ML030760306

From kanterella
Revision as of 00:25, 26 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
OTH004510, Correct the Problems Identified with the Point Beach Heps, Printed 08/28/2002
ML030760306
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 07/24/2002
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2003-0094 OTH004510
Download: ML030760306 (3)


Text

Page I of 3 Nuclear Management Company STATE CHANGE HISTORY Initiate .*

  • Assign *1 Assign Work n Conduct Work 51812002 11:09.56 AM 7/24/2002 4.03:55 PM Owner: RICK WOOD Owner RICK WOOD by RICK WOOD
  • by RICK WOOD 7Z V

SECTION 1 Activity Request Id: OTH00451 0 Other Submit Date: 5/8/2002 11:09.56 AM Activity Type:

Site/Unit: Point Beach - Common Activity Requested: Correct the problems identified with the Point Beach HEPs. If the HEPs no longer exist in the model, then the description in our data base should be eliminated.

George Baldwin - Kewaunee PRA will perform the work.

N Initiator: MASTERLARK, 0 CATPR:

JAMES 6 2]

EPP Engineering Initiator Department: EPN Engineering Responsible Group Code:

Programs Nuclear Programs PRA PB Safety Analysis PB t RICK WOOD Activity Supervisor:

Responsible Department: Engineering Activity Performer: RICK WOOD SECTION 2 12/20/2002 Priority: 4 Due Date:

N Mode Change Restraint: (None) Management Exception From PI?:

N 0 QA/Nuclear Oversight?: N 0 Licensing Review?:

NRC Commitment?: N 0 NRC Commitment Date:

SECTION 3 Activity Completed: 4/30/2002 4:14PM - RICK WOOD:

Operator actions assumed in the PRA model for the Component cooling water system, service water, aux feedwater, ECCS and the instrument air system were identified and forwarded to Operations The risk rank of the actions and the probability that the action would be performed incorrectly was also included.

5/8/2002 11:02.22 AM - RICK WOOD Operations (T. Vandenbosch) identified the following problems with the HEP forwarded to them:

Listed below are the comments associated with the HEPs" CCI-AOP9B-73 ....We do not take credit for crosstie of U1 and U2 CCW pumps CCW-AOP9B-73. ..We do not take credit for crosstie of U1 and U2 CCW pumps HEP-SW-RE-C-001 1.... Should be P32B.

HEP-SW-RE-C-0012....Should be P32C.

HEP-SW-RE-C-0013 ....Should be P32D

"NuclearManagement Company Page 2 of 3 HEP-SW-RE-C-0014....Should be P32E.

HEP-SW-RE-C-0015 ...Should be P32F.

HEP-SW480AOP10C5....AOP 0.0 Step 6.1 does not align anything to B08/B09.

AF-HEP-START1TD....Procedure guidance is given to start the TD AFW pump. I'm not sure how this fits into the actions not accomplished by the Operators.

AF-HEP-START2TD....Procedure guidance is given to start the TD AFW pump. I'm not sure how this fits into the actions not accomplished by the Operators.

Guidance is given for the following and I am not sure how this fits into the actions not accomplished by the operators:

RHR-ISO-RHRA RHR-ISO-RHRB RHR-OP-7A-o01 SI-ACCUM-IS SECTION 4 OA Supervisor: (None) Licensing Supervisor: (None)

SECTION 5 0 Project: CAP Activities & Actions 0 State: Conduct Work 0 Active/Inactive: Active AR Type: Parent 0 Owner: RICK WOOD Assigned Date: 7/24/2002

" Submitter: RICK WOOD IQ o Last Modifier: RICK WOOD

" Last Modified Date: 7/24/2002 4"03:55 PM 0 Last State Changer: RICKWOOD

" Last State Change Date: 7/24/2002 4.03:55 PM

" Close Date:

"Oone Line

Description:

Probabilistic Risk Assessment PRA For Auxiliary Feedwater System AFW NUTRK ID: CR 01-3595 Child Number: 0

References:

Update:

Import Memo Field:

SCOTT PFAFF n Site: Point Beach CAP Admin:

OLD_ACTIONNUM:

Cartridge and Frame:

ATTACHMENTS AND PARENT/CHILD LINKS SLinked From CAP001415 CHANGE HISTORY

- Nuclear Managemcnt Company Page 3 of 3 5/8/2002 11:10:09 AM by admin Last Modified Date Changed From 5/8/2002 11:09:56 AM To 5/8/2002 11:10.09 AM Last Modifier Changed From RICK WOOD To admin Attachment Added, Linked From CAP001415 7/24/2002 4:03:55 PM by RICK WOOD Due Date Changed From 11f20/2002 To 12/20/2002 State Changed From Assign Work To Conduct Work Via Transition: Assign Assigned Date Changed From 4/30/2002 To 7/24/2002 Last Modified Date Changed From 5/8/2002 11:10.09 AM To 7/24/2002 4.03.55 PM Last Modifier Changed From admin To RICK WOOD Last State Change Date Changed From 5/8/2002 11:09 56 AM To 7/2412002 4:03:55 PM