ML20079P403
From kanterella
ML20079P403 | |
Person / Time | |
---|---|
Site: | Brunswick ![]() |
Issue date: | 02/28/1983 |
From: | Eckert H, Nathan S, Dawn Powell NUS CORP. |
To: | |
Shared Package | |
ML20079P325 | List: |
References | |
RTR-NUREG-0737, RTR-NUREG-737, TASK-3.D.3.4, TASK-TM NUS-3697, NUS-3697-R02, NUS-3697-R2, NUDOCS 8303040605 | |
Download: ML20079P403 (153) | |
Similar Documents at Brunswick | |
---|---|
Category:GENERAL EXTERNAL TECHNICAL REPORTS
MONTHYEARML20210M8581999-05-14014 May 1999
[Table view]B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, Rev 0 ML20211L3711999-05-10010 May 1999 Rev 0 to ESR 98-00333, Unit 2 Invessel Feedwater Sparger Evaluation ML20151T5021998-08-0505 August 1998 Project Implementation Plan, Ngg Yr 2000 Readiness Program, Rev 2 ML20249B9691998-06-11011 June 1998 Rev 1 to VC44.F02, Brunswick Steam Electric Plant,Units 1 & 2,ECCS Suction Strainers Replacement Project,Nrc Bulletin 96-003 Final Rept ML20217E7031998-02-28028 February 1998 Rev 2 to ESR 97-00034, Engineering Evaluation B213R1 Core Shroud Insps ML20203M0141998-02-19019 February 1998 Rev 1 to ESR 9700706, Unit 1 Core Shroud Insp Results ML20199E9601997-12-31031 December 1997 Biological Assessment of Impact to Sea Turtles at CP&L Brunswick Steam Electric Plant ML20202E0441997-11-0606 November 1997 ECCS Suction Strainer Replacement Project,Nrc Bulletin 96-003,Final Rept ML20199A9251997-10-31031 October 1997 Rev 1 to ESR 97-00034, Engineering Evaluation B213R1 Core Shroud Insps ML20249B9751997-09-19019 September 1997 Rev 1 to Summary Rept on Performance of Performance Contracting,Inc'S Sure-Flow Suction Strainer W/Various Mixes of Simulated Post-LOCA Debris ML20198Q8791997-09-19019 September 1997 Rev 1 to Summary Rept on Performance of Performance Contracting,Inc Sure-Flow Suction Strainer W/Various Mixes of Simulated Post-LOCA Debris ML20217H8441997-07-22022 July 1997 Rev 0 to 97-00362, IF-300 Cask Design,Testing & Insp ML20217Q2751997-06-30030 June 1997 CP&L Fitness for Duty Program Performance Data for Period 970101-0630 ML20198P7431997-03-0303 March 1997 Partially Withheld Engineering Service Request,Rev 0 to ESR 97-00087, EQ-Type Jco for Improperly Configured Conduit Seals ML20140E2531997-02-14014 February 1997 Rev 0 to Summary Rept of Performance of Performance Contracting Inc'S Sure-Flow Suction Strainer W/Various Mixes of Simulated Post-LOCA Debris ML20198P5291997-02-12012 February 1997 Rev 1 to ESR 97-00087, EQ-Type Jco for Improperly Configured Conduit Seals. Also Encl,Viewgraphs Re Environ Qualification Issues & EA Request & Enforcement Strategy Forms ML20138F9511997-01-0707 January 1997 Evaluation of Design & Inspection History of Weld Overlay Repairs at Brunswick Nuclear Plant,Units 1 & 2 ML20199J8051996-12-31031 December 1996 Rev 0 to Performance Contracting,Inc ECCS Sure-Flow Strainer Data Rept ML20140E2431996-12-31031 December 1996 Rev 0 to W04536-01, Performance Contracting,Inc ECCS Sure- Flow Strainer Data Rept ML20249B9881996-12-31031 December 1996 Rev 0 to WO4536-01, Performance Contracting,Inc,Eccs Sure- Flow Strainer Data Rept ML20137V8121996-12-18018 December 1996 N-16 Nozzles Upper Shelf Energy Evaluation ML20135E3091996-10-31031 October 1996 Rev 0 to ESR 96-00160, Engineering Evaluation B111R1 Core Shroud Insp ML20108B9101996-02-0808 February 1996 Evaluate Results of U2 Core Shroud B212R1 Insps ML20092G3891995-09-30030 September 1995 Rev 0 to Brunswick Nuclear Plant Units 1 & 2 USI A-46 Relay Evaluation Rept, Final Rept ML20092G3951995-09-30030 September 1995 Rev 0 to Brunswick Nuclear Plant Units 1 & 2 USI A-46 Seismic Evaluation Rept, Final Rept ML20212H6101995-09-13013 September 1995 Site Assessment Rept,Unit 2 Radwaste Effluent Line. Page 2 of 2 in Visual Classification of Sails - Boring ESS3B Section of Incoming Submittal Not Included ML20237A5791995-08-11011 August 1995 Rev 1 to EER 92-0483, E41-V159 Testing Method Change ML20085K9311995-06-21021 June 1995 Unit 1 Core Shroud Evaluation Based on B11OR1 Insp Results ML20083R8081995-02-28028 February 1995 Suppl Reload Licensing Rept for Bsep,Unit 1,Reload 9 Cycle 10 ML20078M0491995-01-31031 January 1995 TS Improvement Analysis for Reactor Protection Sys for Brunswick Steam Electric Plant,Units 1 & 2 ML20072F2501994-08-16016 August 1994 RPV Surveillance Program First Capsule (300) Removal After 8 Fuel Cycles ML20072F2661994-06-30030 June 1994 Neutron Dosimetry Results for Surveillance Capsule Removed at Conclusion of Fuel Cycle 8 ML20072M8461994-06-0404 June 1994 Evaluation of Unit 2 Core Shroud Indications & Operability Assessment ML20079A5911994-06-0101 June 1994 Rev 0 to Engineering Evaluation Rept 94-0182, Unit 2 FW Sparger Evaluation Following Iviv Exams ML20069N8991994-05-31031 May 1994 Suppl Reload Licensing Rept for BSEP Unit 2 Reload 10 Cycle 11 ML20058M4451993-12-31031 December 1993 Shroud Repair Hardware Stress Analysis, Rev 1 ML20059K8461993-11-24024 November 1993 Rept of Technical Review Team:Potential Shroud Cracking in 1984 ML20056F6991993-08-18018 August 1993 Operability Assessment of Pinhole Leak in 6 Vital SW Header ML20058P8751993-07-31031 July 1993 Nonproprietary Suppl Reload Licensing Rept for BSEP Unit 1 Reload 8 Cycle 9 ML20094M2611993-04-16016 April 1993 Fatigue Usage to Date for RPV Components BSEP Unit 1 & Unit 2 ML20128G3121993-01-31031 January 1993 EMI Analysis Numac Leak Detection Monitor PM-92-108, Rev 2 to Plant Mod PM 92-108, Cbeaf Improvements1993-01-0808 January 1993 Rev 2 to Plant Mod PM 92-108, Cbeaf Improvements ML20128H8321992-12-19019 December 1992 Rev 1 to Design Basis Document DBD-37, Control Building, Heating,Ventilating & Air Conditioning Sys ML20128H7221992-10-30030 October 1992 Rev 0 to Engineering Evaluation Rept,Eer 92-0352, Cbeaf Single Failure Operability Assessment ML20114D9521992-08-31031 August 1992 Vols 1 & 2 to Brunswick Steam Electric Plant Units 1 & 2 Ipe ML20127N4511992-07-30030 July 1992 General Electric Nuclear Energy Ultrasonic Exam Rept R-1 ML20046A3201992-03-27027 March 1992 Rev 2 to SWS Hydraulic Analysis Rept for Bsep,Units 1 & 2. ML20056D5981991-12-0303 December 1991 Rev 0 to Engineering Evaluation Rept 91-0450, Unit 2 Svc Operability ML20099B9391991-11-30030 November 1991 Corrected GE-NE-523-112-1191, Feedwater Sparger Circumferential Cracking Evaluation for Brunswick Units 1 & 2 ML20086G3181991-07-31031 July 1991 Core Spray Line Crack Analysis Update for Brunswick Steam Electric Plant,Unit 2,Safety Evaluation 1999-05-14 Category:TEXT-SAFETY REPORT MONTHYEARML20217N3271999-10-21021 October 1999
[Table view]Part 21 Rept Re non-linear Oxygen Readings with Two (2) Model 225 CMA-X Containment Monitoring Sys at Bsep.Caused by High Gain Produced by 10K Resistor Across Second Stage Amplifier.Engineering Drawings Will Be Revised BSEP-99-0168, Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with ML20212D0431999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Brunswick Steam Electric Plant,Units 1 & 2 ML20210P9441999-08-10010 August 1999 Safety Evaluation Accepting Licensee Assessment of Impact on Operation of Plant,Unit 1,with Crack Indications of 2.11, 6.36 & 1.74 Inches in Three Separate Jet Pump Risers ML20210P9181999-08-10010 August 1999 Safety Evaluation Authorizing Request for Reliefs CIP-01,02, 06,07,08,09,10 & 11 (with Certain Exceptions) & 12-18,for Second 10-year ISI Interval.Request CIP-04 & 05 Would Result in hardship,CIP-03 Not Required & CIP-11 Denied in Part ML20210N2341999-08-0505 August 1999 SER Accepting Response to NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issues (USI) A-46 ML20210R1191999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Bsep,Units 1 & 2 ML20210R1311999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Bsep,Unit 2 BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20210M8581999-05-14014 May 1999 B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, Rev 0 ML20211L3711999-05-10010 May 1999 Rev 0 to ESR 98-00333, Unit 2 Invessel Feedwater Sparger Evaluation ML20206G1871999-05-0404 May 1999 Safety Evaluation Approving Third 10-year ISI Program Requests for Relief (RR) RR-08,RR-15 & RR-17 BSEP-99-0075, Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With ML20206N1791999-04-23023 April 1999 Rev 0 to 2B21-0554, Brunswick Unit 2,Cycle 14 Colr BSEP-99-0059, Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20205F9031999-03-30030 March 1999 Safety Evaluation Supporting Proposed Rev to BSEP RERP to Licenses DPR-62 & DPR-71,respectively ML20206N1831999-02-28028 February 1999 Rev 0 to Suppl Reload Licensing Rept for Bsep,Unit 2 Reload 13 Cycle 14 BSEP-99-0043, Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20203D7061999-02-0909 February 1999 SER Accepting Proposed Alternatives Contained in Relief Requests PRR-04,VRR-04,VRR-13,PRR-01,PRR-03,VRR-01.VRR-07, VRR-08 & VRR-09 Denied BSEP-99-0005, Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0231, Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0218, Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with BSEP-98-0210, Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections Repaired1998-10-30030 October 1998 Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections Repaired ML20154P8151998-10-16016 October 1998 SER Accepting Revised Safety Analysis of Operational Transient of 920117,for Plant,Unit 1 ML20154P8591998-10-16016 October 1998 SER Accepting Equivalent Margins Analysis for N-16A/B Instrument Nozzles for Plant,Units 1 & 2 BSEP-98-0202, Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20151Y6211998-09-14014 September 1998 BSEP Rept Describing Changes,Tests & Experiments, for Bsep,Units 1 & 2 ML20151Y6371998-09-14014 September 1998 Changes to QA Program, for Bsep,Units 1 & 2 BSEP-98-0185, Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20151T5021998-08-0505 August 1998 Project Implementation Plan, Ngg Yr 2000 Readiness Program, Rev 2 BSEP-98-0164, Monthly Operating Repts for July 1998 for BSEP Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for BSEP Units 1 & 2 ML20236T1961998-07-0101 July 1998 Rev 1 to 2B21-0088, Brunswick Unit 2,Cycle 13 Colr ML20236T1921998-07-0101 July 1998 Rev 1 to 1B21-0537, Brunswick Unit 1,Cycle 12 Colr BSEP-98-0142, Monthly Operating Repts for June 1998 for BSEP Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for BSEP Units 1 & 2 ML20236T1971998-06-30030 June 1998 Rev 2 to 24A5412, Supplemental Reload Licensing Rept for Brunswick Steam Electric Plant Unit 2 Reload 12 Cycle 13 ML20249B9691998-06-11011 June 1998 Rev 1 to VC44.F02, Brunswick Steam Electric Plant,Units 1 & 2,ECCS Suction Strainers Replacement Project,Nrc Bulletin 96-003 Final Rept BSEP-98-0129, Monthly Operating Repts for May 1998 for Bsep,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Bsep,Units 1 & 2 ML20151S9041998-05-31031 May 1998 Revised Pages to Monthly Operating Rept for May 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0104, Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 2 ML20151S8991998-04-30030 April 1998 Revised Pages to Monthly Operating Rept for Apr 1998 for Brunswick Steam Electric Plant,Unit 1 ML20247N7501998-04-30030 April 1998 Rev 0 to BSEP Unit 1,Cycle 12 Colr ML20247N7721998-04-30030 April 1998 Rev 0 to J1103244SRLR, Supplemental Reload Licensing Rept for BSEP Unit 1,Reload 11,Cycle 12 ML20217K8461998-04-24024 April 1998 Safety Evaluation Approving Proposed Use of Code Case N-535 at Brunswick Unit 1 During Second 10-yr Interval,Pursuant to 10CFR50.55a(a)(3)(i).Authorizes Use of Code Case N-535 Until Code Case Included in Future Rev of RG 1.147 ML20217K3941998-04-24024 April 1998 SER Approving Relief Request for Pump Vibration Monitoring, Brunswick Steam Electric Plant,Units 1 & 2 ML20217E6841998-04-23023 April 1998 Safety Evaluation Accepting Code Case N-547, Alternative Exam Requirements for Pressure Retaining Bolting of CRD Housings ML20217E7471998-04-21021 April 1998 Safety Evaluation Accepting Alternative to Insp of Reactor Pressure Vessel Circumferential Welds ML20217B5241998-04-20020 April 1998 SE Accepting Licensee Request for Approval to Use Alternative Exam Requirement for Brunswick,Unit 1,reactor Vessel Stud & Bushing During Second 10-yr ISI Interval Per 10CFR50.55a(a)(3)(ii) BSEP-98-0080, Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 2 ML20216B1041998-03-0404 March 1998 SER Approving Alternative to Insp of Reactor Pressure Vessel Circumferential Welds for Brunswick Steam Electric Plant, Unit 1 1999-09-30 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20079P403&oldid=2757850"