ML20094B079
| ML20094B079 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 10/27/1984 |
| From: | Parkinson G BECHTEL GROUP, INC. |
| To: | Geier J ILLINOIS POWER CO. |
| Shared Package | |
| ML20094B082 | List: |
| References | |
| BLI-24, NUDOCS 8411070019 | |
| Download: ML20094B079 (1) | |
Text
r~;
I Bechtel Power Corporation Engineers-Constructors Fifty Beale Street San Francisco. California Mail Address: P O. Box 3%5 San Francisco. CA 94119 October 27, 1984 BLI-24 Mr. J. D. Geier Illinois Power Company 500 South 27th Street Decatur, Illinois 62525
Subject:
Clinton Power Station, Independent Design Review Illinois Power Company Job No.15478-003 First Progress Meeting
Dear Mr. Geier:
Enclosed is the stenographic report, as corrected by the attached errata, of the Clinton Independent Design Review first progress meeting held in the Holiday Inn, Rosemont, Illinois, October 16, 1984.
In the errata, an attempt has been made to correct only matters of substance, but not minor errors including those in spelling and grammar.
Bechtel adopts this corrected report as minutes of the meeting, pending receipt of any comments or questions that you may have.
Yours very truly,
^
h G. L. Parkinson
/
Project Manager GLP:nah Enclosure 8411070019 841027 PDR ADOCK 05000461 T
PDR cc: Service List pgsIonTED ORIGINAIl J-certified BY g 6AdL M ig,
-