ML20070W154

From kanterella
Revision as of 06:06, 27 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Eighteenth Motion for Summary Disposition of Contentions Necnp II.B.1,3,4 & 5.No Genuine Issue of Matl Fact Exists & Applicant Entitled to Favorable Decision.Related Correspondence
ML20070W154
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 02/14/1983
From: Dignan T, Gad R
PUBLIC SERVICE CO. OF NEW HAMPSHIRE, ROPES & GRAY
To:
Atomic Safety and Licensing Board Panel
Shared Package
ML20070W155 List:
References
ISSUANCES-OL, NUDOCS 8302180308
Download: ML20070W154 (3)


Text

_

a- .

, ~gemCC Filed: Ecbrunry 14, 1983

'p a' # ~^

00CKETED ,

U'URC j

'83 FEB 15 P4:00 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION before the ATOMIC SAFETY AND LICENSING BOARD

)

In the Matter of )

)

PUBLIC SERVICE COMPANY OF NEW ) Docket Nos. 50-443 OL HAMPSHIRE, et al. ) 50-444 OL

)

(Seabrook Station, Units 1 & 2) )

)

APPLICANTS' EIGHTEENTH MOTION FOR

SUMMARY

DISPOSITION (CONTENTIONS NECNP II.B.1, .3, .4 AND .5)

Pursuant to 10 CFR S 2.749, the Applicants hereby move for summary disposition of contentions NECNP II.B.1, .3, .4 and .5.

The motion is made on the basis of the affidavit of V. Lewis Killpack attached. This affidavit demonstrates that there is no triable issue of fact n

B302180308 830214 PDR ADOCK 05000443 O

5 PDR .

left with respect to NECNP contentions II.13.1., 3., 4.

and 5. and summary disposition is in order.

Respectfully., submitted,

- I ,~ j '

fhT Thomas G. Dignan, Jr.

R. K. Gad III Ropes & Gray 225 Franklin Street Boston, Massachus'etts 02110 Telephone: 423-6100 Dated: February 14, 1983 l

1 l

l

l 1 , i i

i STATMENT OF MATERIAL FACTS AS TO WHICH THERE IS NO DISPUTE

1. FSAR $ 17.2 does address the Appendix B Criteria in detail as shown on Figure I attached to the Killpack Affidavit.
2. The reporting line of the QA Department is in accord with NUREG-0731 recommendations.
3. The means by which it will be assured replacement materials and parts will be equivalent to original equipment is set forth in FSAR $ 17.2.4; the means by which it will-be assured that repaired or reworked components will be verified as acceptable is set forth in FSAR $ 17.2.15.
4. The QA/QC management organization is set out in FSAR 5 17.2.1.3.

1 1

-