out-of-svc Equipment & Being Treated as NCVs ML20217J1251999-09-30030 September 1999 Refers to Investigation 3-1997-040 Conducted from 971028- 980921 & Forwards Nov.Investigations Determined That During Jan 1997,supervisor Qv Dept Discriminated Against Qv Inspector in Retaliation for Inspector Contacts with NRC ML20217J1421999-09-30030 September 1999 Refers to Investigation 3-97-040 Conducted from 971028- 980921 & Forwards Nov.Investigation Concluded That Recipient Engaged in Deliberate Misconduct in That Recipient Discriminated Againt Qv Inspector for Having Contacted NRC ML20212G6751999-09-22022 September 1999 Forwards Comment Submitted to NRC by Environ Law & Policy Ctr Re Proposed License Transfer for Clinton Power Station U-603272, Provides Update to Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. 3-D Monicore & Station Security Sys remediated.Y2K Readiness Disclosure for Cps,Encl1999-09-22022 September 1999 Provides Update to Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. 3-D Monicore & Station Security Sys remediated.Y2K Readiness Disclosure for Cps,Encl U-603225, Provides Closure of Util Commitments Re Ci Cv Noted in Previous Ltr to Nrc.Basis for Expecting Valves to Remain in leak-tight Condition Throughout Operating Cycle & Basis That Justifies Not Performing mid-cycle Leak Testing,Encl1999-09-20020 September 1999 Provides Closure of Util Commitments Re Ci Cv Noted in Previous Ltr to Nrc.Basis for Expecting Valves to Remain in leak-tight Condition Throughout Operating Cycle & Basis That Justifies Not Performing mid-cycle Leak Testing,Encl ML20212G6981999-09-20020 September 1999 Requests That NRC Reject Proposed License Transfer for Clinton Power Station & That NRC State That Public Interest in Safe Nuclear Power Industry Will Not Be Subordinated to Interest in Maximizing Profit by Limiting Liability ML20217H3421999-09-17017 September 1999 Forwards Request for Addl Info Re Licensee 990723 Application for License Transfer & Conforming Administrative License Amend.Response Requested within 20 Days of Receipt of Ltr 05000461/LER-1996-010, Forwards LER 96-010-01, Plant Shutdown Due to Unidentified RCS Leakage from Degraded Reactor Recirculation Pump Seal Greater than TS Limit. Revised Rept Includes Cause of Event,Corrective Actions & Discussion of Similar Events1999-09-13013 September 1999 Forwards LER 96-010-01, Plant Shutdown Due to Unidentified RCS Leakage from Degraded Reactor Recirculation Pump Seal Greater than TS Limit. Revised Rept Includes Cause of Event,Corrective Actions & Discussion of Similar Events 05000461/LER-1999-011, Forwards LER 99-011-00 Re Improper Restoration of a APRM Which Caused Monitor to Not Meet Seismic Qualification Requirements.Rept Contains Listed Commitments1999-09-10010 September 1999 Forwards LER 99-011-00 Re Improper Restoration of a APRM Which Caused Monitor to Not Meet Seismic Qualification Requirements.Rept Contains Listed Commitments U-603269, Certifies That DB Livingston,License OP-31136,successfully Completed Facility Licensees Requirements to Be Licensed as Ro,Per 10CFR55 & Has Need for RO License to Perform Assigned Duties.Five Significant Control Manipulations,Listed1999-09-10010 September 1999 Certifies That DB Livingston,License OP-31136,successfully Completed Facility Licensees Requirements to Be Licensed as Ro,Per 10CFR55 & Has Need for RO License to Perform Assigned Duties.Five Significant Control Manipulations,Listed ML20211Q2671999-09-0808 September 1999 Informs That NRC Tentatively re-scheduled Initial Licensing Exams for License Operator License Applicants During Weeks of June 5 & 12,2000.Validation of Exams Will Occur at Station During Weeks of May 15,2000 U-603229, Provides Response to NRC RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Dtd 990528.Rev 0 to Calculation IP-M-0556 & Rev 0 to Calculation IP-M-0570,encl1999-08-25025 August 1999 Provides Response to NRC RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Dtd 990528.Rev 0 to Calculation IP-M-0556 & Rev 0 to Calculation IP-M-0570,encl U-603243, Forwards Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Util Performing Testing of ESF Ventilation Sys Charcoal Samples Using ASTM D3803- 1989 Methodology as Required by TS 5.5.71999-08-23023 August 1999 Forwards Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Util Performing Testing of ESF Ventilation Sys Charcoal Samples Using ASTM D3803- 1989 Methodology as Required by TS 5.5.7 ML20211D2201999-08-23023 August 1999 Confirms 990817 Telcon with J Neuschwanger & D Mcneil Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Plant U-603258, Forwards ISI Summary Rept, IAW ASME Section Xi,Article IWA-6000.Summary Rept Addresses ISI Activities Performed at Plant from 950429-990527,including Extended Sixth Refueling Outage1999-08-23023 August 1999 Forwards ISI Summary Rept, IAW ASME Section Xi,Article IWA-6000.Summary Rept Addresses ISI Activities Performed at Plant from 950429-990527,including Extended Sixth Refueling Outage ML20211B0871999-08-20020 August 1999 Responds to J Hopkins Inquiry Re Application for Order Consenting to License Transfer & Approving Conforming Administrative License Amend Filed by Ilpr & Amergen Energy Co on 990723 U-603259, Provides Notification That Cl Kreidler Has Resigned Position with Util,Effective 990818.License Status Should Be Changed to Expired1999-08-19019 August 1999 Provides Notification That Cl Kreidler Has Resigned Position with Util,Effective 990818.License Status Should Be Changed to Expired ML20211A8931999-08-19019 August 1999 Forwards Insp Rept 50-461/99-13 on 990611-0728.Two Violations Noted & Being Treated as Ncvs.Violation Re Three Examples Where Licensee Procedural Requirements for Minor Maint Work Were Not Followed U-603253, Notifies NRC That Je Smith,License SOP-30819-1,has Resigned from Position with Ilpr Effective 990813.Status of License Should Be Changed to Expired,Effective 9908131999-08-16016 August 1999 Notifies NRC That Je Smith,License SOP-30819-1,has Resigned from Position with Ilpr Effective 990813.Status of License Should Be Changed to Expired,Effective 990813 ML20210U3771999-08-12012 August 1999 Forwards Notice of Consideration of Approval of Transfer of FOL & Issuance of Conforming Amend & Opportunity for Hearing Re Amend Request for Approval of Clinton Power Station License NPF-62 Transfer to Amergen U-603250, Notifies NRC That Ma Freihofer (License SOP-31296-1) Has Resigned from Position with Illinois Power Effective 990729 & License Status Should Be Changed to Expired Effective 9907291999-08-10010 August 1999 Notifies NRC That Ma Freihofer (License SOP-31296-1) Has Resigned from Position with Illinois Power Effective 990729 & License Status Should Be Changed to Expired Effective 990729 U-603249, Notifies NRC That He Bouska (License SOP-3055-1) Has Resigned from Position with Illnois Power Effective 990809. & License Status Should Be Changed to Expired Effective 9908091999-08-10010 August 1999 Notifies NRC That He Bouska (License SOP-3055-1) Has Resigned from Position with Illnois Power Effective 990809. & License Status Should Be Changed to Expired Effective 990809 ML20210N2961999-08-0909 August 1999 Forwards Form of Nuclear Decommissioning Master Trust Agreement,Per CPS Application for License Transfer & Conforming Administrative License Amend U-603248, Requests Unrestricted License for Kc Scott,License SOP-31532.Scott Has Successfully Completed Facility Licensee Requirements to Be Licensed as Operator/Senior Operator Per 10CFR551999-08-0606 August 1999 Requests Unrestricted License for Kc Scott,License SOP-31532.Scott Has Successfully Completed Facility Licensee Requirements to Be Licensed as Operator/Senior Operator Per 10CFR55 U-603236, Forwards Revised Data Point Ref File Sheets for Clinton Power Station Computer Points That Input to ERDS1999-08-0202 August 1999 Forwards Revised Data Point Ref File Sheets for Clinton Power Station Computer Points That Input to ERDS ML20210J0541999-07-30030 July 1999 Forwards Three Original Signature Pages of Gr Rainey for Application for License Transfer & Conforming Administrative License Amend, for NRC Files U-603178, Forwards Four ASME Section XI Relief Requests Re Performance of non-destructive Exams for First 120-month Inservice Insp for CPS1999-07-29029 July 1999 Forwards Four ASME Section XI Relief Requests Re Performance of non-destructive Exams for First 120-month Inservice Insp for CPS U-603237, Informs That Util Will Provide Response to fire-related Questions One & Two of NRC RAI Re CPS Ipeee,By 0001311999-07-28028 July 1999 Informs That Util Will Provide Response to fire-related Questions One & Two of NRC RAI Re CPS Ipeee,By 000131 U-603240, Forwards Clinton Power Station semi-annual Fitness for Duty Rept for Period Ending 990630,IAW 10CFR26.711999-07-27027 July 1999 Forwards Clinton Power Station semi-annual Fitness for Duty Rept for Period Ending 990630,IAW 10CFR26.71 U-603235, Forwards Application for License Transfer & Conforming Administrative License Amend for OL NPF-62.Proprietary & Nonproprietary Asset Purchase Agreement Encl.Proprietary Info Withheld,Per 10CFR2.7901999-07-23023 July 1999 Forwards Application for License Transfer & Conforming Administrative License Amend for OL NPF-62.Proprietary & Nonproprietary Asset Purchase Agreement Encl.Proprietary Info Withheld,Per 10CFR2.790 ML20210A4401999-07-16016 July 1999 Forwards Insp Rept 50-461/99-10 on 990422-0610.Four Violations Being Treated as Noncited Violations ML20209G7671999-07-12012 July 1999 Ack Receipt of Encl FEMA Correspondence ,which Transmitted FEMA Evaluation Rept for 981118 Biennial EP Exercise at Clinton Power Station.No Deficiencies Were Observed ML20209D5691999-07-0707 July 1999 Forwards Insp Rept 50-461/99-12 on 990607-11.No Violations Noted.Insp Consisted of Selective Exam of Procedures & Representative Records,Observations of Work in Progress & Interviews with Personnel U-603231, Forwards Summary of Status of Plan for Excellence (Pee) Initiatives & Clinton Power Station (CPS) 1999 Business Plan.Encl Documents Provide Status & Disposition for Actions Not Completed to Date1999-07-0707 July 1999 Forwards Summary of Status of Plan for Excellence (Pee) Initiatives & Clinton Power Station (CPS) 1999 Business Plan.Encl Documents Provide Status & Disposition for Actions Not Completed to Date U-603214, Forwards Results of Analysis Performed on Recently Completed Vendor Contracts,Per GL 83-28, Required Actions Based on Generic Implications of Salem ATWS Events1999-07-0606 July 1999 Forwards Results of Analysis Performed on Recently Completed Vendor Contracts,Per GL 83-28, Required Actions Based on Generic Implications of Salem ATWS Events ML20196J9651999-07-0202 July 1999 Confirms Discussion Between Members of Staffs to Conduct Meeting on 990714 at Clinton Power Station to Discuss Results of Restart Insp & Licensee Progress in Addressing Remaining Long Term C/A Actions to Sustain Improvements ML20196J7131999-06-30030 June 1999 Informs of Closure of Response to Requests for Addl Info to GL 92-01,Rev 1,Supplement 1, Reactor Vessel Structural Integrity, for Clinton Power Station Unit 1 U-603218, Provides Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. Attachment Provides Y2K Readiness Disclosure for Plant1999-06-28028 June 1999 Provides Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. Attachment Provides Y2K Readiness Disclosure for Plant U-603212, Forwards Response to NRC 990315 Telcon Re Proposed Amend of License NPF-62,implementing Feedwater Leakage Control Sys Mode of RHR Sys1999-06-24024 June 1999 Forwards Response to NRC 990315 Telcon Re Proposed Amend of License NPF-62,implementing Feedwater Leakage Control Sys Mode of RHR Sys U-603227, Provides Updated Rept on Status of Decommissioning Funding for Plant.Updated Rept Provides Min Decommissioning Fund Estimate,Per 10CFR50.75(b) & (C) Utilizing NUREG-1307,Rev 8 Methodology1999-06-24024 June 1999 Provides Updated Rept on Status of Decommissioning Funding for Plant.Updated Rept Provides Min Decommissioning Fund Estimate,Per 10CFR50.75(b) & (C) Utilizing NUREG-1307,Rev 8 Methodology ML20196A3471999-06-16016 June 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-461/99-11 Issued on 990430.Corrective Actions Will Be Examined During Future Inspections 1999-09-08
[Table view] Category:EXTERNAL CORRESPONDENCE
MONTHYEARML20247B4621998-03-27027 March 1998 Forwards Technical Bulletin 12 Addressing Problem Found at Illinois Power W/Power Semiconductor Clamps Used in Elgar Inverters.Procedure for Tightening Clamps Was Incorrect. Correct Method Involves Use of Force Gauge ML20102B4291992-07-15015 July 1992 Requests Mod to NPDES Permit IL0036919,adding Contributory Waste Stream Listing & Changing Approx Flow Value for Main Condenser Cooling Water at Outfall 002 & Adding Special Condition Re Treatment of DG Transformer at Outfall 005 ML20203M8581986-08-11011 August 1986 Responds to Request Re Status of Programs & Plans for Action Identified in Paragraph 7.a of ASLBP 850128 Joint Stipulation Preamble.Info Re FSAR Verification Program,Third Party Audits & Configuration Mgt Program Provided ML20102A1611985-02-0101 February 1985 Forwards Amend to Protocol Governing Conduct of Independent Design Review at Facility.Amend Constitutes Exhibit a to OL Proceedings & Was Effective on 850129 ML20106C3211985-01-18018 January 1985 Forwards Vols 1-6 of Independent Design Review for Illinois Power Co, Final Rept ML20099D4141984-11-14014 November 1984 Forwards Sargent & Lundy Response to Observation Rept 13, Rev 0,re Hot Gap Checks for Pipe Rupture Restraints ML20099D1251984-11-14014 November 1984 Forwards Sargent & Lundy Response to Rev 0 to Observation Rept 32 Re Potential Fault in Class 1E Ac Electrical Sys. Rept Reviewed by Util ML20099D1141984-11-14014 November 1984 Forwards Sargent & Lundy Response to Rev 0 to Observation Rept 25 Re Rigidity of Motor & Air Operated Valves W/Extended Masses.Rept Reviewed by Util ML20099C9191984-11-14014 November 1984 Forwards Sargent & Lundy Response to Rev 0 to Observation Rept 17 Re Possible Design Discrepancy in Shutdown Svc Water Sys Active Valves ML20099C9031984-11-14014 November 1984 Forwards Sargent & Lundy Response to Rev 0 to Observation Rept 31 Re Possible Design Discrepancy in Shutdown Svc Water Sys Valves 1SX095 a & B ML20099C7421984-11-14014 November 1984 Forwards Sargent & Lundy Response to Observation Rept 8, Rev 1,re Separation of non-Class 1E Components from Class 1E Dc Power Source ML20094B0791984-10-27027 October 1984 Forwards Errata to & Stenographic Rept of Clinton Independent Design Review First Progress Meeting Held in Rosemont,Il on 841016.Svc List Encl ML20106E2581984-10-23023 October 1984 Forwards List of 20 Engineering Design Areas Referred to in Section III D of Attachment 1 of & Sections 2.5, Evaluation of Sargent & Lundy Design Practices, Per NRC 841013 Request.W/O Encls ML20093J9111984-10-0909 October 1984 Forwards Proposed Agenda for First Progress Meeting on 841016 Re Independent Design Review ML20093K5941984-10-0909 October 1984 Forwards Addl Resumes for Personnel Joining Independent Design Review Team Since Submittal of Original Issue of Program Plan in Jul 1984 ML20093K6151984-10-0101 October 1984 Forwards Independent Design Review & Progress Rept for June-Sept 1984.Subsequent Repts to Be Issued Monthly ML20090H6631984-07-10010 July 1984 Forwards Review Plan & Rev 0 to Program Plan Dtd Jul 1984, Covering Independent Design Review,Per 840619 Request ML20090H8691984-06-26026 June 1984 Discusses Reasons for Selecting HPCS & Class IE Ac Electric Power Sys as Basis for Vertical Portion of Independent Design Review.Sys Offers Range of Functions & Technical Disciplines ML20092K2051984-06-22022 June 1984 Forwards Proposed Agenda for Independent Design Review 840628 Meeting in Bethesda,Md ML20092K1621984-06-22022 June 1984 Forwards Bechtel to Util Re Proposed Independent Design Review of HPCS Sys & Class IE Ac Power Sys & Util 840622 Response ML20092K2691984-06-19019 June 1984 Forwards Dp Hall Ltr to Jl Milhoun Transmitting Independent Design Review Protocol.W/O Encl ML19340B8671980-11-0303 November 1980 Comments on Environ Rept Per Area Fish & Wildlife Resources. Biological Monitoring Programs,Baseline Studies & Control of Soil Erosion by Plantings & Buffer Strips Satisfactorily Completed.Bottomland Timber Loss Should Be Mentioned 1998-03-27
[Table view] Category:EXTERNAL LETTERS ROUTED TO NRC
MONTHYEARML20203M8581986-08-11011 August 1986 Responds to Request Re Status of Programs & Plans for Action Identified in Paragraph 7.a of ASLBP 850128 Joint Stipulation Preamble.Info Re FSAR Verification Program,Third Party Audits & Configuration Mgt Program Provided ML20102A1611985-02-0101 February 1985 Forwards Amend to Protocol Governing Conduct of Independent Design Review at Facility.Amend Constitutes Exhibit a to OL Proceedings & Was Effective on 850129 ML20106C3211985-01-18018 January 1985 Forwards Vols 1-6 of Independent Design Review for Illinois Power Co, Final Rept ML20099D1251984-11-14014 November 1984 Forwards Sargent & Lundy Response to Rev 0 to Observation Rept 32 Re Potential Fault in Class 1E Ac Electrical Sys. Rept Reviewed by Util ML20099D1141984-11-14014 November 1984 Forwards Sargent & Lundy Response to Rev 0 to Observation Rept 25 Re Rigidity of Motor & Air Operated Valves W/Extended Masses.Rept Reviewed by Util ML20099C9191984-11-14014 November 1984 Forwards Sargent & Lundy Response to Rev 0 to Observation Rept 17 Re Possible Design Discrepancy in Shutdown Svc Water Sys Active Valves ML20099C9031984-11-14014 November 1984 Forwards Sargent & Lundy Response to Rev 0 to Observation Rept 31 Re Possible Design Discrepancy in Shutdown Svc Water Sys Valves 1SX095 a & B ML20099C7421984-11-14014 November 1984 Forwards Sargent & Lundy Response to Observation Rept 8, Rev 1,re Separation of non-Class 1E Components from Class 1E Dc Power Source ML20099D4141984-11-14014 November 1984 Forwards Sargent & Lundy Response to Observation Rept 13, Rev 0,re Hot Gap Checks for Pipe Rupture Restraints ML20094B0791984-10-27027 October 1984 Forwards Errata to & Stenographic Rept of Clinton Independent Design Review First Progress Meeting Held in Rosemont,Il on 841016.Svc List Encl ML20106E2581984-10-23023 October 1984 Forwards List of 20 Engineering Design Areas Referred to in Section III D of Attachment 1 of & Sections 2.5, Evaluation of Sargent & Lundy Design Practices, Per NRC 841013 Request.W/O Encls ML20093J9111984-10-0909 October 1984 Forwards Proposed Agenda for First Progress Meeting on 841016 Re Independent Design Review ML20093K5941984-10-0909 October 1984 Forwards Addl Resumes for Personnel Joining Independent Design Review Team Since Submittal of Original Issue of Program Plan in Jul 1984 ML20093K6151984-10-0101 October 1984 Forwards Independent Design Review & Progress Rept for June-Sept 1984.Subsequent Repts to Be Issued Monthly ML20090H6631984-07-10010 July 1984 Forwards Review Plan & Rev 0 to Program Plan Dtd Jul 1984, Covering Independent Design Review,Per 840619 Request ML20090H8691984-06-26026 June 1984 Discusses Reasons for Selecting HPCS & Class IE Ac Electric Power Sys as Basis for Vertical Portion of Independent Design Review.Sys Offers Range of Functions & Technical Disciplines ML20092K2051984-06-22022 June 1984 Forwards Proposed Agenda for Independent Design Review 840628 Meeting in Bethesda,Md ML20092K1621984-06-22022 June 1984 Forwards Bechtel to Util Re Proposed Independent Design Review of HPCS Sys & Class IE Ac Power Sys & Util 840622 Response ML20092K2691984-06-19019 June 1984 Forwards Dp Hall Ltr to Jl Milhoun Transmitting Independent Design Review Protocol.W/O Encl ML19340B8671980-11-0303 November 1980 Comments on Environ Rept Per Area Fish & Wildlife Resources. Biological Monitoring Programs,Baseline Studies & Control of Soil Erosion by Plantings & Buffer Strips Satisfactorily Completed.Bottomland Timber Loss Should Be Mentioned 1986-08-11
[Table view] |
Text
a, :. <
e >
g - '
sg On '4 +
eL40-84(11-l'4)-L
_l - =8G 150b'
~ ^
~~
[j:. - , .
lAllikOl8 POWER COMPANYI
,, ;~ , .
'~
( , C'i cumics Pcaen sTAricN. P.o. scx s7s. cusicN. WNcl$ 61N71 November _:14s.1984:
A t
Mr. Gordon L._ Parkinson.-
.Bechtel-Power Corporation. ~
. Fifty Beale Street. .
. San Francisco, CA 94119
Dear Mr. Parkinson:
' Enclosed is S&N s response to Observation Report Number-8, Rev. 1.
This' response has been reviewed-by; Illinois' Power.
. Sincerely yours' ,
^
l*
'N. R. Victor h S'f Manager, -
Nuclear Station. Engineering-DW/1m -
cc: See Attached Distribution List ,
e e
d i 'l 8411200047 4g g'4 ,
PDR ADOCK 0 461 A 'PDR 4
y: , nw _ w -
- . . .~ ~ ,
>;, y -
8 gn ,
- m
4 l .
(SAR 9EIYT W1UffIME f a: X :stn .T E E R 5
=. -
,oo...o....-
3( A, '
es sAst Monnot sints? -
8"ecaso, unois sooos ' ~'
m;. c. +siosa 4n uin ....aooat .
va see.m* * .
swa e,o.as,.near ,
' ~
~ SLMI- 13921 ' .
'- -Date s !!ovenhor 5,1984 Project No'.- 4536-51,;-53:
m zIllinois-Power' Company rClinton PoweraStation.
Unit 1 .
FIndependent. Design Review. '
- observation"and Resolution Reports.
'Mr. J. D. Geier -
Assistant to Vice President Illinois Powar Company
.500 South 27th Street
- Decatur,'2111nois 62525 .-
.y 4
Dear Mr. Geier:
Enclosed is a copy of- the below listed Resolution Re4 orts with tho -
proposed resolution (Items 5 and 6). completed.by Sargent & Lundy: -
Resolution Report Number 8, Revision 1
~
We for are also enclosing a copy of the corresponding Observation. Reports completeness.
Please review our proposed resolution and, if you concur, sign Item 7 of the Resolution Report and forward the report to the independent reviewer.
to Sargent tAlso, ' undy please for our return records. a copy of the signed Resolution Report Yours very truly,
'T O d.n' p.A R. C. Heider RCHand Project Manager Attachment - all recipients D. P. Hall E. L. Branch H. R. Victor B. A. Erler F. A. 'Spangenberg (originals) W. G. Schwartz L. E. Ackmann/W. A. Chittenden L. R. Stensland W. G. liegener H. S. Taylor E. V. Abraham R. A. Witt R. X.JFrench R. B. Johnson
- J. M. McLaughlin M. J. Shewski
.H. M. Sroka D. K. Schopfer 9
, ,, ,,y, .4 . + . - +
8
- s. .; .. ~--
~
) ;.. e V . : .;
' C' I w . -
t Jnb 15478433
- OBSERVATION REPCRT
+ - - File No. . OS File Revision No.- 0 !
Date 5eot. 25. m 4 1
.1. Level I classification of Observadon:-
Not significant to safety
" Recommendation for resolution" T Additional information required *See 5, Committee
_Significant to safety, send to Level 2 ,
- 2.~ Structure (s). systes(s), or compor.ent(s) involved:.
125 y de distribution' system, safety related control center undervoltage
^
relay and ground detection circuits
- 3. Description of Observation: .
- Circuits to' the tuo non-safety related (flSR). components' (undervoltage relay -
and
'($R) ground detector recording voltmeter)'of the.125 y de safety rela
~
device (fuse) ectuated by fault current. There is a discrepancy with FSAR .
Section 8.1.6.1.14 unich specifies that circuit breakers actuated by fault current are used as isolation davices only when two devices are.in series on the same circuit. , j
.b 4 Significance of Observation:
The 125 y de pc+rer systen is a Support systen for. the Class 1E ac power systms. Since the ceaeponents tre NSR, internal fault in the components
- during 03E could degrade the 53 tus. , ,
- 5. Rectmendation for resolution (optional):-
$41, should provids an explanation of why the discrepancy occurred, and an assessment of its safety significance. St.t. should justify the adequacy of '
the circuit design to meet the design ccanitment.
.. si,-tures MLL. A mv., %&A teve n 4evi. u - t.e ggg R J u lb. G L "/J" 4.M at
) .
0166C .
e i
- y n.
\
"y N[n&,p
~
. 1
., . ~ . .
n,,-
s r:- ,
s l, ,
CLINT0kPOWERSTATION f ~ Job 15478-003 +
~f' ? y ,
~
RESOLUT10N REPORT 3 cr + "
-08i y '
File'No.- '
- di <
File-Revision No.' 1 ~
- ,e '
~ Date November 5.1984 Internal Review Committee 1; Resolution by Leve1~ li
.e a
- 2. iClassification of Observation:: '
"a. Not valid,(see continuation sheet)
- b. Not significant to safety ss >
. c...
T Additional information required '
- d. Significanttosafety; s f
- :3. ' Program resolution is:-
- s. - Closed iten' '
.b. T Action to be taken by Reviewee r/G
~
- 4. Review Comittee signatures: d' . .A1 -
M b. % k N 'c k b
- \(.;
Mu es LW.
- 5. Reviewee proposed resolution:
- a. Description of proposed resolution:
(See Continuation Sheet)
- b. Basis of proposed resolution:
' (See Continuation Sheet)
- 6. Revieweeresponsereportsignedpy Date t.ngineer ; --
WY Manager .
_ Date '/
/h
~i
[_Datef /hgh et
- 7. Illinois Power Co. a view: .
7
/
I
, C 0166c .
t; : %=.#r me , w ,
j - -
k; ,jw@ D -. - -.
x.-* . . . .
m .
-. -.=
si n,.
= ,
. C!.nautfM,:ER STi410ll
~
7 c, ; Aob;15478-003' 4
'~'
RdOWTIW REPORT'. .
, (continuation sheet) - .- ,
's--
, Jih b. - 8 l'ile T.evistor, ilo. 1
=04te Movemb_er ' 5, 1384' e
Q:
- Sa. Descrtiption of Proposed Resolution: '
~
Sargent's Lundy has reviewed the application;and has determined-that a." discrepancy" does not exist. The separation of the non-Class lE components-from the Class lE-DC nower= source isa' achieved by -the application of one fuse each in the positive >
anu negative legs of tne ungrounded :DC' circult:as shown on. , -
. Saroent & Lundy Drawing I:03-lDC00, Sheet ' 6.
- 4 es
e E S
, e-e
9 ,
t
g e 9
s 9
+
{
o 6 + *
, G i
4 4 6 e'e ,
B 8 g g
( 0 0
+
e 9 '
h e 6
.u. - - -
a-- -- ~
g y ;
y k *. -
Q ,L40-84(11-14)-Li
, e-4 -
8G3 150brL
" ^
Clinton Power Station -, 9 IndependentDesigqRhview-
- Standard Distribution List Director of Nuclear Reactor Regulation Richard'J. Goddard. Esq.
Actes? E E~ h 7Chsef*""'" m N J Office of the Legal Director (Licinking Brf.nch' No'." 2 ""*N"""h U. S. Nuclear Regulatory Commission
- Division of Licensing ,
Washington, D.C. 20555
. U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Don Etchison Director,' Illinois Dep'artment of James G._Keppler Nuclear Safety-
-Regional Administrator 1035 Cuter Park Drive Region III .
Springfield, Illinois 62704 U. S. Nuclear Regulatory Commission . ,
Allen Samelson ,Esq.
799 Roosevelt' Road Glen Ellyn Illinois 60137 Assistant Attorney General
' Environmental Control Division
' Byron S'.esel Southern Region -
Clinton Licensing' Project Manager. '500 South Second Street Mail' Code 416 .
Springfield, Illinois 62706 U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Jean Foy .
Spokesperson, Prairie Alliance Fred Christianson 511 W.' Nevada
- Mail Code V-690 Urbana. Illinois 61801 NRC Resident Office Clinton Power Station Richard Hubbard R.R. #3, Box 228 MHB Technical Associates Clinton, Illinois 61727
Suite K James L. Milhoan ,
San Jose, California 95125 Section Chief. Licensing Section Quality Assurance Branch Gordon L. Parkinson Office of Inspection and Enforcement Bechtel Power Corporation Mail Stop EWS - 305A Fifty Beal Street U. S. Nuclear Regulatory Commission P. O. Box 3965
- Washington, D.C. 20555 San Francisco, California 94119 Richard C. Knop Roger Heider Section Chief Sargent & Lundy Engineers Projects Section 1-C 55 East Monroe Street U. S. Nuclear Regulatory Commission Chicago, Illinois 60603 799 Roosevelt Road Glen Ellyn, Illinois 60137 I
. _ . _ ~ _ . - _ . _ . - _ _ _ . - - - - _ _ - _ - - _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . - - - _ _ . _ . - _ - _ _ _ . _ _ _ _ . . - - . - _ _ _ _ _ _ _ - - _ _ _ . _ . - _ . - . _ _ - - . _ _ _ _ . - - _ - - .__ _ _ - . _ . . - - . . _ . _