ML20069P666

From kanterella
Revision as of 10:03, 28 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Supports Steam Generator Tube Sleeving
ML20069P666
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/29/1982
From: Blaha G, Engelbrecht L, Schmoock D
TWO RIVERS, WI
To: Bloch P
Atomic Safety and Licensing Board Panel
References
ISSUANCES-OLA, NUDOCS 8212080251
Download: ML20069P666 (1)


Text

r g; y, 4r - -

. - - c.;

c s--

L. m -

E w

5 w Mas TOWN OF TWO CREEKS 090EJF Mg ROUTE 3 h 's TWO RIVERS, WISCONSIN 54241 Jovember 29, 1982 ,g2 g c ,7 gjj ;}Q

.r 3 :.d.t im .

iich,U:n3 & SERVICE 2RAllCH Mr. Peter Bloch DOCKETNUMBF " gTO "

PR00. & UTIL FAC. . - -

g g Atomic bafety & Licensing Board Panel

, ,yf U. S. t'uclear Re6ulatory Concission 1-iashing ton , D. C. 20555

Dear Mr. Bloch:

lie , the Town Board of the Town of Two Creeks, representing the Town and its' People, vish to go on record of being in favor of the sleeving process to be made to the steam generator tubes in Unit 2 of the Point 3each Euclear Power Plant.

Ife have been at ending the various meetings ceing held regarding the sleeving and we realize that this process is necessary to maintain the efficiency and safety of the plant.

The Point Beach Huclear Power Plant is an economical and efficient way of producing; electricity for industrial and private use. This type of electricity must be maintained in order to have a prosperous state.

iiith kind re ards , we are

'fou rs truly, ToiTE OF Tii0 CRE3KS M w Gordon Blaha, Chaircan Lee Enge brecht, Gupervisor at -

Dale Schcoock, Supervicor mac 8212080251 821129 PDR ADOCK 05000266 G PDR

]b