(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Letter Sequence Approval |
---|
|
|
MONTHYEARML18141A5992018-06-0808 June 2018 U.S. NRC Revised Acceptance for Review of Topical Report WCAP-16747-P/WCAP-16747-NP, Appendices C and D, POLCA-T: System Analysis Code with Three Dimension Core Model, Appendices C and D Project stage: Acceptance Review ML18177A2702018-07-0909 July 2018 Summary of the Closed Audit June 11-12, 2018, of the Westinghouse Electric Company Topical Report WCAP-16747-P/WCAP-16747-NP, Appendices C and D, POLCA-T: System Analysis Code with Three-Dimensional Core Model, Appendices C and D. Project stage: Other ML20077J2872020-03-30030 March 2020 Closeout for the Review of Westinghouse Electric Company Topical Report WCAP-16747-P and WCAP-16747-NP Appendices C and D, Revision 0 and Revision 1, POLCA-T: System Analysis Code with Three-Dimensional Core Model, Appendices C and D Project stage: Approval 2018-07-09
[Table View] |
|
---|
Category:Letter
MONTHYEARML24289A0062024-10-21021 October 2024 Westinghouse Columbia Fuel Fabrication Facility Integrated Inspection Report 07001151/2024003 ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24228A2952024-08-15015 August 2024 Westinghouse Electric Company, LLC - NRC Semi-Annual Discharge Report (Jan - June 2024) ML24176A2762024-06-24024 June 2024 Westinghouse Electric Company LLC, Submittal of Slides for the June 27, 2024, Partially Closed Meeting with NRC Staff on the Designation of Buildings as Items Relied on for Safety ML24173A2992024-06-24024 June 2024 Westinghouse Columbia Fuel Fabrication Facility – Inspection Schedule for Calendar Year 2025 ML24138A1152024-05-21021 May 2024 Cover Letter - the U.S. Nuclear Regulatory Commission Approval Letter for Westinghouse Emergency Plan Change Request for Columbia Fuel Fabrication Facility ML24134A2742024-05-13013 May 2024 Submittal of Slide Packages for the May 16, 2024 Pre-Application Meeting with NRC on the Proposed License Amendment Request Re Low Enriched Uranium Plus Expansion at Columbia Fuel Fabrication Facility ML24128A2662024-05-13013 May 2024 Notification of New Licensing Project Manager for Westinghouses SNM-1151 for the Columbia Fuel Fabrication Facility ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24110A0502024-04-22022 April 2024 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2024001 ML24109A0002024-04-19019 April 2024 Public Meeting Summary - Licensee Performance Review for Westinghouse Columbia Fuel Fabrication Facility, Docket Number 70-1151 ML24110A1442024-04-19019 April 2024 Response to Request for Additional Information - Westinghouse Request for Prior Approval of Revision 24 of the Columbia Fuel Fabrication Facility (CFFF) Site Emergency Plan ML24080A5072024-03-20020 March 2024 Westinghouse, Request for Prior Approval of Revision 24 of the Columbia Fuel Fabrication Facility (CFFF) Site Emergency Plan ML24074A2962024-03-19019 March 2024 Cover Letter for WEC Correction to Amendment 3 ML24064A2542024-03-0707 March 2024 Westinghouse Electric Company, Licensee Performance Review of Licensed Activities - Nuclear Regulatory Commission Inspection Report No 70-1151/2024-005 ML24025A1292024-02-23023 February 2024 Westinghouse Electric Company, LLC, - Amendment 2, Request for Exemption from 24-Hour Reporting Requirement of Title 10 of the Code of Federal Regulations Paragraph 70.50(B)(1) ML24023A6952024-01-26026 January 2024 Westinghouse Columbia Fuel Fabrication Facility, U.S. Nuclear Regulatory Commission Inspection Report Number 07001151/2023004 ML24026A1512024-01-25025 January 2024 Westinghouse Electric Company, LLC, Notice of Intent to Fabricate Low Enriched Uranium (Leu+) ML24017A2252024-01-22022 January 2024 Westinghouse Electric Company, LLC, Conveyance of Revised Standby Trust Agreement to Support the Decommissioning Funding Plan (Enterprise Project Identifier L-2023-DFA-0009) ML23349A2722023-12-14014 December 2023 Westinghouse, Submittal of Monthly Progress Reports Under Consent Agreement 19-02-HW with the South Carolina Department of Health and Environmental Control ML23338A3372023-12-0404 December 2023 Submittal of Amendment 4 to Standby Trust Agreement (STA) for License Nu. SNM-1107, Replacement of Trust Fund with Additional Surety Bonds, and Certification of Financial Assurance for SNM-1107 ML23311A0032023-11-0606 November 2023 Westinghouse Columbia Fuel Fabrication Facility, U.S. Nuclear Regulatory Commission Inspection Report Number 70-1151/2023-402 (Cover Letter) ML23296A0362023-10-24024 October 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2023003 ML23240A5082023-08-28028 August 2023 Westinghouse Electric Company LLC - NRC Semi-Annual Discharge Report (January- June 2023) ML23230B2022023-08-18018 August 2023 Westinghouse, Supplemental Information for Request for Modification to Temporary License Conditions for Sampling, Analysis and Disposition of Hematite Ash Material ML23216A0712023-08-0404 August 2023 Westinghouse Columbia Fuel Fabrication Facility Physical Security Core Inspection Report 07001151/202340 ML23202A1472023-07-24024 July 2023 Westinghouse Columbia Fuel Fabrication Facility Integrated Inspection Report 07001151/2023002 ML23150A2362023-07-0303 July 2023 Letter to Westinghouse Regarding Effluent Testing Issue ML23184A1512023-06-29029 June 2023 Westinghouse Columbia Fuel 2023 Special Nuclear Material Inventory Summary Report Revision ML23171B1502023-06-20020 June 2023 Westinghouse Columbia Fuel 2023 Special Nuclear Material Inventory Summary Report ML23160A2612023-06-0909 June 2023 Westinghouse, Request for Modification to Temporary License Conditions for Sampling, Analysis and Disposition of Hematite Ash Material ML23139A1942023-06-0505 June 2023 Westinghouse Electric Company LLC - Approval of Environmental Sampling and Monitoring Program ML23138A3762023-05-18018 May 2023 Westinghouse Submittal of Columbia Fuel Fabrication Facility Site Emergency Plan, Revision 23 ML23096A2812023-05-15015 May 2023 Letter - Transfer of Control Approval 2023 ML23094A1582023-05-0505 May 2023 Westinghouse Electric Company, LLC - Revision to Temporarily Store Hematite Ash Above License Limits and Removal of Uranium Flywheel ML23115A2382023-04-26026 April 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2023001 ML23114A3592023-04-24024 April 2023 Westinghouse Submittal of Environmental Sampling and Monitoring Program for NRC Review and Approval ML23114A3612023-03-23023 March 2023 Enclosures 2 & 3 - SCDHEC Approval Letter of Westinghouse Ri Report, Dated March 23, 2023 and Environmental Sampling and Monitoring Program Section of SNM-1107 License Application ML23055A3022023-03-0808 March 2023 Letter - Westinghouse License Transfer Interim Threshold Determination ML23058A4482023-02-27027 February 2023 Request for Threshold Determination for Interim Transaction Included in December 20, 2022 Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals ML23058A2722023-02-27027 February 2023 Westinghouse, NRC Semiannual Discharge Report July - December 2022 ML23053A0712023-02-17017 February 2023 Westinghouse Electric Company LLC, Supplement to Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals and Request for Threshold Determination ML23053A0752023-02-17017 February 2023 Westinghouse Electric Co. - Supplement 2 to Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals and Request for Threshold Determination ML23047A4562023-02-16016 February 2023 Westinghouse, Response to Request for Additional Information - Request for Temporary License Amendment for Storage of Hematite Ash ML23024A2312023-01-30030 January 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151//2022004 ML23030B8552023-01-30030 January 2023 Westinghouse 10CFR70.72 Facility Change Report ML23013A2122023-01-27027 January 2023 Acceptance Letter for Westinghouse License Transfer - Cac/Epid L-2022-LLM-0004 ML23026A3642023-01-26026 January 2023 Westinghouse, January 2023 Updated Integrated Safety Analysis Summary ML22354A0732023-01-19019 January 2023 Response to Westinghouse Revised Funding Instrument in Support of the Decommissioning Funding Plan 2024-09-18
[Table view] |
Text
March 30, 2020 Ms. Camille Zozula, Manager Infrastructure & Facilities Licensing Westinghouse Electric Company 1000 Westinghouse Drive, Building 1, Suite 165 Cranberry Township, PA 16066
SUBJECT:
CLOSEOUT FOR THE REVIEW OF WESTINGHOUSE ELECTRIC COMPANY TOPICAL REPORT WCAP-16747-P AND WCAP-16747-NP APPENDICES C AND D, REVISION 0 AND REVISION 1, POLCA-T: SYSTEM ANALYSIS CODE WITH THREE-DIMENSIONAL CORE MODEL, APPENDICES C AND D (EPID L-2018-TOP-0003)
Dear Ms. Zozula:
By letter dated October 29, 2010, South Texas Project Nuclear Operating Company submitted for U. S. Nuclear Regulatory Commission (NRC) staff review Topical Report (TR)
WCAP-16747-P/WCAP-16747-NP, Appendices C and D, POLCA-T: System Analysis Code with Three-Dimensional Core Model, Appendices C and D. The NRC staff has performed an acceptance review of TR WCAP-16747-P/WCAP-16747-NP, Appendices C and D, captured in the NRC letter dated January 4, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML103500229). By letter dated November 26, 2012 (ADAMS Accession No. ML12320A210), the NRC issued a letter titled Request for list of planned TR submittals for FY2013, FY2014, and FY2015, and the fiscal year 2013 review priority of Westinghouse TRs under the Office of Nuclear Reactor Regulation (NRR) staff review, containing the list of the NRR staff priority Westinghouse Electric Company (Westinghouse) TRs based on the results of the NRR-wide prioritization review effort.
WCAP-16747-P/WCAP-16747-NP, Appendices C and D, TR did not make the list. Therefore, the NRR review of this TR was halted. When resources became available for the review of WCAP-16747-P/WCAP-16747-NP, Appendices C and D, the review was restarted per agreement between Westinghouse and the NRC staff. By letter dated February 8, 2017 (ADAMS Accession No. ML17044A006), Westinghouse submitted a request to suspend the review until first quarter of 2018. By letter dated March 6, 2017 (ADAMS Accession No. ML17054C841), the NRC issued the suspension of review letter.
By letter dated January 24, 2018 (ADAMS Accession No. ML18025B020), Westinghouse submitted to NRC a request to reactivate the review. By letter dated November 26, 2012 (ADAMS Accession No. ML12320A210), the NRC issued a revised acceptance letter (ADAMS Accession No. ML18141A599). The regulatory audit was conducted by the NRC staff on June 11-13, 2018, at Westinghouse office in Rockville, MD, to discuss draft request for additional information (RAI) questions. Westinghouse submitted Revision 1 to the originally submitted Revision 0 of TR by letter dated February 26, 2019 (ADAMS Accession No. ML19060A300) and submitted additional information in response to the audit by letter dated June 26, 2019 (ADAMS Accession No. ML19178A279). By email dated November 7, 2019 (ADAMS Accession No. ML19136A170), the final RAI questions were issued.
C. Zozula By letter dated February 26, 2020 (ADAMS Accession No. ML20059N711), Westinghouse requested a withdrawal of the TR WCAP-16747-P AND WCAP-16747-NP Appendices C and D, Revision 0 and Revision 1, from the NRC review at this time. Therefore, the NRC will be closing EPID: L-2018-TOP-0003 to ensure that no additional hours are charged to Westinghouse.
If you have questions regarding this matter, please contact Ekaterina Lenning at (301) 415-3151 or via e-mail at Ekaterina.Lenning@nrc.gov.
Sincerely,
/RA/
Dennis C. Morey, Chief Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 99902038
ML20077J287 *via e-mail OFFICE NRR/DORL/LLPB/PM NRR/DORL/LLPB/LA* NRR/DSS/SFNB/BC* NRR/DORL/LLPB/BC NAME ELenning DHarrison RLukes DMorey DATE 03/17/2020 03/27/2020 03/30/2020 03/30/2020