Proposed Tech Specs Re Definition of Surveillance Frequency
ML20086Q457
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 12/19/1991
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20086Q456 List:
References
NUDOCS 9112300206
Download: ML20086Q457 (3)


Text

.

ATTACilMENT 2 PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 TECHNICAL SPECIFICATION Cl!ANGES List of Attached Pages Unit 2 Unit 3 8 8 l

l l 9112300206 911219 PDA'fiDOCK 05000277 P- PDR

PHAPS 1.0 DErlNil10NS(Cont'd)

Simulated Automatic Actuation - Simulated automatic actuation means applying a simulated signal to the sensor to actuate the circuit in question. ~

t Site Boundary - That itne beyond which the land is not owned. Icased or otherwise  ;

controlled by licensee.

Source Check - A source check shall be the qualitative assessment of channcI response I shen the channel sensor is exposed to a radioactive source.

S,tartupfilot condenser low vacuum Standby an Mod _d main steam line isolation valve closure are bypa reactor protection system is energized with IRM neutron monitorirm system trip, the APRM 15% high flux trip, and control rod withdrawal interlocks in serv'ce. This is often l referred to as just Startup Mode. This is intended to imply the Startup/ Hot Standby position of the mode switch.

_examinations Surveillance shalfreque_ncy'p Fbe e rformed within the specified surveillanceSpecified intervals. Per periodic surveillance intervals are defined ast (N) Hours At least once per (N) hours Shiftly At least once per L2 hours Daily At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> '

(N) Days Atleastonceper(N) days Twice Per Week At least once per 4 days Weekly At least once per 7 days (N) Weeks Atleastonceper(7xN) days  !

Semi monthly At least once per 15 days Monthly At.least once per 31 days

  • 2 Month At least once per 61 days  :

Quarterly or 3 month At least once per 92 days Semi-anntalfy or 6 month At least once per 184 days Annually or 12 month At least once per 366 days

  • Once Per Cycle At least once per 550 days 18 month At least once per 550 days Refuel  !

At least once.per $50 days Years At least once per 366xN) days

Refuel Cycle At least once per 5boxW) days These specified time intervals scy be exceeded by 255. Surveillance te ns are not I f required on systems or parts of Lne systems that are not required to be operable or are tripped. If tests are missed on parts not required to be operable or ere tripped, then they shall be performed prior to returning the system to an operable status, t A surveillance test of the diesel generators, that requires-a plant outage, may be deferred beyond the calculated due date untti the next refueling outage, provided the equipment has been similarly tested and meets the: surveillance requirement for-the other unit. '

.l-Transition Bollino - Transition boiling means-the bolling regime between nucleate and'

' fTim boiling. Transition boiling is-the regime in which both nucleate and film boiling-occur intemittently with neither type being completely stable.-

Trip-System - A trip system means an arrangement of instrument channel trip signals and- '

auxiliary equipment required to initiate ,

'__ . _u_ . a_ . ~.._..a__ _ _ _ _ . _ _ . - _ _ . _ _ , . __.w_._

Unit 3 PBAPS 1.0 OfflNITIONS(Cont'd)

Simu_ lated Automatic Actuation - Simulated automatic actuation means applying a simulated signal to the sensor to actuate the circuit in question.

Site Bound - That line beyond which the land is not owned, Icased or otherwise controlled licensee.

Source Check - A source check shall be the qualitative assessment of channel response when the cfiinnel sensor is exposed to a radioactive source.

$_t_artup/Ilot Sthndhy Mode -- In this mode the reactor protection scram trips, initiated by conHeiiser low vacuum and main steam line isolation valve closure are bypassed, the reactor protection system is energized with IRH neutron monitoring system trip, the APRM 15% high flux trip, and control rod withdrawal interlocks in service. This is often referred to as just Startup Mode. This is intended to imply the Startup/llot Standby position of the mode switch.

Surveillance frequency - Periodic surveillance tests, checks, calibrations, and examinations sfEli be performed within the specified surveillance intervals. Specified periodic surveillance Intervals are defined as:

(N) Hours At least once per (h) hours Shiftly At Icast once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Daily At Icast once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (H) Days At 1 cast once per (N) days Twice Per Week At least once per 4 days Weekly At least once per 7 days (N) Weeks At least once per (7xN) days hmi monthly At Icast once per 15 days Monthly At least once per 31 days

? Month At least once per 61 days Quarterly or 3 month At least once per 92 days Semi-annually or 6 month At least once per 184 days Annually or 12 month At least once per 366 days Once Per Cycle At least once per $50 days 18 month At least once per 550 days Rt.f uci At least once per $50 days (N Years At least once per 366xN days (h))RefuelCycle At least once per 550xN days These specified time intervals may be exceeded by 25%. Survelliance tests are not I required on systems or parts of the systems that are not required to be operable or are tripped. If tests are missed on parts not required to be operabic or are tripped, then they shall be performed prior to returning the system to an operable status.

A surveillance test of the diesel generators, that requires a plant outage, may be deferred beyond the calculated due date until the next refueling outage, provided the equipment has been similarly tested and meets the surveillance requirement for the other unit.

l Transition Boiling - Transition bolling means the boiling regime between nucleate and film boiling. 1ransition boiling is the regime.in which both nucleate and film boiling cccur interuittently with neither type being completely stable.

Trip System - A trip system means an arrangement of instrument channel trip signals and auxiliary equipment required to initiate